(‎Created claim: summary (P836): The project consists of carrying out a deep, comprehensive energy modernisation of the building of the Municipality and Municipality (UMiG) in Stepnica, aimed at improving the energy efficiency (reduced energy intensity) of the facility under investment, resulting in a reduction in energy consumption and an ecological effect in the form of a reduction of CO2 emissions into the atmosphere. The project concerns the UMiG building in Stepnica, locat...)
Property / summary
 
The project consists of carrying out a deep, comprehensive energy modernisation of the building of the Municipality and Municipality (UMiG) in Stepnica, aimed at improving the energy efficiency (reduced energy intensity) of the facility under investment, resulting in a reduction in energy consumption and an ecological effect in the form of a reduction of CO2 emissions into the atmosphere. The project concerns the UMiG building in Stepnica, located in Szczecin’s METROPOLITAL OBSAR. Project implemented within the ZIT SOM strategy. Planned tasks/expenditures: I.Preparation of project documentation 1.Preparation of the Feasibility Study 2.Preparation of the Application for co-financing of the project and the necessary annexes 3.Preparation of an ornithological/Chiropterological opinion II.Building works 4. Carrying out a deep, comprehensive energy modernisation of the UMiG building in Stepnica. III.Investor supervision of the project 5. Supervision of project IV.Promotion of the project 6.Promotion of the project Detailed scope of tasks and expenses of Mr. G of the Application. The link between the project and other completed/planned projects, including those financed by the Structural Funds, is shown in point B.11 of the proposal. Output indicators: 1. Number of energy-modified buildings [pcs] 8. The usable area of buildings which have undergone thermal renovation [m²] Detailed data on the output indicators are presented in p. E.1 of the application for funding. The UM building in Stepnica is protected by the monuments conservator, but it is not included in the voivodship register of monuments. The project contains an information element, as described in p. D.4 Promotion of the project. The project is stationary and will be implemented by Stepnica Municipality during the period: 05.08.2016 (start of work related to preparation of application documentation) – 30.09.2019 (financial completion after receipt in kind). (English)
Property / summary: The project consists of carrying out a deep, comprehensive energy modernisation of the building of the Municipality and Municipality (UMiG) in Stepnica, aimed at improving the energy efficiency (reduced energy intensity) of the facility under investment, resulting in a reduction in energy consumption and an ecological effect in the form of a reduction of CO2 emissions into the atmosphere. The project concerns the UMiG building in Stepnica, located in Szczecin’s METROPOLITAL OBSAR. Project implemented within the ZIT SOM strategy. Planned tasks/expenditures: I.Preparation of project documentation 1.Preparation of the Feasibility Study 2.Preparation of the Application for co-financing of the project and the necessary annexes 3.Preparation of an ornithological/Chiropterological opinion II.Building works 4. Carrying out a deep, comprehensive energy modernisation of the UMiG building in Stepnica. III.Investor supervision of the project 5. Supervision of project IV.Promotion of the project 6.Promotion of the project Detailed scope of tasks and expenses of Mr. G of the Application. The link between the project and other completed/planned projects, including those financed by the Structural Funds, is shown in point B.11 of the proposal. Output indicators: 1. Number of energy-modified buildings [pcs] 8. The usable area of buildings which have undergone thermal renovation [m²] Detailed data on the output indicators are presented in p. E.1 of the application for funding. The UM building in Stepnica is protected by the monuments conservator, but it is not included in the voivodship register of monuments. The project contains an information element, as described in p. D.4 Promotion of the project. The project is stationary and will be implemented by Stepnica Municipality during the period: 05.08.2016 (start of work related to preparation of application documentation) – 30.09.2019 (financial completion after receipt in kind). (English) / rank
 
Normal rank
Property / summary: The project consists of carrying out a deep, comprehensive energy modernisation of the building of the Municipality and Municipality (UMiG) in Stepnica, aimed at improving the energy efficiency (reduced energy intensity) of the facility under investment, resulting in a reduction in energy consumption and an ecological effect in the form of a reduction of CO2 emissions into the atmosphere. The project concerns the UMiG building in Stepnica, located in Szczecin’s METROPOLITAL OBSAR. Project implemented within the ZIT SOM strategy. Planned tasks/expenditures: I.Preparation of project documentation 1.Preparation of the Feasibility Study 2.Preparation of the Application for co-financing of the project and the necessary annexes 3.Preparation of an ornithological/Chiropterological opinion II.Building works 4. Carrying out a deep, comprehensive energy modernisation of the UMiG building in Stepnica. III.Investor supervision of the project 5. Supervision of project IV.Promotion of the project 6.Promotion of the project Detailed scope of tasks and expenses of Mr. G of the Application. The link between the project and other completed/planned projects, including those financed by the Structural Funds, is shown in point B.11 of the proposal. Output indicators: 1. Number of energy-modified buildings [pcs] 8. The usable area of buildings which have undergone thermal renovation [m²] Detailed data on the output indicators are presented in p. E.1 of the application for funding. The UM building in Stepnica is protected by the monuments conservator, but it is not included in the voivodship register of monuments. The project contains an information element, as described in p. D.4 Promotion of the project. The project is stationary and will be implemented by Stepnica Municipality during the period: 05.08.2016 (start of work related to preparation of application documentation) – 30.09.2019 (financial completion after receipt in kind). (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:22, 8 July 2021

Project Q2718685 in Poland
Language Label Description Also known as
English
No label defined
Project Q2718685 in Poland

    Statements

    0 references
    157,485.92 zloty
    0 references
    35,009.12 Euro
    0.2223 Euro
    0 references
    185,277.56 zloty
    0 references
    41,187.2 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    5 August 2016
    0 references
    30 June 2020
    0 references
    GMINA STEPNICA
    0 references

    53°39'5.4"N, 14°37'48.0"E
    0 references
    Projekt polega na przeprowadzeniu głębokiej, kompleksowej modernizacji energetycznej budynku Urzędu Miasta i Gminy (UMiG) w Stepnicy, mającej na celu poprawę efektywności energetycznej (zmniejszona energochłonność) obiektu, podlegającego inwestycji, niosąc ze sobą zmniejszenie zużycia energii oraz efekt ekologiczny w postaci zmniejszenia emisji CO2 do atmosfery. Projekt dotyczy budynku UMiG w Stepnicy, położonej na terenie SZCZECIŃSKIEGO OBSZARU METROPOLITALNEGO. Projekt realizowany w ramach strategii ZIT SOM. Zaplanowane zadania/wydatki: I.Przygotowanie dokumentacji projektu 1.Sporządzenie Studium Wykonalności 2.Przygotowanie Wniosku o dofinansowanie projektu oraz niezbędnych załączników 3.Przygotowanie opinii ornitologicznej/ chiropterologicznej II.Prace budowlane 4. Przeprowadzenie głębokiej, kompleksowej modernizacji energetycznej budynku UMiG w Stepnicy. III.Nadzór inwestorski nad projektem 5.Nadzór nad projektem IV.Promocja projektu 6.Promocja projektu Szczegółowy zakres zadań oraz wydatków p.G Wniosku. Powiązanie projektu z innymi zrealizowanymi/planowanymi projektami, w tym finansowanymi z funduszy strukturalnych zostało wykazane w p. B.11 Wniosku. Wskaźniki produktu: 1. Liczba zmodernizowanych energetycznie budynków [szt.] 8. Powierzchnia użytkowa budynków poddanych termomodernizacji [m2] Szczegółowe dane, dotyczące wskaźników produktów zostały zaprezentowane w p. E.1 wniosku o dofinansowanie. Budynek UM w Stepnicy podlega ochronie konserwatora zabytków, jednakże nie jest wpisany do wojewódzkiej ewidencji zabytków. Projekt zawiera element informacyjny, co zostało opisane w p. D.4 Promocja projektu. Projekt ma charakter stacjonarny, będzie zrealizowany przez Gminę Stepnica w okresie: 05.08.2016 (rozpoczęcie prac związanych z przygotowaniem dokumentacji aplikacyjnej) – 30.09.2019 (finansowe zakończenie realizacji po dokonaniu odbioru rzeczowego). (Polish)
    0 references
    The project consists of carrying out a deep, comprehensive energy modernisation of the building of the Municipality and Municipality (UMiG) in Stepnica, aimed at improving the energy efficiency (reduced energy intensity) of the facility under investment, resulting in a reduction in energy consumption and an ecological effect in the form of a reduction of CO2 emissions into the atmosphere. The project concerns the UMiG building in Stepnica, located in Szczecin’s METROPOLITAL OBSAR. Project implemented within the ZIT SOM strategy. Planned tasks/expenditures: I.Preparation of project documentation 1.Preparation of the Feasibility Study 2.Preparation of the Application for co-financing of the project and the necessary annexes 3.Preparation of an ornithological/Chiropterological opinion II.Building works 4. Carrying out a deep, comprehensive energy modernisation of the UMiG building in Stepnica. III.Investor supervision of the project 5. Supervision of project IV.Promotion of the project 6.Promotion of the project Detailed scope of tasks and expenses of Mr. G of the Application. The link between the project and other completed/planned projects, including those financed by the Structural Funds, is shown in point B.11 of the proposal. Output indicators: 1. Number of energy-modified buildings [pcs] 8. The usable area of buildings which have undergone thermal renovation [m²] Detailed data on the output indicators are presented in p. E.1 of the application for funding. The UM building in Stepnica is protected by the monuments conservator, but it is not included in the voivodship register of monuments. The project contains an information element, as described in p. D.4 Promotion of the project. The project is stationary and will be implemented by Stepnica Municipality during the period: 05.08.2016 (start of work related to preparation of application documentation) – 30.09.2019 (financial completion after receipt in kind). (English)
    8 July 2021