Improve the quality of the environment in the municipality of Zambrów by managing roof coverings containing asbestos (Q117121): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project consists of the use of waste containing asbestos. The project is designed to: reception by municipal residents, transportation and disposal (by landfill) of dismantled roof coverings containing asbestos. The project does not cover the dismantling of roof coverings. Asbestos covers have already been dismantled. The general objective of the project is to enhance the economic attractiveness of the region by protecting the potential of t...)
Property / summary
 
The project consists of the use of waste containing asbestos. The project is designed to: reception by municipal residents, transportation and disposal (by landfill) of dismantled roof coverings containing asbestos. The project does not cover the dismantling of roof coverings. Asbestos covers have already been dismantled. The general objective of the project is to enhance the economic attractiveness of the region by protecting the potential of the environment, including human health. The direct objective of the project is the handling of asbestos waste: reception of waste from residential property and disposal through landfill. The target audience of the project (final beneficiaries) is primarily the inhabitants of the municipality. The project is not an infrastructure project, does not require a building permit or a building declaration. The contractor must be required to enter the work contractor only 7 days before starting work to secure or remove articles containing asbestos (the competent construction inspection authority, the competent workplace inspector and the competent State Health Inspector). It is also not necessary to certify Nature 2000 and the impact of the project on water quality. The project is ready for implementation. As a result of the project, the following indicators will be met: Product indicator, withdrawn from use and disposed of articles containing asbestos — 297,53 Mg. (English)
Property / summary: The project consists of the use of waste containing asbestos. The project is designed to: reception by municipal residents, transportation and disposal (by landfill) of dismantled roof coverings containing asbestos. The project does not cover the dismantling of roof coverings. Asbestos covers have already been dismantled. The general objective of the project is to enhance the economic attractiveness of the region by protecting the potential of the environment, including human health. The direct objective of the project is the handling of asbestos waste: reception of waste from residential property and disposal through landfill. The target audience of the project (final beneficiaries) is primarily the inhabitants of the municipality. The project is not an infrastructure project, does not require a building permit or a building declaration. The contractor must be required to enter the work contractor only 7 days before starting work to secure or remove articles containing asbestos (the competent construction inspection authority, the competent workplace inspector and the competent State Health Inspector). It is also not necessary to certify Nature 2000 and the impact of the project on water quality. The project is ready for implementation. As a result of the project, the following indicators will be met: Product indicator, withdrawn from use and disposed of articles containing asbestos — 297,53 Mg. (English) / rank
 
Normal rank

Revision as of 08:25, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improve the quality of the environment in the municipality of Zambrów by managing roof coverings containing asbestos
Project in Poland financed by DG Regio

    Statements

    0 references
    68,856.19 zloty
    0 references
    16,525.4856 Euro
    13 January 2020
    0 references
    87,723.75 zloty
    0 references
    21,053.7 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    7 December 2018
    0 references
    6 June 2019
    0 references
    GMINA ZAMBRÓW
    0 references
    Projekt polega na zagospodarowaniu odpadów zawierających azbest. W ramach projektu zaplanowano: odbiór z posesji mieszkańców gminy, transport oraz unieszkodliwienie (poprzez składowanie na wysypisku) zdemontowanych pokryć dachowych zawierających azbest. Projekt nie obejmuje demontażu pokryć dachowych. Pokrycia zawierające azbest zostały już wcześniej zdemontowane. Celem ogólnym projektu jest podniesienie atrakcyjności gospodarczej regionu poprzez ochronę potencjału środowiska, w tym zdrowia ludzkiego. Celem bezpośrednim projektu jest zagospodarowanie odpadów azbestowych: odbiór odpadów z nieruchomości mieszkańców i unieszkodliwienie przez składowanie na wysypisku. Grupą docelową realizacji projektu (beneficjentami ostatecznymi) są przede wszystkim mieszkańcy gminy. Projekt nie ma charakteru infrastrukturalnego, nie wymaga pozwolenia na budowę, ani zgłoszenia budowlanego. Wykonawca prac musi jedynie na 7 dni przed rozpoczęciem dokonać zgłoszenia przystąpienia do prac polegających na zabezpieczaniu lub usunięciu wyrobów zawierających azbest (właściwemu organowi nadzoru budowlanego, właściwemu okręgowemu inspektorowi pracy oraz właściwemu państwowemu inspektorowi sanitarnemu). Nie są także konieczne stosowne zaświadczenia dot. Natury 2000 oraz dot. wpływu projektu na jakość wód. Projekt jest gotowy do realizacji. W wyniku realizacji projektu zostaną osiągnięte następujące wskaźniki: Wskaźnik produktu - masa wycofanych z użytkowania i unieszkodliwionych wyrobów zawierających azbest - 297,53 Mg. (Polish)
    0 references
    The project consists of the use of waste containing asbestos. The project is designed to: reception by municipal residents, transportation and disposal (by landfill) of dismantled roof coverings containing asbestos. The project does not cover the dismantling of roof coverings. Asbestos covers have already been dismantled. The general objective of the project is to enhance the economic attractiveness of the region by protecting the potential of the environment, including human health. The direct objective of the project is the handling of asbestos waste: reception of waste from residential property and disposal through landfill. The target audience of the project (final beneficiaries) is primarily the inhabitants of the municipality. The project is not an infrastructure project, does not require a building permit or a building declaration. The contractor must be required to enter the work contractor only 7 days before starting work to secure or remove articles containing asbestos (the competent construction inspection authority, the competent workplace inspector and the competent State Health Inspector). It is also not necessary to certify Nature 2000 and the impact of the project on water quality. The project is ready for implementation. As a result of the project, the following indicators will be met: Product indicator, withdrawn from use and disposed of articles containing asbestos — 297,53 Mg. (English)
    0 references

    Identifiers

    RPPD.06.01.00-20-0011/18
    0 references