ENERGY RENOVATION OF THE SPORTS HALL BUILDING IN SIENIAWA (Q118684): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The main objective of the project is to improve the energy efficiency of the public building, which is located in the municipality of Sieniawa. The scope of the planned modernisation works in the sports hall consists of the following: 1. Wall insulation 2. Window 3 replacement. Exchange of doors 4. Insulation of costs5. Indoor warming of the floor (6). Refurbishment of a ventilation unit (7). C.o.8. Exchange of lighting, LED9. Installation of a...)
Property / summary
 
The main objective of the project is to improve the energy efficiency of the public building, which is located in the municipality of Sieniawa. The scope of the planned modernisation works in the sports hall consists of the following: 1. Wall insulation 2. Window 3 replacement. Exchange of doors 4. Insulation of costs5. Indoor warming of the floor (6). Refurbishment of a ventilation unit (7). C.o.8. Exchange of lighting, LED9. Installation of a photovoltaic (10) installation. Construction of a driveway and a paving of the plot with a specific plate: • Improvement of the technical condition of the site; • Increase the efficiency of energy management; • Reducing energy demand in the building; • Cost savings; • Reducing low greenhouse gas emissions; • Protection of the environment; The thermal modernisation of the sport hall will lead to a direct reduction in energy efficiency and thus an increase in energy efficiency. The direct result of the implementation of the project will be to: — an amount of saved electricity of 6,13 MWhe/year- an amount of saved heat 4726,32 GJ/year- a reduction in final energy consumption of 4847,058 GJ/year- savings in the cost of energy supply 268942,00 of the project are directly linked to the project’s expectations and needs and are in line with the objective of Action 6.4.3 of ROP PP 2014-2020. (English)
Property / summary: The main objective of the project is to improve the energy efficiency of the public building, which is located in the municipality of Sieniawa. The scope of the planned modernisation works in the sports hall consists of the following: 1. Wall insulation 2. Window 3 replacement. Exchange of doors 4. Insulation of costs5. Indoor warming of the floor (6). Refurbishment of a ventilation unit (7). C.o.8. Exchange of lighting, LED9. Installation of a photovoltaic (10) installation. Construction of a driveway and a paving of the plot with a specific plate: • Improvement of the technical condition of the site; • Increase the efficiency of energy management; • Reducing energy demand in the building; • Cost savings; • Reducing low greenhouse gas emissions; • Protection of the environment; The thermal modernisation of the sport hall will lead to a direct reduction in energy efficiency and thus an increase in energy efficiency. The direct result of the implementation of the project will be to: — an amount of saved electricity of 6,13 MWhe/year- an amount of saved heat 4726,32 GJ/year- a reduction in final energy consumption of 4847,058 GJ/year- savings in the cost of energy supply 268942,00 of the project are directly linked to the project’s expectations and needs and are in line with the objective of Action 6.4.3 of ROP PP 2014-2020. (English) / rank
 
Normal rank

Revision as of 08:54, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
ENERGY RENOVATION OF THE SPORTS HALL BUILDING IN SIENIAWA
Project in Poland financed by DG Regio

    Statements

    0 references
    1,331,176.61 zloty
    0 references
    319,482.3864 Euro
    13 January 2020
    0 references
    2,077,447.6 zloty
    0 references
    498,587.424 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    4 January 2016
    0 references
    31 December 2017
    0 references
    GMINA SIENIAWA
    0 references
    Głównym celem projektu jest poprawa efektywności energetycznej budynku użyteczności publicznej, znajdującego się na terenie gmin Sieniawa. Zakres planowanych robót modernizacyjnych w hali sportowej obejmuje: 1. Docieplenie ścian2. Wymiana okien3. Wymiana drzwi4. Docieplenie stropodachów5. Ocieplenie podłogi na gruncie6. Przebudowa układu wentylacji7. Modernizacja c.o.8. Wymiana oświetlenia LED9. Montaż instalacji fotowoltaicznej10. Budowa podjazdu i utwardzenie działki wraz z płytąCele szczegółowe: •Poprawa stanu technicznego obiektu; • Zwiększenie efektywności zarządzania energią; •Ograniczenie zapotrzebowania na energię w budynku; •Oszczędność kosztów zaopatrzenia w energię; • Ograniczenie niskiej emisji gazów cieplarnianych; • Ochrona środowiska; Przeprowadzona termomodernizacja hali sportowej przełoży się bezpośrednio na zmniejszenie zapotrzebowania na energią, a więc na zwiększenie efektywności energetycznej. Bezpośrednim rezultatem realizacji projektu będzie: - ilość zaoszczędzonej energii elektrycznej 6,13 MWhe/rok- ilość zaoszczędzonej energii cieplnej 4726,32 GJ/rok- zmniejszenie zużycie energii końcowej 4847,058 GJ/rok- oszczędność kosztów zaopatrzenia w energię 268942,00Cele projektu są bezpośrednio związane z oczekiwaniami i potrzebami grupy docelowej projektu oraz są zgodne z celem działania 6.4.3 RPO WP 2014-2020. (Polish)
    0 references
    The main objective of the project is to improve the energy efficiency of the public building, which is located in the municipality of Sieniawa. The scope of the planned modernisation works in the sports hall consists of the following: 1. Wall insulation 2. Window 3 replacement. Exchange of doors 4. Insulation of costs5. Indoor warming of the floor (6). Refurbishment of a ventilation unit (7). C.o.8. Exchange of lighting, LED9. Installation of a photovoltaic (10) installation. Construction of a driveway and a paving of the plot with a specific plate: • Improvement of the technical condition of the site; • Increase the efficiency of energy management; • Reducing energy demand in the building; • Cost savings; • Reducing low greenhouse gas emissions; • Protection of the environment; The thermal modernisation of the sport hall will lead to a direct reduction in energy efficiency and thus an increase in energy efficiency. The direct result of the implementation of the project will be to: — an amount of saved electricity of 6,13 MWhe/year- an amount of saved heat 4726,32 GJ/year- a reduction in final energy consumption of 4847,058 GJ/year- savings in the cost of energy supply 268942,00 of the project are directly linked to the project’s expectations and needs and are in line with the objective of Action 6.4.3 of ROP PP 2014-2020. (English)
    0 references

    Identifiers

    RPPK.03.02.00-18-0051/16
    0 references