Q2699313 (Q2699313): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The investment covered by the project is of an infrastructure nature. It consists of changing the use of a residential building into public spaces (Emergency Intervention Point, Consultation Point) along with the extension of the entrance part, the renovation of the northern and western facades of the main building and the warming of the remaining façade of the Municipal Social Assistance Centre located within the boundaries of plot no. 1085/10...)
Property / summary
 
The investment covered by the project is of an infrastructure nature. It consists of changing the use of a residential building into public spaces (Emergency Intervention Point, Consultation Point) along with the extension of the entrance part, the renovation of the northern and western facades of the main building and the warming of the remaining façade of the Municipal Social Assistance Centre located within the boundaries of plot no. 1085/10 at ul. 700th Anniversary of 36th Anniversary in Żnin.In addition, it is envisaged to regulate central heating installations throughout the building, overhaul of the exit to the site and construction of roads and internal squares. The change of the original construction project consisted of a change in the use of the premises and floor of the office, resulting from the need to adapt the facility to the new regulations governing the work and scope of activities of the ILOS facilities. The change consists of the abandonment of the protected apartment and the use of the acquired space for office space. The consequence of the new function is insignificant facade changes concerning two windows and an additional ventilation shaft and construction – involving an additional lintel above the window opening, as well as installation. The construction project covers the construction of an exit from the municipal road, but does not fall within the scope of this study. It will be carried out at a later date along with the modernisation of ul. 700th Anniversary.The project provides for the purchase of equipment and equipment. These include:- desktop computers (work stations) – 5 pcs.,- LAN,- furniture for the psychologist’s office, meeting room, office rooms, kitchenette, toilets. (English)
Property / summary: The investment covered by the project is of an infrastructure nature. It consists of changing the use of a residential building into public spaces (Emergency Intervention Point, Consultation Point) along with the extension of the entrance part, the renovation of the northern and western facades of the main building and the warming of the remaining façade of the Municipal Social Assistance Centre located within the boundaries of plot no. 1085/10 at ul. 700th Anniversary of 36th Anniversary in Żnin.In addition, it is envisaged to regulate central heating installations throughout the building, overhaul of the exit to the site and construction of roads and internal squares. The change of the original construction project consisted of a change in the use of the premises and floor of the office, resulting from the need to adapt the facility to the new regulations governing the work and scope of activities of the ILOS facilities. The change consists of the abandonment of the protected apartment and the use of the acquired space for office space. The consequence of the new function is insignificant facade changes concerning two windows and an additional ventilation shaft and construction – involving an additional lintel above the window opening, as well as installation. The construction project covers the construction of an exit from the municipal road, but does not fall within the scope of this study. It will be carried out at a later date along with the modernisation of ul. 700th Anniversary.The project provides for the purchase of equipment and equipment. These include:- desktop computers (work stations) – 5 pcs.,- LAN,- furniture for the psychologist’s office, meeting room, office rooms, kitchenette, toilets. (English) / rank
 
Normal rank
Property / summary: The investment covered by the project is of an infrastructure nature. It consists of changing the use of a residential building into public spaces (Emergency Intervention Point, Consultation Point) along with the extension of the entrance part, the renovation of the northern and western facades of the main building and the warming of the remaining façade of the Municipal Social Assistance Centre located within the boundaries of plot no. 1085/10 at ul. 700th Anniversary of 36th Anniversary in Żnin.In addition, it is envisaged to regulate central heating installations throughout the building, overhaul of the exit to the site and construction of roads and internal squares. The change of the original construction project consisted of a change in the use of the premises and floor of the office, resulting from the need to adapt the facility to the new regulations governing the work and scope of activities of the ILOS facilities. The change consists of the abandonment of the protected apartment and the use of the acquired space for office space. The consequence of the new function is insignificant facade changes concerning two windows and an additional ventilation shaft and construction – involving an additional lintel above the window opening, as well as installation. The construction project covers the construction of an exit from the municipal road, but does not fall within the scope of this study. It will be carried out at a later date along with the modernisation of ul. 700th Anniversary.The project provides for the purchase of equipment and equipment. These include:- desktop computers (work stations) – 5 pcs.,- LAN,- furniture for the psychologist’s office, meeting room, office rooms, kitchenette, toilets. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:23, 7 July 2021

Project Q2699313 in Poland
Language Label Description Also known as
English
No label defined
Project Q2699313 in Poland

    Statements

    0 references
    1,042,985.91 zloty
    0 references
    231,855.77 Euro
    0.2223 Euro
    0 references
    1,227,042.25 zloty
    0 references
    272,771.49 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 April 2020
    0 references
    30 June 2021
    0 references
    GMINA ŻNIN
    0 references
    0 references

    52°50'54.6"N, 17°43'18.8"E
    0 references
    Inwestycja objęta projektem ma charakter infrastrukturalny. Polega na zmianie sposobu użytkowania budynku mieszkalnego na pomieszczenia użyteczności publicznej (Punkt Interwencji Kryzysowej, Punkt Konsultacyjny) wraz z rozbudową części wejściowej, remontem elewacji północnej i zachodniej budynku głównego i dociepleniem pozostałych elewacji nieruchomości Miejskiego Ośrodka Pomocy Społecznej zlokalizowanej w granicach działki nr ewid. 1085/10 przy ul. 700-lecia 36 w Żninie.W ramach prac przewiduje się dodatkowo regulację instalacji c.o. w całym budynku, remont zjazdu na teren oraz budowę dróg i placów wewnętrznych.Zmiana pierwotnego projektu budowlanego polegała na zmianie przeznaczenia pomieszczeń I piętra oficyny, wynikającą z konieczności dostosowania obiektu do nowych przepisów regulujących pracę i zakres działalności placówek MOPS. Zmiana polega na rezygnacji z mieszkania chronionego i przeznaczeniu pozyskanej powierzchni na pomieszczenia biurowe. Konsekwencją nowej funkcji są nieistotne zmiany elewacyjne dotyczące dwóch okien i dodatkowego trzonu wentylacyjnego oraz konstrukcyjne - wiążące się z dodatkowym nadprożem nad otworem okiennym, a także instalacyjne.Projekt budowlany obejmuje swoim zakresem budowę zjazdu z drogi gminnej, jednak nie wchodzi od w zakres niniejszego opracowania. Będzie on wykonany w terminie późniejszym wraz z planowaną przez gminę Żnin modernizacją ul. 700-lecia.W ramach projektu przewidziano zakup sprzętu i wyposażenia. Należą do nich:- komputery stacjonarne (stacje robocze) – 5 szt.,- sieć LAN,- meble do gabinetu psychologa, pokoju spotkań, pokoi biurowych, aneksu kuchennego, toalet. (Polish)
    0 references
    The investment covered by the project is of an infrastructure nature. It consists of changing the use of a residential building into public spaces (Emergency Intervention Point, Consultation Point) along with the extension of the entrance part, the renovation of the northern and western facades of the main building and the warming of the remaining façade of the Municipal Social Assistance Centre located within the boundaries of plot no. 1085/10 at ul. 700th Anniversary of 36th Anniversary in Żnin.In addition, it is envisaged to regulate central heating installations throughout the building, overhaul of the exit to the site and construction of roads and internal squares. The change of the original construction project consisted of a change in the use of the premises and floor of the office, resulting from the need to adapt the facility to the new regulations governing the work and scope of activities of the ILOS facilities. The change consists of the abandonment of the protected apartment and the use of the acquired space for office space. The consequence of the new function is insignificant facade changes concerning two windows and an additional ventilation shaft and construction – involving an additional lintel above the window opening, as well as installation. The construction project covers the construction of an exit from the municipal road, but does not fall within the scope of this study. It will be carried out at a later date along with the modernisation of ul. 700th Anniversary.The project provides for the purchase of equipment and equipment. These include:- desktop computers (work stations) – 5 pcs.,- LAN,- furniture for the psychologist’s office, meeting room, office rooms, kitchenette, toilets. (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.06.02.00-04-0011/19
    0 references