Q2660404 (Q2660404): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor., translated_summary)
Property / summary
 
The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English)
Property / summary: The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English) / rank
 
Normal rank
Property / summary: The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English) / qualifier
 
point in time: 29 April 2021
Timestamp+2021-04-29T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:58, 29 April 2021

No description defined
Language Label Description Also known as
English
No label defined
No description defined

    Statements

    0 references
    100,000.0 Swedish krona
    0 references
    9,900.0 Euro
    28 April 2021
    0 references
    200,000.0 Swedish krona
    0 references
    19,800.0 Euro
    28 April 2021
    0 references
    0.5 percent
    0 references
    9 February 2017
    0 references
    8 October 2017
    0 references
    Luleå kommun
    0 references

    65°35'44.63"N, 22°9'1.44"E
    0 references
    97334
    0 references
    Förstudien syftar till att förbereda för ett kommande genomförandeprojekt, vars målsättning kommer att vara utveckling av järnvägsanläggningen inne på Gammelstads kombiterminals område (Tuvåkra). Förstudien ska mynna ut i ett projekteringsunderlag för eventuell utbyggnad av två nya stickspår i området. Utvecklingen av kombiterminalen kommer att förstärka behoven av omlastningar för bl.a. Luleå hamn. (Swedish)
    0 references
    The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English)
    29 April 2021
    0 references

    Identifiers

    20201300
    0 references