FIBRE BACKBONE (Q1876612): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q2500995 was merged with Q257340)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
FIBRE DORSALE
Property / summary
 
RÉGLAGE DE L’INTERRUPTEUR CENTRE ÉTOILE DE FIBRE ET DE LA MISE À NIVEAU DES ARMOIRES D’INTERRUPTEUR PLANCHER (French)
Property / summary: RÉGLAGE DE L’INTERRUPTEUR CENTRE ÉTOILE DE FIBRE ET DE LA MISE À NIVEAU DES ARMOIRES D’INTERRUPTEUR PLANCHER (French) / rank
 
Normal rank
Property / summary: RÉGLAGE DE L’INTERRUPTEUR CENTRE ÉTOILE DE FIBRE ET DE LA MISE À NIVEAU DES ARMOIRES D’INTERRUPTEUR PLANCHER (French) / qualifier
 
point in time: 10 December 2021
Timestamp+2021-12-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:18, 10 December 2021

Project Q1876612 in Italy
Language Label Description Also known as
English
FIBRE BACKBONE
Project Q1876612 in Italy

    Statements

    0 references
    7,500.0 Euro
    0 references
    7,500.0 Euro
    0 references
    100.0 percent
    0 references
    25 January 2016
    0 references
    9 December 2016
    0 references
    12 December 2016
    0 references
    ISTITUTO TECNICO "BLAISE PASCAL"
    0 references

    41°27'44.42"N, 15°32'35.02"E
    0 references
    ADEGUAMENTO SWITCH IN FIBRA CENTRO STELLA E POTENZIAMENTO SWITCH ARMADI DI PIANO (Italian)
    0 references
    UPGRADE OF THE SWITCHED STAR CENTRE OF THE STAR CENTRE AND UPGRADE THE SAME MASTER PLAN (English)
    0 references
    RÉGLAGE DE L’INTERRUPTEUR CENTRE ÉTOILE DE FIBRE ET DE LA MISE À NIVEAU DES ARMOIRES D’INTERRUPTEUR PLANCHER (French)
    10 December 2021
    0 references

    Identifiers