Q2709468 (Q2709468): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The project consists of a deep thermomodernisation of the building of the Municipal Office and the building of the Social Welfare Centre in Domaszowice, the scope of which results from the energy audit carried out. Adjacent buildings, one of which is a historic building – entered in the municipal register of monuments, are located in Domaszowice on 24 and 26 Main Streets, on plots 113 and 114, which are owned by the Municipality of Domaszowice....) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of a deep thermomodernisation of the building of the Municipal Office and the building of the Social Welfare Centre in Domaszowice, the scope of which results from the energy audit carried out. Adjacent buildings, one of which is a historic building – entered in the municipal register of monuments, are located in Domaszowice on 24 and 26 Main Streets, on plots 113 and 114, which are owned by the Municipality of Domaszowice. The project envisages the execution of construction and installation works, including: thermal insulation of ceilings and roofs, thermal insulation of external walls, replacement of window and door joinery, replacement of lighting with energy-efficient LED luminaires, modernisation of the CO heating system (common for both buildings) through the decommissioning of the coal boiler room and installation of a heat pump together with the necessary installations and components, installation of photovoltaic panels and cabinets ACPiA with the Energy Management System. All activities related to the thermal modernisation of buildings stem directly from the energy audit carried out and suggested an environmentally, energy-efficient and economically optimal option. The effect of the project will be to improve the energy efficiency of buildings, i.e. to reduce the quantity and costs of energy consumption and to reduce emissions of harmful gases into the atmosphere. The project also foresees activities related to investor supervision and project promotion and information, i.e. posting a poster on buildings and information on the municipality’s website. The project also produced an energy audit and project documentation, i.e. technical documentation of the investment and feasibility study of the investment. The project implemented from Q2 2019 to Q4 2021. The direct products of the project will be: energy-modified buildings (2 units) and the usable area of buildings undergoing thermal modernisation (723.56 m²). (English) | |||||||||||||||
Property / summary: The project consists of a deep thermomodernisation of the building of the Municipal Office and the building of the Social Welfare Centre in Domaszowice, the scope of which results from the energy audit carried out. Adjacent buildings, one of which is a historic building – entered in the municipal register of monuments, are located in Domaszowice on 24 and 26 Main Streets, on plots 113 and 114, which are owned by the Municipality of Domaszowice. The project envisages the execution of construction and installation works, including: thermal insulation of ceilings and roofs, thermal insulation of external walls, replacement of window and door joinery, replacement of lighting with energy-efficient LED luminaires, modernisation of the CO heating system (common for both buildings) through the decommissioning of the coal boiler room and installation of a heat pump together with the necessary installations and components, installation of photovoltaic panels and cabinets ACPiA with the Energy Management System. All activities related to the thermal modernisation of buildings stem directly from the energy audit carried out and suggested an environmentally, energy-efficient and economically optimal option. The effect of the project will be to improve the energy efficiency of buildings, i.e. to reduce the quantity and costs of energy consumption and to reduce emissions of harmful gases into the atmosphere. The project also foresees activities related to investor supervision and project promotion and information, i.e. posting a poster on buildings and information on the municipality’s website. The project also produced an energy audit and project documentation, i.e. technical documentation of the investment and feasibility study of the investment. The project implemented from Q2 2019 to Q4 2021. The direct products of the project will be: energy-modified buildings (2 units) and the usable area of buildings undergoing thermal modernisation (723.56 m²). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of a deep thermomodernisation of the building of the Municipal Office and the building of the Social Welfare Centre in Domaszowice, the scope of which results from the energy audit carried out. Adjacent buildings, one of which is a historic building – entered in the municipal register of monuments, are located in Domaszowice on 24 and 26 Main Streets, on plots 113 and 114, which are owned by the Municipality of Domaszowice. The project envisages the execution of construction and installation works, including: thermal insulation of ceilings and roofs, thermal insulation of external walls, replacement of window and door joinery, replacement of lighting with energy-efficient LED luminaires, modernisation of the CO heating system (common for both buildings) through the decommissioning of the coal boiler room and installation of a heat pump together with the necessary installations and components, installation of photovoltaic panels and cabinets ACPiA with the Energy Management System. All activities related to the thermal modernisation of buildings stem directly from the energy audit carried out and suggested an environmentally, energy-efficient and economically optimal option. The effect of the project will be to improve the energy efficiency of buildings, i.e. to reduce the quantity and costs of energy consumption and to reduce emissions of harmful gases into the atmosphere. The project also foresees activities related to investor supervision and project promotion and information, i.e. posting a poster on buildings and information on the municipality’s website. The project also produced an energy audit and project documentation, i.e. technical documentation of the investment and feasibility study of the investment. The project implemented from Q2 2019 to Q4 2021. The direct products of the project will be: energy-modified buildings (2 units) and the usable area of buildings undergoing thermal modernisation (723.56 m²). (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 21:57, 7 July 2021
Project Q2709468 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2709468 in Poland |
Statements
790,627.74 zloty
0 references
930,259.73 zloty
0 references
84.99 percent
0 references
19 June 2019
0 references
31 December 2021
0 references
GMINA DOMASZOWICE
0 references
Projekt polega na głębokiej termomodernizacji budynku Urzędu Gminy oraz budynku Ośrodka Pomocy Społecznej w Domaszowicach, którego zakres wynika z wykonanego audytu energetycznego. Sąsiadujące ze sobą budynki, z których jeden jest obiektem zabytkowym - wpisanym do gminnej ewidencji zabytków, zlokalizowane są w Domaszowicach na ulicy Głównej 24 i 26, na działkach nr 113 i 114, które są własnością Gminy Domaszowice. W ramach projektu przewiduje się wykonanie robót budowlanych i instalacyjnych obejmujących m.in.: izolację termiczną stropów i dachu, izolację termiczną ścian zewnętrznych, wymianę stolarki okiennej i drzwiowej, wymianę oświetlenia na energooszczędne oprawy LED, modernizację instalacji grzewczej CO (wspólnej dla obydwu budynków) poprzez likwidację kotłowni węglowej i montaż pompy ciepła wraz z niezbędnymi instalacjami i elementami, montaż paneli fotowoltaicznych oraz szafy AKPiA z Systemem Zarządzania Energią. Wszystkie działania związane z termomodernizacją budynków wynikają bezpośrednio z przeprowadzonego audytu energetycznego i sugerowanego optymalnego pod względem ekologicznym, energetycznym i ekonomicznym wariantu. Skutkiem realizacji projektu będzie poprawa efektywności energetycznej budynków tj. zmniejszenie ilości oraz kosztów zużycia energii oraz redukcja emisji szkodliwych gazów do atmosfery. W projekcie przewiduje się także działania związane z nadzorem inwestorskim oraz promocją i informacją projektu tj. zamieszczeniem plakatu na budynkach oraz informacji na stronie www gminy. W ramach projektu sporządzono także audyt energetyczny oraz dokumentację projektową tj. dokumentację techniczną inwestycji i studium wykonalności inwestycji. Projekt realizowany od II kwartału 2019 r. do IV kwartału 2021 r. Bezpośrednimi produktami realizacji projektu będą: zmodernizowane energetycznie budynki (2 szt.) oraz powierzchnia użytkowa budynków poddanych termomodernizacji (723,56 m2). (Polish)
0 references
The project consists of a deep thermomodernisation of the building of the Municipal Office and the building of the Social Welfare Centre in Domaszowice, the scope of which results from the energy audit carried out. Adjacent buildings, one of which is a historic building – entered in the municipal register of monuments, are located in Domaszowice on 24 and 26 Main Streets, on plots 113 and 114, which are owned by the Municipality of Domaszowice. The project envisages the execution of construction and installation works, including: thermal insulation of ceilings and roofs, thermal insulation of external walls, replacement of window and door joinery, replacement of lighting with energy-efficient LED luminaires, modernisation of the CO heating system (common for both buildings) through the decommissioning of the coal boiler room and installation of a heat pump together with the necessary installations and components, installation of photovoltaic panels and cabinets ACPiA with the Energy Management System. All activities related to the thermal modernisation of buildings stem directly from the energy audit carried out and suggested an environmentally, energy-efficient and economically optimal option. The effect of the project will be to improve the energy efficiency of buildings, i.e. to reduce the quantity and costs of energy consumption and to reduce emissions of harmful gases into the atmosphere. The project also foresees activities related to investor supervision and project promotion and information, i.e. posting a poster on buildings and information on the municipality’s website. The project also produced an energy audit and project documentation, i.e. technical documentation of the investment and feasibility study of the investment. The project implemented from Q2 2019 to Q4 2021. The direct products of the project will be: energy-modified buildings (2 units) and the usable area of buildings undergoing thermal modernisation (723.56 m²). (English)
7 July 2021
0 references
Identifiers
RPOP.03.02.01-16-0005/19
0 references