Construction of a pressure sewage system in Gostynia (Pszczyńska Street, Moderate, Rybnicka, Rybnicki, Forestry and acacia) with the reconstruction of the water mains on a graduated street (Q124207): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The object of the project is the construction of a pressure sewage system in the area of Gostyń with a total length of 7 588 m and the reconstruction of the water supply network in a 1 585.2 m graduated street. as a result of the project, a total of 464 inhabitants will be connected to the sewage network, while 100 inhabitants will benefit from the reconstructed water supply., Adding English summary) |
||
Property / summary | |||
The object of the project is the construction of a pressure sewage system in the area of Gostyń with a total length of 7 588 m and the reconstruction of the water supply network in a 1 585.2 m graduated street. as a result of the project, a total of 464 inhabitants will be connected to the sewage network, while 100 inhabitants will benefit from the reconstructed water supply. (English) | |||
Property / summary: The object of the project is the construction of a pressure sewage system in the area of Gostyń with a total length of 7 588 m and the reconstruction of the water supply network in a 1 585.2 m graduated street. as a result of the project, a total of 464 inhabitants will be connected to the sewage network, while 100 inhabitants will benefit from the reconstructed water supply. (English) / rank | |||
Normal rank |
Revision as of 10:21, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a pressure sewage system in Gostynia (Pszczyńska Street, Moderate, Rybnicka, Rybnicki, Forestry and acacia) with the reconstruction of the water mains on a graduated street |
Project in Poland financed by DG Regio |
Statements
3,005,158.0 zloty
0 references
4,933,405.54 zloty
0 references
81.95 percent
0 references
7 July 2016
0 references
10 August 2018
0 references
GMINA WYRY
0 references
Przedmiotem projektu jest budowa kanalizacji sanitarnej ciśnieniowej na terenie miejscowości Gostyń o łącznej długości 7 588 m oraz przebudowa sieci wodociągowej na ulicy Miarowej o długości 1 585,2 m. W wyniku realizacji projektu do sieci kanalizacyjnej podłączonych zostanie 464 mieszkańców, natomiast z przebudowanego wodociągu będzie korzystało 100 mieszkańców. (Polish)
0 references
The object of the project is the construction of a pressure sewage system in the area of Gostyń with a total length of 7 588 m and the reconstruction of the water supply network in a 1 585.2 m graduated street. as a result of the project, a total of 464 inhabitants will be connected to the sewage network, while 100 inhabitants will benefit from the reconstructed water supply. (English)
0 references
Identifiers
RPSL.05.01.01-24-0765/16
0 references