(‎Created claim: summary (P836): The aims of the project are to: 1. Increasing electricity production by 201 346 Kwh/year in 2020 from the newly constructed RES installation in Rzeszów by installing a 199,04 kWp photovoltaic power plant in 2019. 2. Reducing CO2 emissions by 166,10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Power of the photovoltaic power plant: 199,04 kWp Amount of electricity...)
Property / summary
 
The aims of the project are to: 1. Increasing electricity production by 201 346 Kwh/year in 2020 from the newly constructed RES installation in Rzeszów by installing a 199,04 kWp photovoltaic power plant in 2019. 2. Reducing CO2 emissions by 166,10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Power of the photovoltaic power plant: 199,04 kWp Amount of electricity produced: 201 346 Kwh/year. Basic parameters for the photovoltaic power plant: 1. Mono-crystalline panels, 622 2. structure supports 200 kpl. 3. Banger. 11 units (± 1 items) 4. cabling DC 3000 mb 5. Switchgear DC ca. 11 units (± 1 items) 6. AC switchboard ca. 11 units (± 1 items) 7. Installation grounded around 11 units (± 1 items) 8. Cabling AC 1 kpl. 9. Measurement system 1 kpl. (English)
Property / summary: The aims of the project are to: 1. Increasing electricity production by 201 346 Kwh/year in 2020 from the newly constructed RES installation in Rzeszów by installing a 199,04 kWp photovoltaic power plant in 2019. 2. Reducing CO2 emissions by 166,10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Power of the photovoltaic power plant: 199,04 kWp Amount of electricity produced: 201 346 Kwh/year. Basic parameters for the photovoltaic power plant: 1. Mono-crystalline panels, 622 2. structure supports 200 kpl. 3. Banger. 11 units (± 1 items) 4. cabling DC 3000 mb 5. Switchgear DC ca. 11 units (± 1 items) 6. AC switchboard ca. 11 units (± 1 items) 7. Installation grounded around 11 units (± 1 items) 8. Cabling AC 1 kpl. 9. Measurement system 1 kpl. (English) / rank
 
Normal rank

Revision as of 08:50, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Photovoltaic installation for ELEKTROMONTAIN
Project in Poland financed by DG Regio

    Statements

    0 references
    807,921.99 zloty
    0 references
    193,901.2776 Euro
    13 January 2020
    0 references
    1,204,662.0 zloty
    0 references
    289,118.88 Euro
    13 January 2020
    0 references
    83.0 percent
    0 references
    10 July 2019
    0 references
    31 March 2020
    0 references
    ELEKTROMONTAŻ RZESZÓW SPÓŁKA AKCYJNA
    0 references
    Celami projektu są: 1. Zwiększenie produkcji energii elektrycznej o 201 346 Kwh/rok w 2020r. z nowo wybudowanej instalacji wykorzystującej OZE w miejscowości Rzeszów poprzez montaż instalacji fotowoltaicznej o mocy 199,04 kWp w 2019r. 2. Zmniejszenie emisji CO2 o 166,10 tony/rok w 2020r. Projekt dotyczy budowy elektrowni fotowoltaicznej na dachu budynku Wnioskodawcy: Moc elektrowni fotowoltaicznej: 199,04 kWp Ilość produkowanej energii elektrycznej: 201 346 Kwh/rok. Podstawowe parametry elektrowni fotowoltaicznej: 1. Panele monokrystaliczne 622 szt. 2. konstrukcja wsporcza 200 kpl. 3. Falownik ok. 11 szt. (+/- 1 szt.) 4. okablowanie DC 3000 mb 5. Rozdzielnica DC ok. 11 szt. (+/- 1 szt.) 6. Rozdzielnica AC ok. 11 szt. (+/- 1 szt.) 7. Instalacja uziemiająca ok. 11 szt. (+/- 1 szt.) 8. Okablowanie AC 1 kpl. 9. Układ pomiarowy 1 kpl. (Polish)
    0 references
    The aims of the project are to: 1. Increasing electricity production by 201 346 Kwh/year in 2020 from the newly constructed RES installation in Rzeszów by installing a 199,04 kWp photovoltaic power plant in 2019. 2. Reducing CO2 emissions by 166,10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Power of the photovoltaic power plant: 199,04 kWp Amount of electricity produced: 201 346 Kwh/year. Basic parameters for the photovoltaic power plant: 1. Mono-crystalline panels, 622 2. structure supports 200 kpl. 3. Banger. 11 units (± 1 items) 4. cabling DC 3000 mb 5. Switchgear DC ca. 11 units (± 1 items) 6. AC switchboard ca. 11 units (± 1 items) 7. Installation grounded around 11 units (± 1 items) 8. Cabling AC 1 kpl. 9. Measurement system 1 kpl. (English)
    0 references

    Identifiers

    RPPK.03.01.00-18-0457/17