Q2733417 (Q2733417): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, th...)
Property / summary
 
The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English)
Property / summary: The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English) / rank
 
Normal rank
Property / summary: The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:58, 3 June 2021

Project Q2733417 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2733417 in Croatia

    Statements

    0 references
    2,180,492.2 Croatian kuna
    0 references
    283,463.99 Euro
    2 June 2021
    0 references
    6,818,987.4 Croatian kuna
    0 references
    886,468.36 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    19 April 2019
    0 references
    19 April 2021
    0 references
    GRAD CRIKVENICA
    0 references

    45°10'24.89"N, 14°41'29.44"E
    0 references
    51260
    0 references
    Osnovna škola Zvonka Cara smještena je u objektu neadekvatnih konstrukcijskih elemenata u smislu energetske učinkovitosti. Rekonstrukcijom objekta za potrebe škole pridonijet će se poboljšanju uvjeta boravka djece te smanjenju troškova poslovanja. Na objektu se planira provesti mjera toplinske izolacije na vanjske zidove,kosog i ravnog krova zamjena stolarije, strop iznad vanjskog zraka,strop prema tavanu a čime će se postići značajne uštede u potrošnji energije Qh,nd 142.715,37 kWh/a (73,70 %) odnosno sam cilj ovog projekta - povećanje energetske učinkovitosti zgrade. (Croatian)
    0 references
    The Zvonka Cara’s primary school is located in an establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility for the purpose of the school will contribute to improving the conditions of residence of children and reducing the cost of doing business. At the facility, thermal insulation measures are planned to be implemented on the external walls, cosog and flat roof, the replacement of joinery, the ceiling above the outside air, the ceiling towards the pan, which will lead to significant savings in the energy consumption Qh, nd 142 715.37 kWh/a (73.70 %) and the very objective of this project, namely to increase the energy performance of the building. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0761
    0 references