Q2698564 (Q2698564): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8...)
Property / summary
 
The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English)
Property / summary: The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English) / rank
 
Normal rank
Property / summary: The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:01, 7 July 2021

Project Q2698564 in Poland
Language Label Description Also known as
English
No label defined
Project Q2698564 in Poland

    Statements

    0 references
    12,551,271.39 zloty
    0 references
    2,790,147.63 Euro
    0.2223 Euro
    0 references
    14,766,201.63 zloty
    0 references
    3,282,526.62 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    10 August 2020
    0 references
    31 December 2021
    0 references
    GMINA MIEJSKA LUBIN
    0 references
    0 references

    51°23'58.9"N, 16°11'57.5"E
    0 references
    Przedmiotem projektu jest budowa zintegrowanego systemu odbioru i zagospodarowania wód opadowych poprzez budowę kanalizacji deszczowej wraz z infrastrukturą towarzyszącą, 1 zbiornikiem retencyjnym oraz 2 zbiornikami o charakterze retencyjno – rozsączającym o kubaturze 760m3. Zadnie obejmuje swym zasięgiem nowo projektowane osiedle Polesie w Lubinie. Realizacja przedsięwzięcia umożliwi odbiór, retencjonowanie i zagospodarowanie wód opadowych z obszaru o pow. 8,4ha. Projekt obejmuje wykonanie -sieci kanalizacji deszczowej o długości 7,8km -podziemnego zbiornika retencyjno – rozsączającego o kub. 300m3 -podziemnego zbiornika retencyjnego o kub. 250m3 wyposażonego w zdalny system zarządzania zasobami wodnymi (TIK) wykorzystywanymi na cele komunalne -otwartego chłonno odparowującego zbiornika retencyjno – rozsączającego o kub. 210m3 -infrastruktury towarzyszącej: wpustów ulicznych, studni kanalizacyjnych oraz chłonnych. Zakres projektu stanowi w pełni funkcjonalny system zagospodarowania nadmiaru wód deszczowych ze zlewni o pow. 8,4ha. Realizacja projektu przyczyni się do poprawy bezpieczeństwa mieszkańców Lubina poprzez budowę sprawnego systemu sieci kanalizacji deszczowej wraz infrastrukturą towarzyszącą mających za zadanie odbiór i zagospodarowanie wód opadowych podczas intensywnych opadów deszczu. Wszystkie wydatki w ramach projektu zostały prawidłowo i rzetelnie oszacowane, w wartość zaproponowanych cen ma odzwierciedlenie w efektach jakie przyniesie projekt. W wyniku realizacji projektu zostaną osiągnięte min. następujące wskaźniki - Liczba podmiotów wykorzystujących technologie informacyjno-komunikacyjne (TIK) – 1 szt. - Liczba miast, w których podjęto działania związane z zabezpieczeniem przed niekorzystnymi zjawiskami pogodowymi – 1 szt. - Powierzchnia zlewni z której będą odprowadzane wody opadowe i roztopowe – 8,4ha Gmina Miejska Lubin dysponuje odpowiednimi zasobami kadrowymi oraz zapleczem technicznymi i organizacyjnym niezbędnym do realizac (Polish)
    0 references
    The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English)
    7 July 2021
    0 references

    Identifiers

    RPDS.04.05.01-02-0006/19
    0 references