Q2733417 (Q2733417): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, th...) |
||||||||||||||
Property / summary | |||||||||||||||
The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English) | |||||||||||||||
Property / summary: The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English) / qualifier | |||||||||||||||
point in time: 3 June 2021
|
Revision as of 12:58, 3 June 2021
Project Q2733417 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2733417 in Croatia |
Statements
2,180,492.2 Croatian kuna
0 references
6,818,987.4 Croatian kuna
0 references
85.0 percent
0 references
19 April 2019
0 references
19 April 2021
0 references
GRAD CRIKVENICA
0 references
51260
0 references
Osnovna škola Zvonka Cara smještena je u objektu neadekvatnih konstrukcijskih elemenata u smislu energetske učinkovitosti. Rekonstrukcijom objekta za potrebe škole pridonijet će se poboljšanju uvjeta boravka djece te smanjenju troškova poslovanja. Na objektu se planira provesti mjera toplinske izolacije na vanjske zidove,kosog i ravnog krova zamjena stolarije, strop iznad vanjskog zraka,strop prema tavanu a čime će se postići značajne uštede u potrošnji energije Qh,nd 142.715,37 kWh/a (73,70 %) odnosno sam cilj ovog projekta - povećanje energetske učinkovitosti zgrade. (Croatian)
0 references
The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0761
0 references