(Created claim: summary (P836): The operation concerns the replacement of the obsolete (since 1960), unsuitable by asbestos pipes and insufficient due to problems of multiple wear and long-term operation of the Euxinoupoli settlement of the Municipality of Almyros with new pipelines of modern specifications made of 3rd generation polyethylene, suitable for the transportation and distribution of drinking water. The new water supply network will be used to meet the water needs...) |
||||||||||||||
Property / summary | |||||||||||||||
The operation concerns the replacement of the obsolete (since 1960), unsuitable by asbestos pipes and insufficient due to problems of multiple wear and long-term operation of the Euxinoupoli settlement of the Municipality of Almyros with new pipelines of modern specifications made of 3rd generation polyethylene, suitable for the transportation and distribution of drinking water. The new water supply network will be used to meet the water needs of the residents of the settlement. The design of the water supply network was designed to ensure the required supply and taking into account the water supply needs of the next forty years. A total of 25.2 km of water supply pipelines are constructed/replaced. The construction of replacement of the entire network ensures the required supply, makes the distribution of water more flexible in case of failure or failure, and in particular reduces water losses from leakages by improving the quality of the drinking water supplied. (English) | |||||||||||||||
Property / summary: The operation concerns the replacement of the obsolete (since 1960), unsuitable by asbestos pipes and insufficient due to problems of multiple wear and long-term operation of the Euxinoupoli settlement of the Municipality of Almyros with new pipelines of modern specifications made of 3rd generation polyethylene, suitable for the transportation and distribution of drinking water. The new water supply network will be used to meet the water needs of the residents of the settlement. The design of the water supply network was designed to ensure the required supply and taking into account the water supply needs of the next forty years. A total of 25.2 km of water supply pipelines are constructed/replaced. The construction of replacement of the entire network ensures the required supply, makes the distribution of water more flexible in case of failure or failure, and in particular reduces water losses from leakages by improving the quality of the drinking water supplied. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation concerns the replacement of the obsolete (since 1960), unsuitable by asbestos pipes and insufficient due to problems of multiple wear and long-term operation of the Euxinoupoli settlement of the Municipality of Almyros with new pipelines of modern specifications made of 3rd generation polyethylene, suitable for the transportation and distribution of drinking water. The new water supply network will be used to meet the water needs of the residents of the settlement. The design of the water supply network was designed to ensure the required supply and taking into account the water supply needs of the next forty years. A total of 25.2 km of water supply pipelines are constructed/replaced. The construction of replacement of the entire network ensures the required supply, makes the distribution of water more flexible in case of failure or failure, and in particular reduces water losses from leakages by improving the quality of the drinking water supplied. (English) / qualifier | |||||||||||||||
point in time: 2 July 2021
|
Revision as of 13:39, 2 July 2021
Project Q2769299 in Greece
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2769299 in Greece |
Statements
500,632.0 Euro
0 references
80.0 percent
0 references
6 March 2017
0 references
5 March 2021
0 references
ΔΗΜΟΣ ΑΛΜΥΡΟΥ
0 references
Η πράξη αφορά στην αντικατάσταση του πεπαλαιωμένου (από το έτος 1960), ακατάλληλου από σωλήνες αμιάντου και ανεπαρκούς λόγω προβλημάτων πολλαπλών φθορών και μακροχρόνιας λειτουργίας εσωτερικού δικτύου ύδρευσης του οικισμού Ευξεινούπολης του Δήμου Αλμυρού με νέους αγωγούς σύγχρονων προδιαγραφών από πολυαιθυλένιο 3ης γενιάς, κατάλληλων για μεταφορά και διανομή πόσιμου νερού. Το νέο δίκτυο ύδρευσης θα χρησιμοποιείται για την κάλυψη των υδρευτικών αναγκών των κατοίκων του οικισμού. Ο σχεδιασμός του δικτύου ύδρευσης έγινε με στόχο την εξασφάλιση της απαιτούμενης παροχής και λαμβάνοντας υπόψη τις ανάγκες υδροδότησης της επόμενης τεσσαρακονταετίας. Συνολικά κατασκευάζονται / αντικαθίστανται αγωγοί δικτύου ύδρευσης μήκους 25,2 χιλιομέτρων. Με την κατασκευή αντικατάσταση του συνόλου του δικτύου εξασφαλίζεται η απαιτούμενη παροχή, καθίστατι πιο ευέλικτη η διανομή του νερού σε περίπτωση βλάβης ή αστοχίας, και κυρίως μειώνονται οι απώλειες νερού από διαρροές με βελτίωση της ποιότητας του παρεχόμενου πόσιμου νερού. (Greek)
0 references
The operation concerns the replacement of the obsolete (since 1960), unsuitable by asbestos pipes and insufficient due to problems of multiple wear and long-term operation of the Euxinoupoli settlement of the Municipality of Almyros with new pipelines of modern specifications made of 3rd generation polyethylene, suitable for the transportation and distribution of drinking water. The new water supply network will be used to meet the water needs of the residents of the settlement. The design of the water supply network was designed to ensure the required supply and taking into account the water supply needs of the next forty years. A total of 25.2 km of water supply pipelines are constructed/replaced. The construction of replacement of the entire network ensures the required supply, makes the distribution of water more flexible in case of failure or failure, and in particular reduces water losses from leakages by improving the quality of the drinking water supplied. (English)
2 July 2021