Q2660404 (Q2660404): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English) | |||||||||||||||
Property / summary: The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English) / qualifier | |||||||||||||||
point in time: 29 April 2021
|
Revision as of 20:58, 29 April 2021
No description defined
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
No description defined |
Statements
100,000.0 Swedish krona
0 references
200,000.0 Swedish krona
0 references
0.5 percent
0 references
9 February 2017
0 references
8 October 2017
0 references
Luleå kommun
0 references
97334
0 references
Förstudien syftar till att förbereda för ett kommande genomförandeprojekt, vars målsättning kommer att vara utveckling av järnvägsanläggningen inne på Gammelstads kombiterminals område (Tuvåkra). Förstudien ska mynna ut i ett projekteringsunderlag för eventuell utbyggnad av två nya stickspår i området. Utvecklingen av kombiterminalen kommer att förstärka behoven av omlastningar för bl.a. Luleå hamn. (Swedish)
0 references
The preliminary study aims to prepare for an upcoming implementation project, the aim of which will be the development of the railway facility inside Gammelstad combi terminal (Tuvåkra). The feasibility study will result in a design basis for possible expansion of two new strands in the area. The development of the combi terminal will strengthen the need for transshipments for e.g. Luleå harbor. (English)
29 April 2021
0 references
Identifiers
20201300
0 references