Energy renovation of the Primary School, Vladimir Nazora Škbrat (Q2733185): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — mod...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Energy renovation of the Primary School, Vladimir Nazora Škbrat |
Revision as of 12:54, 3 June 2021
Project Q2733185 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the Primary School, Vladimir Nazora Škbrat |
Project Q2733185 in Croatia |
Statements
1,342,811.81 Croatian kuna
0 references
3,569,762.19 Croatian kuna
0 references
85.0 percent
0 references
16 October 2018
0 references
16 October 2020
0 references
Osnovna škola Vladimira Nazora - Škabrnje
0 references
23223
0 references
Provedbene mjere energetske učinkovitosti (kombinacija pet građevinskih, jedna elektrotehnička i jedna strojarska mjera) odnose se na Osnovnu školu Vladimira Nazora u Škabrnji:- ugradnja toplinske izolacije vanjskih zidova i poda prema vanjskom prostoru- ugradnja toplinske izolacije stropa prema tavanu - ugradnja toplinske i hidroizolacije krovova iznad grijanog- zamjena vanjske stolarije- modernizacija unutarnje rasvjete- ugradnja termostatskih ventilašto će rezultirati uštedom energije za grijanje 50,01% u odnosu na postojeće stanje. Nakon izvršene rekonstrukcije, očekivani razred je "B". (Croatian)
0 references
Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — modernisation of internal lighting ventilation, leading to a 50.01 % heating saving compared to the existing situation. The expected class is ‘B’ after the completion of the reconstruction. (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0415
0 references