Q2713350 (Q2713350): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project concerns the replacement of street lighting in the municipality of Bieruń. The project will remove soda luminaires in the amount of 138 pieces, in their place LED luminaires will be installed. In addition, the project will replace lighting poles in the amount of 89 pcs. As a result of the work carried out, there will be an increase in the energy efficiency of street lighting, which will reduce the production of CO2 and PM10 in the mu...)
Property / summary
 
The project concerns the replacement of street lighting in the municipality of Bieruń. The project will remove soda luminaires in the amount of 138 pieces, in their place LED luminaires will be installed. In addition, the project will replace lighting poles in the amount of 89 pcs. As a result of the work carried out, there will be an increase in the energy efficiency of street lighting, which will reduce the production of CO2 and PM10 in the municipality of Bieruń. Formally and legally, the project is ready for implementation. (English)
Property / summary: The project concerns the replacement of street lighting in the municipality of Bieruń. The project will remove soda luminaires in the amount of 138 pieces, in their place LED luminaires will be installed. In addition, the project will replace lighting poles in the amount of 89 pcs. As a result of the work carried out, there will be an increase in the energy efficiency of street lighting, which will reduce the production of CO2 and PM10 in the municipality of Bieruń. Formally and legally, the project is ready for implementation. (English) / rank
 
Normal rank
Property / summary: The project concerns the replacement of street lighting in the municipality of Bieruń. The project will remove soda luminaires in the amount of 138 pieces, in their place LED luminaires will be installed. In addition, the project will replace lighting poles in the amount of 89 pcs. As a result of the work carried out, there will be an increase in the energy efficiency of street lighting, which will reduce the production of CO2 and PM10 in the municipality of Bieruń. Formally and legally, the project is ready for implementation. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:35, 7 July 2021

Project Q2713350 in Poland
Language Label Description Also known as
English
No label defined
Project Q2713350 in Poland

    Statements

    0 references
    0 references
    716,077.67 zloty
    0 references
    159,184.07 Euro
    0.2223 Euro
    0 references
    842,444.32 zloty
    0 references
    187,275.37 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    27 December 2019
    0 references
    30 September 2021
    0 references
    MIASTO BIERUŃ
    0 references
    0 references

    50°5'3.5"N, 19°7'31.1"E
    0 references
    Projekt dotyczy wymiany oświetlenia ulicznego na terenie Gminy Bieruń. W ramach projektu zostaną usunięte oprawy sodowe w ilości 138 szt., w ich miejsce zamontowane zostaną oprawy typu LED. Dodatkowo w ramach projektu zostaną wymienione słupy oświetleniowe w ilości 89 szt. Na skutek przeprowadzonych prac nastąpi wzrost efektywności energetycznej oświetlenia ulicznego, co ograniczy produkcję CO2 oraz PM10 w Gminie Bieruń. Pod względem formalno-prawnym projekt jest gotowy do realizacji. (Polish)
    0 references
    The project concerns the replacement of street lighting in the municipality of Bieruń. The project will remove soda luminaires in the amount of 138 pieces, in their place LED luminaires will be installed. In addition, the project will replace lighting poles in the amount of 89 pcs. As a result of the work carried out, there will be an increase in the energy efficiency of street lighting, which will reduce the production of CO2 and PM10 in the municipality of Bieruń. Formally and legally, the project is ready for implementation. (English)
    8 July 2021
    0 references

    Identifiers

    RPSL.04.05.01-24-01GG/20
    0 references