Energy renovation of the building Primary School Dr Fing Tuđana located in Rijeka 2, Lički Osik (Q2733151): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Rénovation énergétique du bâtiment de l’école primaire Dr Franjo Tuđman à l’adresse Rijeka 2, Lički Osik |
Revision as of 12:16, 26 November 2021
Project Q2733151 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the building Primary School Dr Fing Tuđana located in Rijeka 2, Lički Osik |
Project Q2733151 in Croatia |
Statements
2,122,559.13 Croatian kuna
0 references
4,431,109.19 Croatian kuna
0 references
85.0 percent
0 references
16 October 2018
0 references
31 August 2021
0 references
GRAD GOSPIĆ
0 references
Q2758324 (Deleted Item)
0 references
53000
0 references
Cilj projekta je smanjiti negativne učinke na okoliš kroz provedbu 4 mjere energetske učinkovitosti na zgradi OŠ Dr. Franje Tuđmana na adresi Riječka 2, Lički Osik u svrhu ostvarenja doprinosa smanjenju potrošnje energije u zgradama javnog sektora. Mjere energetske učinkovitosti su: (1) Vanjska ovojnica, (2) strop prema negrijanom, stropovi prema tavanu, (3) zamjena kotla na biomasu i (4) zamjena rasvjetnih tijela. Provedbom navedenih mjera očekuje se smanjenje godišnje potrošnje primarne energije za 791.605,92 kWh i smanjenje CO2 za 190 t/god te se uvodi korištenje OIE u predmetnoj zgradi. (Croatian)
0 references
The project aims to reduce the negative environmental impacts through the implementation of the 4 energy efficiency measures on the building by Dr. Francis Tuđana located in Rijeka 2, Lički Osik in order to contribute to reducing energy consumption in public sector buildings. Energy efficiency measures shall be: (1) External envelope, (2) ceiling bordering unheated, ceilings, (3) replacement of biomass boiler and (4) replacement of luminaires. These measures are expected to reduce annual primary energy consumption by 791 605.92 kWh and reduce CO2 by 190 t/yr and introduce the use of RES in the building concerned. (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0366
0 references