Roads — Cesta 2 in the energy-waternorth construction area (Q2728153): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q2758649 / rank | |||
Normal rank |
Revision as of 13:31, 21 June 2021
Project Q2728153 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Roads — Cesta 2 in the energy-waternorth construction area |
Project Q2728153 in Croatia |
Statements
5,619,041.76 Croatian kuna
0 references
6,610,663.73 Croatian kuna
0 references
85.0 percent
0 references
19 October 2020
0 references
22 July 2021
0 references
GRAD VODNJAN-DIGNANO
0 references
52100
0 references
Projektom „Prometnica – cesta 2 u građevinskom području gospodarske namjene Vodnjan – sjever“ je predviđena izgradnja prometnice sa svom potrebnom infrastrukturom – oborinskom odvodnjom, fekalnom kanalizacijom, vodovodnom mrežom, javnom rasvjetom i elektrotehničkom instalacijom. Realizacijom predmetnog projekta stvorit će se nužni uvjeti za daljnji razvoj poduzetništva jer će pristupačnost poduzetničkoj zoni Vodnjan Sjever utjecati na povećanje popunjenosti Zone i povećanje aktivnosti postojećih korisnika iste. Općenito, unaprjeđenjem poduzetničke infrastrukture ostvariti će se niz pozitivnih učinaka za sadašnje i buduće korisnike Poduzetničke zone, te lokalnu zajednicu – Grad Vodnjan-Dignano i Urbano područje Pula. (Croatian)
0 references
The road project — road 2 in the construction sector — North — is intended to build the roads with all the necessary infrastructure — precipitation drainage, faecal sewage, water supply, public lighting and electrotechnical installation. The realisation of the project at issue will create the necessary conditions for the further development of entrepreneurship, since the accessibility of the enterprise zone Vodnjan has an impact on improving the occupation of the area and increasing the activity of existing users. In general, improving the entrepreneurial infrastructure will generate a range of positive impacts for the current and future users of the Entrepreneurs zone, and the local community — City of voljan-Dignano and Urbano district Pula. (English)
3 June 2021
0 references
Identifiers
KK.03.1.2.08.0001
0 references