Q2733027 (Q2733027): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The general county hospital (the ‘Požega’) building is three buildings composed of five sections connecting interconnections and includes the building of the pathology in the definition of the energy functional unit. The buildings have been built in several phases since the 30s and until 1986 years old. The construction method did not meet the modern standards of saving and rational energy use. The energy renovation project will reduce the usefu...) |
||||||||||||||
Property / summary | |||||||||||||||
The general county hospital (the ‘Požega’) building is three buildings composed of five sections connecting interconnections and includes the building of the pathology in the definition of the energy functional unit. The buildings have been built in several phases since the 30s and until 1986 years old. The construction method did not meet the modern standards of saving and rational energy use. The energy renovation project will reduce the useful heating energy of 1 344 585.44 kWh/a (67.04 %) for heating in construction and electrical engineering, and reduce annual CO2 emissions by 244 289.77 kg (65.12 %). The building will move from energy class B to energy class B and the Bolnica will be able to focus its financial savings on healthcare. (English) | |||||||||||||||
Property / summary: The general county hospital (the ‘Požega’) building is three buildings composed of five sections connecting interconnections and includes the building of the pathology in the definition of the energy functional unit. The buildings have been built in several phases since the 30s and until 1986 years old. The construction method did not meet the modern standards of saving and rational energy use. The energy renovation project will reduce the useful heating energy of 1 344 585.44 kWh/a (67.04 %) for heating in construction and electrical engineering, and reduce annual CO2 emissions by 244 289.77 kg (65.12 %). The building will move from energy class B to energy class B and the Bolnica will be able to focus its financial savings on healthcare. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The general county hospital (the ‘Požega’) building is three buildings composed of five sections connecting interconnections and includes the building of the pathology in the definition of the energy functional unit. The buildings have been built in several phases since the 30s and until 1986 years old. The construction method did not meet the modern standards of saving and rational energy use. The energy renovation project will reduce the useful heating energy of 1 344 585.44 kWh/a (67.04 %) for heating in construction and electrical engineering, and reduce annual CO2 emissions by 244 289.77 kg (65.12 %). The building will move from energy class B to energy class B and the Bolnica will be able to focus its financial savings on healthcare. (English) / qualifier | |||||||||||||||
point in time: 3 June 2021
|
Revision as of 12:52, 3 June 2021
Project Q2733027 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2733027 in Croatia |
Statements
12,863,797.62 Croatian kuna
0 references
21,354,220.01 Croatian kuna
0 references
85.0 percent
0 references
9 October 2018
0 references
9 October 2020
0 references
OPĆA ŽUPANIJSKA BOLNICA POŽEGA
0 references
34000
0 references
Zgradu Opće županijske bolnice Požega čine tri zgrade sastavljene od pet dijelova koje su međusobno povezane spojnim hodnicima, a pri definiranju energetski funkcionalne cjeline uključena je i zgrada patologije. Zgrade su građene u više faza u razdoblju od 30.-ih godina prošloga stoljeća pa sve do 1986. godine. Način gradnje nije odgovarao suvremenim standardima uštede i racionalnog korištenja energije. Projektom energetske obnove će se građevinskim i elektrotehničkim mjerama smanjiti korisna energija za grijanje za 1.344.585,44 kWh/a (67,04%), a godišnja emisija CO2 smanjit će se za 244.289,77 kg (65,12%). Zgrada će iz energetskog razreda F prijeći u energetski razred B, a Bolnica će svoju financijsku uštedu moći usmjeriti na zdravstvo. (Croatian)
0 references
The general county hospital (the ‘Požega’) building is three buildings composed of five sections connecting interconnections and includes the building of the pathology in the definition of the energy functional unit. The buildings have been built in several phases since the 30s and until 1986 years old. The construction method did not meet the modern standards of saving and rational energy use. The energy renovation project will reduce the useful heating energy of 1 344 585.44 kWh/a (67.04 %) for heating in construction and electrical engineering, and reduce annual CO2 emissions by 244 289.77 kg (65.12 %). The building will move from energy class B to energy class B and the Bolnica will be able to focus its financial savings on healthcare. (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0160
0 references