Construction of the Integrated Neighbours Centre in Imilinie (Q124075): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The planned connecting traffic centre will be located in the area of the railway station of PKP in Imilinie Street at ul. Dunikowski and ul. Hallera. As part of stage I of the investment (area between ul. The Xavere Dunikowski and the railway line), which is covered by this proposal, are scheduled to carry out the following work: Rebuilding of the 2 existing exits from ul. Dounkowski, — removal of the existing exit from ul. Mr Dounkowski, — cons...)
Property / summary
 
The planned connecting traffic centre will be located in the area of the railway station of PKP in Imilinie Street at ul. Dunikowski and ul. Hallera. As part of stage I of the investment (area between ul. The Xavere Dunikowski and the railway line), which is covered by this proposal, are scheduled to carry out the following work: Rebuilding of the 2 existing exits from ul. Dounkowski, — removal of the existing exit from ul. Mr Dounkowski, — construction and reconstruction of the position at ul. Dounkowski, — the design of the crossing by the road. Dounkowy at the height of the hub, a change in the location of the existing passage through ul. Dunikowski, in connection with the conversion of turnout No 1, the construction of internal roads, the construction of parking positions on the internal roads, the construction of pavements and beaches, the construction of pavements for cycles for cycles, the construction of parking stands for buses and buses, the construction of a commercial pavilion with public toilets, the construction of a bus stop. (English)
Property / summary: The planned connecting traffic centre will be located in the area of the railway station of PKP in Imilinie Street at ul. Dunikowski and ul. Hallera. As part of stage I of the investment (area between ul. The Xavere Dunikowski and the railway line), which is covered by this proposal, are scheduled to carry out the following work: Rebuilding of the 2 existing exits from ul. Dounkowski, — removal of the existing exit from ul. Mr Dounkowski, — construction and reconstruction of the position at ul. Dounkowski, — the design of the crossing by the road. Dounkowy at the height of the hub, a change in the location of the existing passage through ul. Dunikowski, in connection with the conversion of turnout No 1, the construction of internal roads, the construction of parking positions on the internal roads, the construction of pavements and beaches, the construction of pavements for cycles for cycles, the construction of parking stands for buses and buses, the construction of a commercial pavilion with public toilets, the construction of a bus stop. (English) / rank
 
Normal rank

Revision as of 10:13, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the Integrated Neighbours Centre in Imilinie
Project in Poland financed by DG Regio

    Statements

    0 references
    859,463.66 zloty
    0 references
    206,271.2784 Euro
    13 January 2020
    0 references
    2,358,883.43 zloty
    0 references
    566,132.0232 Euro
    13 January 2020
    0 references
    47.68 percent
    0 references
    19 September 2016
    0 references
    28 December 2018
    0 references
    MIASTO IMIELIN
    0 references

    50°8'38.8"N, 19°12'9.4"E
    0 references
    Projektowane centrum przesiadkowe obejmuje lokalizację w rejonie dworca PKP w Imielinie przy ul. Dunikowskiego oraz ul. Hallera. W ramach etapu I inwestycji (obszar między ul. Xawerego Dunikowskiego a linia kolejową ), objętego niniejszym wnioskiem zaplanowano realizację następujących prac: - przebudowa 2 istniejących zjazdów z ul. Dunikowskiego, - likwidacja istniejącego zjazdu z ul. Dunikowskiego, - budowa i przebudowa stanowisk postojowych przy ul. Dunikowskiego, - zaprojektowanie przejścia przez jezdnię ul. Dunikowskiego na wysokości centrum przesiadkowego, - zmiana lokalizacji istniejącego przejścia przez ul. Dunikowskiego w związku z przebudową zjazdu nr 1, - budowa dróg wewnętrznych, - budowa stanowisk postojowych przy drogach wewnętrznych, - budowa chodników i placyków, - budowa stanowisk postojowych dla jednośladów, - budowa stanowisk postoju busów i autobusów, - budowa pawilonu handlowego z toaletami publicznymi, - budowa wiaty przystankowej. (Polish)
    0 references
    The planned connecting traffic centre will be located in the area of the railway station of PKP in Imilinie Street at ul. Dunikowski and ul. Hallera. As part of stage I of the investment (area between ul. The Xavere Dunikowski and the railway line), which is covered by this proposal, are scheduled to carry out the following work: Rebuilding of the 2 existing exits from ul. Dounkowski, — removal of the existing exit from ul. Mr Dounkowski, — construction and reconstruction of the position at ul. Dounkowski, — the design of the crossing by the road. Dounkowy at the height of the hub, a change in the location of the existing passage through ul. Dunikowski, in connection with the conversion of turnout No 1, the construction of internal roads, the construction of parking positions on the internal roads, the construction of pavements and beaches, the construction of pavements for cycles for cycles, the construction of parking stands for buses and buses, the construction of a commercial pavilion with public toilets, the construction of a bus stop. (English)
    0 references

    Identifiers

    RPSL.04.05.01-24-00D3/17
    0 references