Thermal rehabilitation of housing blocks in Rm. Valcea: Block B2, Block A6, Block N4, Block N5, Block 9 (Q2744334): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Tag: Replaced
Property / instance of
 
Property / instance of: Kohesio project / rank
Normal rank
 
Property / financed by
 
Property / financed by: European Union / rank
Normal rank
 
Property / intervention field
 
Property / intervention field: Energy efficiency renovation of public infrastructure, demonstration projects and supporting measures / rank
Normal rank
 
Property / country
 
Property / country: Romania / rank
Normal rank
 
Property / EU contribution
3,397,033.3 Romanian Leu
Amount3,397,033.3 Romanian Leu
UnitRomanian Leu
 
Property / EU contribution: 3,397,033.3 Romanian Leu / rank
Normal rank
 
Property / EU contribution
679,406.66 Euro
Amount679,406.66 Euro
UnitEuro
 
Property / EU contribution: 679,406.66 Euro / rank
Preferred rank
 
Property / EU contribution: 679,406.66 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / EU contribution: 679,406.66 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
6,660,849.6 Romanian Leu
Amount6,660,849.6 Romanian Leu
UnitRomanian Leu
 
Property / budget: 6,660,849.6 Romanian Leu / rank
Normal rank
 
Property / budget
1,332,169.92 Euro
Amount1,332,169.92 Euro
UnitEuro
 
Property / budget: 1,332,169.92 Euro / rank
Preferred rank
 
Property / budget: 1,332,169.92 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / budget: 1,332,169.92 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / co-financing rate
0.51 percent
Amount0.51 percent
Unitpercent
 
Property / co-financing rate: 0.51 percent / rank
Normal rank
 
Property / start time
1 March 2014
Timestamp+2014-03-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / start time: 1 March 2014 / rank
Normal rank
 
Property / end time
30 April 2020
Timestamp+2020-04-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 30 April 2020 / rank
Normal rank
 
Property / beneficiary name (string)
UAT Ramnicu Valcea
 
Property / beneficiary name (string): UAT Ramnicu Valcea / rank
Normal rank
 
Property / location (string)
VL, Localizare proiect: Regiunea Sud – Vest Oltenia, Mun. Rm. Valcea, jud. Valcea1. Blocul de locuinţa B2 - Aleea Primaverii nr.6,2. Blocul de locuinta A6 - Strada Crinilor nr.2,3. Blocul de locuinta N4 - Aleea Mioritei nr.3, 4. Blocul de locuinta N5 - Aleea Mioritei nr.2, 5. Blocul de locuinta 9 - Calea lui Traian nr. 179
 
Property / location (string): VL, Localizare proiect: Regiunea Sud – Vest Oltenia, Mun. Rm. Valcea, jud. Valcea1. Blocul de locuinţa B2 - Aleea Primaverii nr.6,2. Blocul de locuinta A6 - Strada Crinilor nr.2,3. Blocul de locuinta N4 - Aleea Mioritei nr.3, 4. Blocul de locuinta N5 - Aleea Mioritei nr.2, 5. Blocul de locuinta 9 - Calea lui Traian nr. 179 / rank
Normal rank
 
Property / summary
Lucrari care se vor executa: izolare termica a peretilor exteriori cu un strat de polistiren expandat ignifugat de 10 cm pe partea exterioara; inlocuirea ferestrelor si usilor existente cu ferestre tip termopan cu tamplarie de PVC cu 5 camere); inchiderea tuturor balcoanelor, inclusiv izolarea parapetilor de beton sau profile metalice si montare de tamplarie PVC tip termopan; inlocuirea si izolarea conductelor de distributie din subsol si montarea de robinete de reglare pe racordul retur; montarea conductei de recirculare pentru apa calda menajera; montarea de contoare energetice la reteaua de termoficare. (Romanian)
 
Property / summary: Lucrari care se vor executa: izolare termica a peretilor exteriori cu un strat de polistiren expandat ignifugat de 10 cm pe partea exterioara; inlocuirea ferestrelor si usilor existente cu ferestre tip termopan cu tamplarie de PVC cu 5 camere); inchiderea tuturor balcoanelor, inclusiv izolarea parapetilor de beton sau profile metalice si montare de tamplarie PVC tip termopan; inlocuirea si izolarea conductelor de distributie din subsol si montarea de robinete de reglare pe racordul retur; montarea conductei de recirculare pentru apa calda menajera; montarea de contoare energetice la reteaua de termoficare. (Romanian) / rank
Normal rank
 
Property / summary
Works that will be executed: thermal insulation of the exterior walls with an expanded flame retardant polystyrene layer of 10 cm on the outside; replacing existing windows and doors with double-glazed windows with 5-room PVC carpentry); closing of all balconies, including insulation of concrete parapets or metallic profiles and mounting of PVC carpentry type thermo resistant; replacement and insulation of distribution pipes in the basement and mounting of adjusting taps on the return connection; installation of the recirculation pipe for domestic hot water; installation of energy meters to the district heating network. (English)
 
Property / summary: Works that will be executed: thermal insulation of the exterior walls with an expanded flame retardant polystyrene layer of 10 cm on the outside; replacing existing windows and doors with double-glazed windows with 5-room PVC carpentry); closing of all balconies, including insulation of concrete parapets or metallic profiles and mounting of PVC carpentry type thermo resistant; replacement and insulation of distribution pipes in the basement and mounting of adjusting taps on the return connection; installation of the recirculation pipe for domestic hot water; installation of energy meters to the district heating network. (English) / rank
Normal rank
 
Property / summary: Works that will be executed: thermal insulation of the exterior walls with an expanded flame retardant polystyrene layer of 10 cm on the outside; replacing existing windows and doors with double-glazed windows with 5-room PVC carpentry); closing of all balconies, including insulation of concrete parapets or metallic profiles and mounting of PVC carpentry type thermo resistant; replacement and insulation of distribution pipes in the basement and mounting of adjusting taps on the return connection; installation of the recirculation pipe for domestic hot water; installation of energy meters to the district heating network. (English) / qualifier
point in time: 17 June 2021
Timestamp+2021-06-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / beneficiary
Q2754317 (Deleted Item)
 
Property / beneficiary: Q2754317 (Deleted Item) / rank
Normal rank
 

Revision as of 12:05, 14 September 2021

Project Q2744334 in Romania
Language Label Description Also known as
English
Thermal rehabilitation of housing blocks in Rm. Valcea: Block B2, Block A6, Block N4, Block N5, Block 9
Project Q2744334 in Romania

    Statements

    Identifiers

    117070
    0 references