Q2687636 (Q2687636): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): SA 42799(2015/X) The project concerns the development of 2 improved products that have been recommended to be developed on a pre-diagnosis basis. This is about stacker and uncoiling, as a product base for implementation by customers in various industries. In order to be able to implement prototypes and to be ready for deployment, the following works must be carried out: 1) Advisory part: a) Design strategy development service – i.e. synthesis an...)
Property / summary
 
SA 42799(2015/X) The project concerns the development of 2 improved products that have been recommended to be developed on a pre-diagnosis basis. This is about stacker and uncoiling, as a product base for implementation by customers in various industries. In order to be able to implement prototypes and to be ready for deployment, the following works must be carried out: 1) Advisory part: a) Design strategy development service – i.e. synthesis and analysis, which is to consist of, among others: —synthesis of conclusions from the preaudite, -in-depth analysis of the communication processes with the client and the marketing methods used, in order to select the target effective actions to ensure that the design brief is of sufficient quality, – to select the key sectors involved in drawing up the project brief, – to prepare an initial brief based on feedback from the companies involved in the process of drafting the brief, – to carry out multi-criteria variant analyses in order to develop a final brief and design guidelines. b) Services for the development of the prototype of the stacker: — construction concept resulting from the design brief, – mechanical and other designs allowing the prototype to be made, – development of elements and parts of the prototype, – development of a prototype, – preparation of a test bench (partly on its own) – prototype tests and fixes (in-house) c) services for the development of prototype decoiler assembly (rewinder, rewinder): — construction concept resulting from the design brief, – execution of projects allowing the development of a prototype, – development of elements, assemblies and the whole prototype with testing 2) Investment part: Purchase of fixed assets for the construction of stackers and decoilers on the basis of obtained prototype bases, resulting from the conclusions of multi-criteria analyses from preaudite: a) CNC milling machine b) measuring machine c) lathe d) gantry milling machine e) welding tables. (English)
Property / summary: SA 42799(2015/X) The project concerns the development of 2 improved products that have been recommended to be developed on a pre-diagnosis basis. This is about stacker and uncoiling, as a product base for implementation by customers in various industries. In order to be able to implement prototypes and to be ready for deployment, the following works must be carried out: 1) Advisory part: a) Design strategy development service – i.e. synthesis and analysis, which is to consist of, among others: —synthesis of conclusions from the preaudite, -in-depth analysis of the communication processes with the client and the marketing methods used, in order to select the target effective actions to ensure that the design brief is of sufficient quality, – to select the key sectors involved in drawing up the project brief, – to prepare an initial brief based on feedback from the companies involved in the process of drafting the brief, – to carry out multi-criteria variant analyses in order to develop a final brief and design guidelines. b) Services for the development of the prototype of the stacker: — construction concept resulting from the design brief, – mechanical and other designs allowing the prototype to be made, – development of elements and parts of the prototype, – development of a prototype, – preparation of a test bench (partly on its own) – prototype tests and fixes (in-house) c) services for the development of prototype decoiler assembly (rewinder, rewinder): — construction concept resulting from the design brief, – execution of projects allowing the development of a prototype, – development of elements, assemblies and the whole prototype with testing 2) Investment part: Purchase of fixed assets for the construction of stackers and decoilers on the basis of obtained prototype bases, resulting from the conclusions of multi-criteria analyses from preaudite: a) CNC milling machine b) measuring machine c) lathe d) gantry milling machine e) welding tables. (English) / rank
 
Normal rank
Property / summary: SA 42799(2015/X) The project concerns the development of 2 improved products that have been recommended to be developed on a pre-diagnosis basis. This is about stacker and uncoiling, as a product base for implementation by customers in various industries. In order to be able to implement prototypes and to be ready for deployment, the following works must be carried out: 1) Advisory part: a) Design strategy development service – i.e. synthesis and analysis, which is to consist of, among others: —synthesis of conclusions from the preaudite, -in-depth analysis of the communication processes with the client and the marketing methods used, in order to select the target effective actions to ensure that the design brief is of sufficient quality, – to select the key sectors involved in drawing up the project brief, – to prepare an initial brief based on feedback from the companies involved in the process of drafting the brief, – to carry out multi-criteria variant analyses in order to develop a final brief and design guidelines. b) Services for the development of the prototype of the stacker: — construction concept resulting from the design brief, – mechanical and other designs allowing the prototype to be made, – development of elements and parts of the prototype, – development of a prototype, – preparation of a test bench (partly on its own) – prototype tests and fixes (in-house) c) services for the development of prototype decoiler assembly (rewinder, rewinder): — construction concept resulting from the design brief, – execution of projects allowing the development of a prototype, – development of elements, assemblies and the whole prototype with testing 2) Investment part: Purchase of fixed assets for the construction of stackers and decoilers on the basis of obtained prototype bases, resulting from the conclusions of multi-criteria analyses from preaudite: a) CNC milling machine b) measuring machine c) lathe d) gantry milling machine e) welding tables. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:41, 7 July 2021

Project Q2687636 in Poland
Language Label Description Also known as
English
No label defined
Project Q2687636 in Poland

    Statements

    0 references
    842,327.19 zloty
    0 references
    187,249.33 Euro
    0.2223 Euro
    0 references
    1,429,462.2 zloty
    0 references
    317,769.45 Euro
    0.2223 Euro
    0 references
    58.93 percent
    0 references
    6 May 2019
    0 references
    1 May 2021
    0 references
    MPL TECHMA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    54°20'45.2"N, 18°21'54.0"E
    0 references
    SA 42799(2015/X) Projekt dotyczy opracowania 2 ulepszonych produktów, które zostały zarekomendowane jako zasadne do rozwijania na bazie wykonanej przed złożeniem diagnozy (preaudytu). Chodzi o układnicę i odwijak, jako bazy produktowe dla wdrożeń u klientów w różnych branż. Aby móc zrealizować prototypy i osiągnąć gotowość wdrożeniową należy przeprowadzić następujące prace: 1) Część doradcza: a) Usługa opracowania strategii wzorniczej – tj. syntezy i analizy, która ma składać się ma m.in. z: -syntezy wniosków z preaudytu, -dogłębnej analizy procesów komunikacji z klientem oraz stosowanych metod marketingowych, celem dobrania docelowych skutecznych działań zapewniających uzyskanie odpowiedniej jakości briefu projektowego, - wytypowaniu kluczowych branż uczestniczących w wypracowywaniu briefu projektowego, -opracowania briefu wstępnego na bazie feedbacku z ankiet od firm zaangażowanych w proces opracowywania briefu, - przeprowadzenia analiz wariantowych wielokryterialnych celem wypracowania briefu finalnego i wytycznych projektowych. b) Usługi opracowania prototypu układnicy: - koncepcja konstrukcji wynikająca z briefu projektowego, - projekty mechaniczne i inne pozwalające na wykonanie prototypu, - opracowanie elementów i części prototypu, - opracowanie prototypu, - przygotowanie stanowiska testowego (częściowo we własnym zakresie) - testy prototypu i poprawki (we własnym zakresie) c) usługi opracowania prototypu zespołu odwijaka (przewijaka, nawijaka): - koncepcja konstrukcji wynikająca z briefu projektowego, - wykonanie projektów pozwalających na opracowanie prototypu, - opracowanie elementów, zespołów i całego prototypu wraz z testowaniem 2) Część inwestycyjna: Zakup środków trwałych służących wykonywaniu układnic i odwijaków na podstawie uzyskanych baz prototypowych, wynikających z wniosków z analiz wielokryterialnych z preaudytu: a) frezarka CNC b) maszyna pomiarowa c) tokarka d) frezarka bramowa e) stoły spawalnicze. (Polish)
    0 references
    SA 42799(2015/X) The project concerns the development of 2 improved products that have been recommended to be developed on a pre-diagnosis basis. This is about stacker and uncoiling, as a product base for implementation by customers in various industries. In order to be able to implement prototypes and to be ready for deployment, the following works must be carried out: 1) Advisory part: a) Design strategy development service – i.e. synthesis and analysis, which is to consist of, among others: —synthesis of conclusions from the preaudite, -in-depth analysis of the communication processes with the client and the marketing methods used, in order to select the target effective actions to ensure that the design brief is of sufficient quality, – to select the key sectors involved in drawing up the project brief, – to prepare an initial brief based on feedback from the companies involved in the process of drafting the brief, – to carry out multi-criteria variant analyses in order to develop a final brief and design guidelines. b) Services for the development of the prototype of the stacker: — construction concept resulting from the design brief, – mechanical and other designs allowing the prototype to be made, – development of elements and parts of the prototype, – development of a prototype, – preparation of a test bench (partly on its own) – prototype tests and fixes (in-house) c) services for the development of prototype decoiler assembly (rewinder, rewinder): — construction concept resulting from the design brief, – execution of projects allowing the development of a prototype, – development of elements, assemblies and the whole prototype with testing 2) Investment part: Purchase of fixed assets for the construction of stackers and decoilers on the basis of obtained prototype bases, resulting from the conclusions of multi-criteria analyses from preaudite: a) CNC milling machine b) measuring machine c) lathe d) gantry milling machine e) welding tables. (English)
    7 July 2021
    0 references

    Identifiers

    POIR.02.03.05-22-0031/19
    0 references