(Created claim: summary (P836): The project involves the removal and destruction of the linings of asbestos-cement plates and the improvement of the thermal insulation of the residential building at ul. Freedom 140-142 in Chorzów. The following construction and assembly works are included within the scope of this application for funding, directly linked to the removal and disposal of articles containing asbestos: — dismantling of asbestos — cement (Acecol), necessary pre-insul...) |
||
Property / summary | |||
The project involves the removal and destruction of the linings of asbestos-cement plates and the improvement of the thermal insulation of the residential building at ul. Freedom 140-142 in Chorzów. The following construction and assembly works are included within the scope of this application for funding, directly linked to the removal and disposal of articles containing asbestos: — dismantling of asbestos — cement (Acecol), necessary pre-insulation works, — filling the loss (reprofilation) of the invoice layer of the external wall, — insulation works for walls and frames associated with the restoration, using non-harmful materials, of the plant pre-dismantling of the asbestos-cement plates. The scope of work is in line with the design documentation developed. As a result of the project, 12,167 tonnes of articles containing asbestos will be disposed of and disposed of. (English) | |||
Property / summary: The project involves the removal and destruction of the linings of asbestos-cement plates and the improvement of the thermal insulation of the residential building at ul. Freedom 140-142 in Chorzów. The following construction and assembly works are included within the scope of this application for funding, directly linked to the removal and disposal of articles containing asbestos: — dismantling of asbestos — cement (Acecol), necessary pre-insulation works, — filling the loss (reprofilation) of the invoice layer of the external wall, — insulation works for walls and frames associated with the restoration, using non-harmful materials, of the plant pre-dismantling of the asbestos-cement plates. The scope of work is in line with the design documentation developed. As a result of the project, 12,167 tonnes of articles containing asbestos will be disposed of and disposed of. (English) / rank | |||
Normal rank |
Revision as of 10:25, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Removal and disposal of the linings of asbestos-cement plates and the improvement of the thermal insulation of the residential building at ul. Freedoms 140-142 in Chorzów |
Project in Poland financed by DG Regio |
Statements
614,005.36 zloty
0 references
722,359.25 zloty
0 references
85.0 percent
0 references
10 December 2018
0 references
16 November 2020
0 references
WSPÓLNOTA MIESZKANIOWA CHORZÓW UL. WOLNOŚCI 140 - 142
0 references
Projekt obejmuje usunięcie oraz utylizację okładzin z płyt azbestowo-cementowych oraz poprawienie izolacyjności termicznej budynku mieszkalnego przy ul. Wolności 140-142 w Chorzowie. W zakres niniejszego wniosku o dofinansowanie wchodzą następujące roboty budowlano-montażowe, bezpośrednio związane z usuwaniem i unieszkodliwianiem wyrobów zawierających azbest: - demontaż płyt azbestowo – cementowych (Acekol), - niezbędne roboty przygotowawcze przed dociepleniem, - wypełnienie ubytków ( reprofilacja) warstwy fakturowej ściany zewnętrznej, - prace dociepleniowe ścian i ościerzy związane z przywróceniem, przy użyciu materiałów nieszkodliwych, stanu obiektu sprzed demontażu okładzin z płyt azbestowo-cementowych. Zakres prac jest zgodny z opracowaną dokumentacją projektową. W wyniku realizacji projektu zostanie usunięte i unieszkodliwione 12,167 ton wyrobów zawierających azbest. (Polish)
0 references
The project involves the removal and destruction of the linings of asbestos-cement plates and the improvement of the thermal insulation of the residential building at ul. Freedom 140-142 in Chorzów. The following construction and assembly works are included within the scope of this application for funding, directly linked to the removal and disposal of articles containing asbestos: — dismantling of asbestos — cement (Acecol), necessary pre-insulation works, — filling the loss (reprofilation) of the invoice layer of the external wall, — insulation works for walls and frames associated with the restoration, using non-harmful materials, of the plant pre-dismantling of the asbestos-cement plates. The scope of work is in line with the design documentation developed. As a result of the project, 12,167 tonnes of articles containing asbestos will be disposed of and disposed of. (English)
0 references
Identifiers
RPSL.05.02.01-24-0030/19