Q2734743 (Q2734743): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The aim of the project is to adapt the infrastructure to the legal requirements in order to increase the safety of cyclists to Osijek stakeholders — Bilge ensured a flexible link to the public transport lines in the City of Osijek, which will be achieved by reconstruction or modernisation of the existing 4.2 km cycle corridor, the modernisation of the existing cycle track. Following the modernisation of the cycle, the safety of cyclists will be...)
Property / summary
 
The aim of the project is to adapt the infrastructure to the legal requirements in order to increase the safety of cyclists to Osijek stakeholders — Bilge ensured a flexible link to the public transport lines in the City of Osijek, which will be achieved by reconstruction or modernisation of the existing 4.2 km cycle corridor, the modernisation of the existing cycle track. Following the modernisation of the cycle, the safety of cyclists will be increased, the safety of cyclists will be increased and the Osijek public transport routes to Osijek with a view to increase the use of multimodal connections with cycling — or to increase the number of passengers in public transport — and reduce the use of passenger cars in transport in the context of the ‘Ba-Osijek’ route and through the City of Osijek. (English)
Property / summary: The aim of the project is to adapt the infrastructure to the legal requirements in order to increase the safety of cyclists to Osijek stakeholders — Bilge ensured a flexible link to the public transport lines in the City of Osijek, which will be achieved by reconstruction or modernisation of the existing 4.2 km cycle corridor, the modernisation of the existing cycle track. Following the modernisation of the cycle, the safety of cyclists will be increased, the safety of cyclists will be increased and the Osijek public transport routes to Osijek with a view to increase the use of multimodal connections with cycling — or to increase the number of passengers in public transport — and reduce the use of passenger cars in transport in the context of the ‘Ba-Osijek’ route and through the City of Osijek. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to adapt the infrastructure to the legal requirements in order to increase the safety of cyclists to Osijek stakeholders — Bilge ensured a flexible link to the public transport lines in the City of Osijek, which will be achieved by reconstruction or modernisation of the existing 4.2 km cycle corridor, the modernisation of the existing cycle track. Following the modernisation of the cycle, the safety of cyclists will be increased, the safety of cyclists will be increased and the Osijek public transport routes to Osijek with a view to increase the use of multimodal connections with cycling — or to increase the number of passengers in public transport — and reduce the use of passenger cars in transport in the context of the ‘Ba-Osijek’ route and through the City of Osijek. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:21, 3 June 2021

Project Q2734743 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2734743 in Croatia

    Statements

    0 references
    7,469,169.05 Croatian kuna
    0 references
    970,991.98 Euro
    2 June 2021
    0 references
    9,276,718.23 Croatian kuna
    0 references
    1,205,973.37 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    3 September 2019
    0 references
    3 September 2021
    0 references
    OPĆINA BILJE
    0 references
    0 references

    45°36'15.95"N, 18°44'39.12"E
    0 references
    31327
    0 references
    Cilj projekta je prilagodba infrastrukture zakonskim zahtjevima kako bi se povećala sigurnost biciklista na dionici Osijek – Bilje te omogućila fleksibilna veza prema linijama javnog prijevoza u Gradu Osijeku, što će se ostvariti rekonstrukcijom odnosno modernizacijom postojeće biciklističke staze u dužini od 4,2 km. Nakon provedene modernizacije biciklističke staze, povećati će se sigurnost biciklista ali i otvoriti veza prema linijama javnog gradskog prijevoza u Osijeku sa namjerom povećanja korištenja multimodalne veze bicikli-tramvaj-autobus, odnosno povećanje broja putnika u javnom prijevozu, i smanjenje korištenja osobnih automobila u prometu na relaciji Bilje-Osijek i kroz Grad Osijek. (Croatian)
    0 references
    The aim of the project is to adapt the infrastructure to the legal requirements in order to increase the safety of cyclists to Osijek stakeholders — Bilge ensured a flexible link to the public transport lines in the City of Osijek, which will be achieved by reconstruction or modernisation of the existing 4.2 km cycle corridor, the modernisation of the existing cycle track. Following the modernisation of the cycle, the safety of cyclists will be increased, the safety of cyclists will be increased and the Osijek public transport routes to Osijek with a view to increase the use of multimodal connections with cycling — or to increase the number of passengers in public transport — and reduce the use of passenger cars in transport in the context of the ‘Ba-Osijek’ route and through the City of Osijek. (English)
    3 June 2021
    0 references

    Identifiers

    KK.07.4.2.16.0009
    0 references