Energy renovation of the Primary School, Vladimir Nazora Škbrat (Q2733185): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — mod...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Energy renovation of the Primary School, Vladimir Nazora Škbrat

Revision as of 12:54, 3 June 2021

Project Q2733185 in Croatia
Language Label Description Also known as
English
Energy renovation of the Primary School, Vladimir Nazora Škbrat
Project Q2733185 in Croatia

    Statements

    0 references
    1,342,811.81 Croatian kuna
    0 references
    174,565.54 Euro
    2 June 2021
    0 references
    3,569,762.19 Croatian kuna
    0 references
    464,069.08 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    16 October 2018
    0 references
    16 October 2020
    0 references
    Osnovna škola Vladimira Nazora - Škabrnje
    0 references

    44°5'24.68"N, 15°27'4.36"E
    0 references
    23223
    0 references
    Provedbene mjere energetske učinkovitosti (kombinacija pet građevinskih, jedna elektrotehnička i jedna strojarska mjera) odnose se na Osnovnu školu Vladimira Nazora u Škabrnji:- ugradnja toplinske izolacije vanjskih zidova i poda prema vanjskom prostoru- ugradnja toplinske izolacije stropa prema tavanu - ugradnja toplinske i hidroizolacije krovova iznad grijanog- zamjena vanjske stolarije- modernizacija unutarnje rasvjete- ugradnja termostatskih ventilašto će rezultirati uštedom energije za grijanje 50,01% u odnosu na postojeće stanje. Nakon izvršene rekonstrukcije, očekivani razred je "B". (Croatian)
    0 references
    Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — modernisation of internal lighting ventilation, leading to a 50.01 % heating saving compared to the existing situation. The expected class is ‘B’ after the completion of the reconstruction. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0415
    0 references