Q2732602 (Q2732602): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The Green port firm is implementing measures to increase energy efficiency and the use of RES by reducing the consumption of electricity through the installation of a photovoltaic power plant and the introduction of a modern central oversight management system through the implementation of planned activities, the percentage of energy savings achieved will be equal to 39.09 %, the total savings achieved will be 27 950 kWh and the total amount of...)
Property / summary
 
The Green port firm is implementing measures to increase energy efficiency and the use of RES by reducing the consumption of electricity through the installation of a photovoltaic power plant and the introduction of a modern central oversight management system through the implementation of planned activities, the percentage of energy savings achieved will be equal to 39.09 %, the total savings achieved will be 27 950 kWh and the total amount of CO2 savings will be HRK 629700,00, of which eligible costs HRK 503.760,00, and the aid is HRK 414.508,00. (English)
Property / summary: The Green port firm is implementing measures to increase energy efficiency and the use of RES by reducing the consumption of electricity through the installation of a photovoltaic power plant and the introduction of a modern central oversight management system through the implementation of planned activities, the percentage of energy savings achieved will be equal to 39.09 %, the total savings achieved will be 27 950 kWh and the total amount of CO2 savings will be HRK 629700,00, of which eligible costs HRK 503.760,00, and the aid is HRK 414.508,00. (English) / rank
 
Normal rank
Property / summary: The Green port firm is implementing measures to increase energy efficiency and the use of RES by reducing the consumption of electricity through the installation of a photovoltaic power plant and the introduction of a modern central oversight management system through the implementation of planned activities, the percentage of energy savings achieved will be equal to 39.09 %, the total savings achieved will be 27 950 kWh and the total amount of CO2 savings will be HRK 629700,00, of which eligible costs HRK 503.760,00, and the aid is HRK 414.508,00. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:04, 3 June 2021

Project Q2732602 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2732602 in Croatia

    Statements

    0 references
    412,908.0 Croatian kuna
    0 references
    53,678.04 Euro
    2 June 2021
    0 references
    501,760.0 Croatian kuna
    0 references
    65,228.8 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    26 February 2019
    0 references
    30 June 2021
    0 references
    ZELENA LUKA d.o.o. za ugostiteljstvo i turizam
    0 references

    43°47'50.89"N, 15°38'31.60"E
    0 references
    22240
    0 references
    Poduzeće Zelena luka d.o.o. ovim projektom provodi mjere povećanja energetske učinkovitosti i korištenja OIE na način da smanjuje potrošnju elektične energije postavljanjem fotonaponske elektrane te uvođenjem suvremenog centralnog nadzorno upravljačkog sustava.Provedbom planiranih aktivnosti, postotni iznos ostvarenih ušteda isporučene energije iznositi će 39,09%, ukupno ostvarene uštede isporučene energije iznositi će 27950 kWh, a smanjenje emisija CO2 iznositi će 6,56294 t/god.Ukupna vrijednost projekta iznosi 629700,00 kn, od čega prihvatljivi troškovi 503.760,00 kn, a potpora iznosi 414.508,00 kn. (Croatian)
    0 references
    The Green port firm is implementing measures to increase energy efficiency and the use of RES by reducing the consumption of electricity through the installation of a photovoltaic power plant and the introduction of a modern central oversight management system through the implementation of planned activities, the percentage of energy savings achieved will be equal to 39.09 %, the total savings achieved will be 27 950 kWh and the total amount of CO2 savings will be HRK 629700,00, of which eligible costs HRK 503.760,00, and the aid is HRK 414.508,00. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.1.2.01.0102
    0 references