Investments in renewable energy sources by Ruta Waldemar Pieczuk (Q116898): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project is related to the installation of micro-PV power plants of 39.75 kW for the use of solar energy for the production of electricity and 2 kW of air-to-water heat pumps with a power of 2.5 kW, as the CWU heat generator to ensure that the heating equipment is operated without the use of heating and a reduction in total heating costs (typ2). The main objective of this project is to diversify income, reduce the costs of operating activitie...)
Property / summary
 
The project is related to the installation of micro-PV power plants of 39.75 kW for the use of solar energy for the production of electricity and 2 kW of air-to-water heat pumps with a power of 2.5 kW, as the CWU heat generator to ensure that the heating equipment is operated without the use of heating and a reduction in total heating costs (typ2). The main objective of this project is to diversify income, reduce the costs of operating activities and the negative environmental impact of Ruta Valdemar Piecallis. The main objective of the project will be achieved through the following specific objectives: 1.Construction of a rooftop photovoltaic power plant in 2019, 39.75 kW in Puńsk, ul. 1th May 12, with an annual production of 37 032 kWh. 2.Generating 37.03 MWh of electricity from renewable energy sources in 2019; 3.Reduction of C02 emissions to the environment in 2019 by 30.89 mg CO2/MWh 4.Reduction of CO2-51.08 % Planned to be purchased (elements of the plant): A 3-phase wave 2 kW with a total power of 39.76 kW. 280-142 polycrystalline photovoltaic panels — extruded aluminium structures, pre-cabling, — DC/AC security, -purchase of 2 air- air- water pumps with a power of 2.5 kW with a reservoir of 300 l 5. The production of 10,56 MWHT from RES in 2020. the project aims to achieve the following: — Number of enterprises receiving support1 in 2019, -Number of generation units of electricity generation from OEA-1 in 2019, -Additional capacity to produce renewable energy (Cl 30) — 39.76 kW in 2019, -Sazinated annual decrease in GHG emissions (Cl 34) C02-30,89 tonnes/year. Electricity generation from new generation capacity of installations using 37.03 MWh/year. — Number of generation units of thermal energy produced from newly built generating capacity 10,56 MWHT/year (English)
Property / summary: The project is related to the installation of micro-PV power plants of 39.75 kW for the use of solar energy for the production of electricity and 2 kW of air-to-water heat pumps with a power of 2.5 kW, as the CWU heat generator to ensure that the heating equipment is operated without the use of heating and a reduction in total heating costs (typ2). The main objective of this project is to diversify income, reduce the costs of operating activities and the negative environmental impact of Ruta Valdemar Piecallis. The main objective of the project will be achieved through the following specific objectives: 1.Construction of a rooftop photovoltaic power plant in 2019, 39.75 kW in Puńsk, ul. 1th May 12, with an annual production of 37 032 kWh. 2.Generating 37.03 MWh of electricity from renewable energy sources in 2019; 3.Reduction of C02 emissions to the environment in 2019 by 30.89 mg CO2/MWh 4.Reduction of CO2-51.08 % Planned to be purchased (elements of the plant): A 3-phase wave 2 kW with a total power of 39.76 kW. 280-142 polycrystalline photovoltaic panels — extruded aluminium structures, pre-cabling, — DC/AC security, -purchase of 2 air- air- water pumps with a power of 2.5 kW with a reservoir of 300 l 5. The production of 10,56 MWHT from RES in 2020. the project aims to achieve the following: — Number of enterprises receiving support1 in 2019, -Number of generation units of electricity generation from OEA-1 in 2019, -Additional capacity to produce renewable energy (Cl 30) — 39.76 kW in 2019, -Sazinated annual decrease in GHG emissions (Cl 34) C02-30,89 tonnes/year. Electricity generation from new generation capacity of installations using 37.03 MWh/year. — Number of generation units of thermal energy produced from newly built generating capacity 10,56 MWHT/year (English) / rank
 
Normal rank

Revision as of 08:33, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Investments in renewable energy sources by Ruta Waldemar Pieczuk
Project in Poland financed by DG Regio

    Statements

    0 references
    158,008.12 zloty
    0 references
    37,921.9488 Euro
    13 January 2020
    0 references
    299,000.0 zloty
    0 references
    71,760.0 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    11 December 2018
    0 references
    13 August 2019
    0 references
    RESTAURACJA „RUTA” WALDEMAR PIECZULIS
    0 references

    54°15'2.9"N, 23°10'43.7"E
    0 references
    Projekt dotyczy montażu mikro elektrowni fotowoltaicznej o mocy 39,75 kW w celu wykorzystania energii słonecznej do produkcji energii elektrycznej oraz instalacji 2 pomp ciepła typu powietrze-woda o mocy 2,5 kW ,jako źródło ciepła cwu, mającej na celu zapewnienie bezobsługowej pracy urządzeń grzewczych i obniżenie kosztów całkowitych ogrzewania(typ2). Celem głównym niniejszego projektu dywersyfikacja przychodów, obniżenie kosztów działalności operacyjnej oraz negatywnego wpływu na środowisko przez przedsiębiorstwo Restauracja „Ruta” Waldemar Pieczulis. Cel główny projektu zostanie osiągnięty poprzez realizację następujących celów szczegółowych: 1.Budowa dachowej elektrowni fotowoltaicznej w 2019 roku o mocy 39,75 kW w miejscowości Puńsk przy ul. 1go Maja 12, o rocznej produkcji 37032 kWh. 2.Wyprodukowanie 37,03 MWh energii elektrycznej z OZE w 2019 roku; 3.Zmniejszenie emisji C02 do środowiska w 2019 roku o 30,89mg CO2/MWh 4.Redukcja CO2-51,08% Planowane do zakupu środki trwałe (elementy elektrowni): -Falownik 3-fazowy 2 szt o łącznej mocy 39,76 kW. -panele fotowoltaiczne polikrystaliczne 280 W- 142 szt. -atestowane konstrukcje aluminiowe, -okablowanie, -zabezpieczenie DC/AC, -zakup 2 pomp ciepła typu powietrze- woda o mocy 2,5 kW wraz ze zbiornikami 300 l 5. Wyprodukowanie 10,56 MWht energii cieplnej z OZE w 2020 Projekt zakłada osiągnięcie poniższych wskaźników: -Liczba przedsiębiorstw otrzymujących wsparcie-1 w 2019, -Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE- 1 szt. w 2019, -Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (Cl 30)- 39,76 kW w 2019, -Szacowany roczny spadek emisji gazów cieplarnianych (Cl 34) C02- 30,89 ton/rok. -Produkcja energii elektrycznej z nowych mocy wytwórczych instalacji wykorzystujących OZE- 37,03 MWh/rok. -Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE-2szt -Produkcja energii cieplnej z nowo wybudowanych mocy wytwórczych 10,56 MWht/rok (Polish)
    0 references
    The project is related to the installation of micro-PV power plants of 39.75 kW for the use of solar energy for the production of electricity and 2 kW of air-to-water heat pumps with a power of 2.5 kW, as the CWU heat generator to ensure that the heating equipment is operated without the use of heating and a reduction in total heating costs (typ2). The main objective of this project is to diversify income, reduce the costs of operating activities and the negative environmental impact of Ruta Valdemar Piecallis. The main objective of the project will be achieved through the following specific objectives: 1.Construction of a rooftop photovoltaic power plant in 2019, 39.75 kW in Puńsk, ul. 1th May 12, with an annual production of 37 032 kWh. 2.Generating 37.03 MWh of electricity from renewable energy sources in 2019; 3.Reduction of C02 emissions to the environment in 2019 by 30.89 mg CO2/MWh 4.Reduction of CO2-51.08 % Planned to be purchased (elements of the plant): A 3-phase wave 2 kW with a total power of 39.76 kW. 280-142 polycrystalline photovoltaic panels — extruded aluminium structures, pre-cabling, — DC/AC security, -purchase of 2 air- air- water pumps with a power of 2.5 kW with a reservoir of 300 l 5. The production of 10,56 MWHT from RES in 2020. the project aims to achieve the following: — Number of enterprises receiving support1 in 2019, -Number of generation units of electricity generation from OEA-1 in 2019, -Additional capacity to produce renewable energy (Cl 30) — 39.76 kW in 2019, -Sazinated annual decrease in GHG emissions (Cl 34) C02-30,89 tonnes/year. Electricity generation from new generation capacity of installations using 37.03 MWh/year. — Number of generation units of thermal energy produced from newly built generating capacity 10,56 MWHT/year (English)
    0 references

    Identifiers

    RPPD.05.01.00-20-0420/17
    0 references