Regulation of the transport infrastructure (Q2734941): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project will renovate the two infrastructures as part of the physical, economic and social regeneration of the depopulated areas — road reconstruction and the construction of a pedestrian cycle cycle in addition to the state road D7 in the Baden Vrh district road. The plan is reconstructed by the Princess Street of approximately 70 m in length and in connection to the streets of S.S. Kranjčević for a length of about 13 m, and build the road...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Regulation of the transport infrastructure

Revision as of 13:27, 3 June 2021

Project Q2734941 in Croatia
Language Label Description Also known as
English
Regulation of the transport infrastructure
Project Q2734941 in Croatia

    Statements

    0 references
    82,920.54 Croatian kuna
    0 references
    10,779.67 Euro
    2 June 2021
    0 references
    135,778.4 Croatian kuna
    0 references
    17,651.19 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    3 July 2020
    0 references
    2 December 2020
    0 references
    Grad Beli Manastir
    0 references

    45°46'22.33"N, 18°36'38.70"E
    0 references
    31300
    0 references
    Projektom će se obnoviti dvije infrastrukture kao dio fizičke, gospodarske i socijalne regeneracije depriviranih područja – rekonstrukcija prometnica i izgradnja pješačko-biciklističke staze uz državnu cestu D7 u prigradskom naselju Branjin Vrh. Plan je rekonstruirati Kneževačku ulice u duljini oko 70 m i priključak na ulicu S.S. Kranjčevića u duljini oko 13 m, te izgraditi kolni prilaz novoobnovljenom društvenom domu u Branjinom Vrhu i izgraditi pješačko-biciklističke staze u duljini oko 125 m te time povećati sigurnost sudionika u prometu te poboljšati postojeća vizura prigradskog naselja. (Croatian)
    0 references
    The project will renovate the two infrastructures as part of the physical, economic and social regeneration of the depopulated areas — road reconstruction and the construction of a pedestrian cycle cycle in addition to the state road D7 in the Baden Vrh district road. The plan is reconstructed by the Princess Street of approximately 70 m in length and in connection to the streets of S.S. Kranjčević for a length of about 13 m, and build the road side approach to a newly renewed social home in the Bvulnerable Summit and build walking cycle lanes around 125 m in length, and thereby enhance the safety of road users, and improve the existing quizzes on urban settlements. (English)
    3 June 2021
    0 references

    Identifiers

    KK.08.2.1.07.0013
    0 references