Q2696417 (Q2696417): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en)
(‎Created claim: summary (P836): Ensuring effective support for the implementation of the OP KED by the Centre for European Projects as the Intermediate Body for Priority Axis IV, Action 4.3 through: ensure adequate institutional capacity (staff remuneration, job equipment, training, institution costs) and ensure proper project selection, control, monitoring, evaluation, promotion., translated_summary)
Property / summary
 
Ensuring effective support for the implementation of the OP KED by the Centre for European Projects as the Intermediate Body for Priority Axis IV, Action 4.3 through: ensure adequate institutional capacity (staff remuneration, job equipment, training, institution costs) and ensure proper project selection, control, monitoring, evaluation, promotion. (English)
Property / summary: Ensuring effective support for the implementation of the OP KED by the Centre for European Projects as the Intermediate Body for Priority Axis IV, Action 4.3 through: ensure adequate institutional capacity (staff remuneration, job equipment, training, institution costs) and ensure proper project selection, control, monitoring, evaluation, promotion. (English) / rank
 
Normal rank
Property / summary: Ensuring effective support for the implementation of the OP KED by the Centre for European Projects as the Intermediate Body for Priority Axis IV, Action 4.3 through: ensure adequate institutional capacity (staff remuneration, job equipment, training, institution costs) and ensure proper project selection, control, monitoring, evaluation, promotion. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:11, 7 July 2021

Project Q2696417 in Poland
Language Label Description Also known as
English
No label defined
Project Q2696417 in Poland

    Statements

    0 references
    3,463,601.22 zloty
    0 references
    769,958.55 Euro
    0.2223 Euro
    0 references
    4,109,636.0 zloty
    0 references
    913,572.08 Euro
    0.2223 Euro
    0 references
    84.28 percent
    0 references
    1 January 2021
    0 references
    31 December 2022
    0 references
    CENTRUM PROJEKTÓW EUROPEJSKICH
    0 references
    0 references
    0 references
    Zapewnienie efektywnego wsparcia w zakresie wdrażania PO WER przez Centrum Projektów Europejskich jako Instytucję Pośredniczącą dla Osi Priorytetowej IV, Działanie 4.3 poprzez: zapewnienie odpowiedniego potencjału instytucjonalnego (wynagrodzenia pracowników, wyposażenie stanowisk pracy, szkolenia, koszty instytucji) oraz zapewnienie właściwego procesu wyboru projektów, kontroli, monitorowania, ewaluacji, promocji. (Polish)
    0 references
    Ensuring effective support for the implementation of the OP KED by the Centre for European Projects as the Intermediate Body for Priority Axis IV, Action 4.3 through: ensure adequate institutional capacity (staff remuneration, job equipment, training, institution costs) and ensure proper project selection, control, monitoring, evaluation, promotion. (English)
    7 July 2021
    0 references

    Identifiers

    POWR.06.01.00-00-0701/20
    0 references