Preparation of a preparatory documentation for the project “Revitalisation of infrastructure of the regional transport system of the Żuławska Rail Transport System at sections of the Prwa Brzeg Wisły — Stegna — Artificial, Stegna — Nowy Dwór Gdański and Nowy Dwór Gdański — Nowy Dwór Gdański” (Q122357): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): Preparation of a preparatory documentation for the project “Revitalisation of infrastructure of the regional transport system of the Żuławska Rail Transport System at sections of the Prwa Brzeg Wisły — Stegna — Art and Sttegna — Nowy Dwór Gdański and Nowy Dwór Gdański — Nowy Dwór Gdański”, under which a detailed inventory of the line will be carried out, followed by a feasibility study, taking into account the scope and cost of the works in acco...)
Property / summary
 
Preparation of a preparatory documentation for the project “Revitalisation of infrastructure of the regional transport system of the Żuławska Rail Transport System at sections of the Prwa Brzeg Wisły — Stegna — Art and Sttegna — Nowy Dwór Gdański and Nowy Dwór Gdański — Nowy Dwór Gdański”, under which a detailed inventory of the line will be carried out, followed by a feasibility study, taking into account the scope and cost of the works in accordance with the standards in force in this respect. An information sheet for the project or an EIA report (in the case of a provision on the need to carry out an environmental impact assessment) in order to take the financial and in kind decisions on the intended regeneration. A useful utility programme will also be prepared. (English)
Property / summary: Preparation of a preparatory documentation for the project “Revitalisation of infrastructure of the regional transport system of the Żuławska Rail Transport System at sections of the Prwa Brzeg Wisły — Stegna — Art and Sttegna — Nowy Dwór Gdański and Nowy Dwór Gdański — Nowy Dwór Gdański”, under which a detailed inventory of the line will be carried out, followed by a feasibility study, taking into account the scope and cost of the works in accordance with the standards in force in this respect. An information sheet for the project or an EIA report (in the case of a provision on the need to carry out an environmental impact assessment) in order to take the financial and in kind decisions on the intended regeneration. A useful utility programme will also be prepared. (English) / rank
 
Normal rank

Revision as of 09:47, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Preparation of a preparatory documentation for the project “Revitalisation of infrastructure of the regional transport system of the Żuławska Rail Transport System at sections of the Prwa Brzeg Wisły — Stegna — Artificial, Stegna — Nowy Dwór Gdański and Nowy Dwór Gdański — Nowy Dwór Gdański”
Project in Poland financed by DG Regio

    Statements

    0 references
    850,000.0 zloty
    0 references
    204,000.0 Euro
    13 January 2020
    0 references
    1,230,000.0 zloty
    0 references
    295,200.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 June 2019
    0 references
    30 December 2020
    0 references
    POMORSKIE TOWARZYSTWO MIŁOŚNIKÓW KOLEI ŻELAZNYCH
    0 references
    Opracowanie dokumentacji przygotowawczej dla projektu „Rewitalizacja infrastruktury regionalnego systemu transportowego Żuławskiej Kolei Dojazdowej na odcinkach Prawy Brzeg Wisły – Stegna – Sztutowo, oraz Stegna – Nowy Dwór Gdański oraz Nowy Dwór Gdański Cmentarz – Nowy dwór Gdański”, w ramach którego zostanie wykonana szczegółowa inwentaryzacja linii a następnie opracowane studium wykonalności uwzględniające zakres i koszty robót zgodnie z obowiązującymi w tym zakresie standardami. Karta informacyjna przedsięwzięcia lub raport OOŚ (w przypadku jeżeli będzie Postanowienie o potrzebie prze prowadzenia oceny oddziaływania na środowisko) w celu podjęcia decyzji finansowych i rzeczowych zakresie planowanej rewitalizacji. Przygotowany zostanie także program funkcjonalno użytkowy. (Polish)
    0 references
    Preparation of a preparatory documentation for the project “Revitalisation of infrastructure of the regional transport system of the Żuławska Rail Transport System at sections of the Prwa Brzeg Wisły — Stegna — Art and Sttegna — Nowy Dwór Gdański and Nowy Dwór Gdański — Nowy Dwór Gdański”, under which a detailed inventory of the line will be carried out, followed by a feasibility study, taking into account the scope and cost of the works in accordance with the standards in force in this respect. An information sheet for the project or an EIA report (in the case of a provision on the need to carry out an environmental impact assessment) in order to take the financial and in kind decisions on the intended regeneration. A useful utility programme will also be prepared. (English)
    0 references

    Identifiers

    RPPM.09.02.02-22-0006/18
    0 references