Q2698564 (Q2698564): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English) | |||||||||||||||
Property / summary: The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 17:01, 7 July 2021
Project Q2698564 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2698564 in Poland |
Statements
12,551,271.39 zloty
0 references
14,766,201.63 zloty
0 references
85.0 percent
0 references
10 August 2020
0 references
31 December 2021
0 references
GMINA MIEJSKA LUBIN
0 references
Przedmiotem projektu jest budowa zintegrowanego systemu odbioru i zagospodarowania wód opadowych poprzez budowę kanalizacji deszczowej wraz z infrastrukturą towarzyszącą, 1 zbiornikiem retencyjnym oraz 2 zbiornikami o charakterze retencyjno – rozsączającym o kubaturze 760m3. Zadnie obejmuje swym zasięgiem nowo projektowane osiedle Polesie w Lubinie. Realizacja przedsięwzięcia umożliwi odbiór, retencjonowanie i zagospodarowanie wód opadowych z obszaru o pow. 8,4ha. Projekt obejmuje wykonanie -sieci kanalizacji deszczowej o długości 7,8km -podziemnego zbiornika retencyjno – rozsączającego o kub. 300m3 -podziemnego zbiornika retencyjnego o kub. 250m3 wyposażonego w zdalny system zarządzania zasobami wodnymi (TIK) wykorzystywanymi na cele komunalne -otwartego chłonno odparowującego zbiornika retencyjno – rozsączającego o kub. 210m3 -infrastruktury towarzyszącej: wpustów ulicznych, studni kanalizacyjnych oraz chłonnych. Zakres projektu stanowi w pełni funkcjonalny system zagospodarowania nadmiaru wód deszczowych ze zlewni o pow. 8,4ha. Realizacja projektu przyczyni się do poprawy bezpieczeństwa mieszkańców Lubina poprzez budowę sprawnego systemu sieci kanalizacji deszczowej wraz infrastrukturą towarzyszącą mających za zadanie odbiór i zagospodarowanie wód opadowych podczas intensywnych opadów deszczu. Wszystkie wydatki w ramach projektu zostały prawidłowo i rzetelnie oszacowane, w wartość zaproponowanych cen ma odzwierciedlenie w efektach jakie przyniesie projekt. W wyniku realizacji projektu zostaną osiągnięte min. następujące wskaźniki - Liczba podmiotów wykorzystujących technologie informacyjno-komunikacyjne (TIK) – 1 szt. - Liczba miast, w których podjęto działania związane z zabezpieczeniem przed niekorzystnymi zjawiskami pogodowymi – 1 szt. - Powierzchnia zlewni z której będą odprowadzane wody opadowe i roztopowe – 8,4ha Gmina Miejska Lubin dysponuje odpowiednimi zasobami kadrowymi oraz zapleczem technicznymi i organizacyjnym niezbędnym do realizac (Polish)
0 references
The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8.4 ha. The project includes the construction of a 7.8 km long rainwater sewer network – an underground retency – drainage tank with a cube. 300 m³ – underground retention tank with cubic capacity. 250 m³ equipped with a remote water resource management system (ICT) used for municipal purposes – an open absorbent evaporating retency-borne tank. 210 m³ – Accompanying infrastructure: street drains, sewer wells and absorbent wells. The scope of the project is a fully functional system for managing excess rainwater from the catchment area. 8.4 ha. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building an efficient system of rainwater sewerage network together with accompanying infrastructure for the collection and management of rainwater during heavy rain. All expenditure under the project has been correctly and reliably estimated, the value of the proposed prices is reflected in the effects of the project. As a result of the implementation of the project, the following indicators will be achieved, among others – Number of entities using information and communication technologies (ICT) – 1 piece. — Number of cities in which measures to protect against adverse weather events have been taken – 1 — Water catchment area from which rainwater and meltwater will be discharged – 8.4 ha Municipality of Lubin has adequate human resources and technical and organizational facilities necessary to implement (English)
7 July 2021
0 references
Identifiers
RPDS.04.05.01-02-0006/19
0 references