URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF AN EMERGENCY RESPONSE TO THE SAFETY, REHABILITATION AND REHABILITATION OF THE S. P. 143 MOUNTAIN AREA AND ABATEMARCO, EMERGENCY CIVIL PROTECTION OPERATIONS. (Q2023237): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q2500972 was merged with Q252811)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
TRAVAIL URGENT POUR SÉCURISER, RESTAURER ET CONSOLIDER À LA SUITE DES GLISSEMENTS DE TERRAIN SUR LA SP 143 ENTRE LE MONT ANTILIA ET ABATEMARCO — INTERVENTIONS URGENTES DE PROTECTION CIVILE.
Property / summary
 
L’INTERVENTION EST IDENTIFIÉE AVEC LA FIXATION D’UNE PARTIE DE LA ROUTE DE LA SP 143, INTERVENANT SUR LES STRUCTURES DE SUPPORT DE L’AVION DE L’ALLÉE AU MOUVEMENT DE GLISSEMENT DE TERRAIN AFFECTANT LA ROUTE EN AU MOINS DEUX POINTS TRANCIANDOLA COMPLÈTEMENT. IL EST PRÉVU DE CONSTRUIRE UNE CLOISON DE POTEAUX POUR CONTENIR LE GLISSEMENT DE TERRAIN AVANT EN AVAL ET GABBIONATE PLUS UN MONTE COMPLÉTÉ PAR DES TRAVAUX ADAPTÉS À UN RÉGIME CORRECT D’EAU DE SURFACE. (French)
Property / summary: L’INTERVENTION EST IDENTIFIÉE AVEC LA FIXATION D’UNE PARTIE DE LA ROUTE DE LA SP 143, INTERVENANT SUR LES STRUCTURES DE SUPPORT DE L’AVION DE L’ALLÉE AU MOUVEMENT DE GLISSEMENT DE TERRAIN AFFECTANT LA ROUTE EN AU MOINS DEUX POINTS TRANCIANDOLA COMPLÈTEMENT. IL EST PRÉVU DE CONSTRUIRE UNE CLOISON DE POTEAUX POUR CONTENIR LE GLISSEMENT DE TERRAIN AVANT EN AVAL ET GABBIONATE PLUS UN MONTE COMPLÉTÉ PAR DES TRAVAUX ADAPTÉS À UN RÉGIME CORRECT D’EAU DE SURFACE. (French) / rank
 
Normal rank
Property / summary: L’INTERVENTION EST IDENTIFIÉE AVEC LA FIXATION D’UNE PARTIE DE LA ROUTE DE LA SP 143, INTERVENANT SUR LES STRUCTURES DE SUPPORT DE L’AVION DE L’ALLÉE AU MOUVEMENT DE GLISSEMENT DE TERRAIN AFFECTANT LA ROUTE EN AU MOINS DEUX POINTS TRANCIANDOLA COMPLÈTEMENT. IL EST PRÉVU DE CONSTRUIRE UNE CLOISON DE POTEAUX POUR CONTENIR LE GLISSEMENT DE TERRAIN AVANT EN AVAL ET GABBIONATE PLUS UN MONTE COMPLÉTÉ PAR DES TRAVAUX ADAPTÉS À UN RÉGIME CORRECT D’EAU DE SURFACE. (French) / qualifier
 
point in time: 14 December 2021
Timestamp+2021-12-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:48, 14 December 2021

Project Q2023237 in Italy
Language Label Description Also known as
English
URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF AN EMERGENCY RESPONSE TO THE SAFETY, REHABILITATION AND REHABILITATION OF THE S. P. 143 MOUNTAIN AREA AND ABATEMARCO, EMERGENCY CIVIL PROTECTION OPERATIONS.
Project Q2023237 in Italy

    Statements

    0 references
    337,500.0 Euro
    0 references
    450,000.0 Euro
    0 references
    75.0 percent
    0 references
    3 October 2016
    0 references
    29 October 2018
    0 references
    PROVINCIA DI SALERNO
    0 references
    0 references

    40°9'44.28"N, 15°21'55.66"E
    0 references
    L'INTERVENTO SI IDENTIFICA CON LA MESSA IN SICUREZZA DI PORZIONE DEL TRACCIATO STRADALE DELLA SP 143, INTERVENENDO SULLE STRUTTURE DI SOSTEGNO DEL PIANO CARRABILE IN CORRISPONDENZA DEL MOVIMENTO FRANOSO CHE INTERESSA LA STRADA IN ALMENO DUE PUNTI TRANCIANDOLA COMPLETAMENTE. SI PREVEDE LA REALIZZAZIONE DI UNA PARATIA DI PALI A CONTENIMENTO DEL FRONTE FRANA A VALLE E GABBIONATE PIù A MONTE COMPLETATE DA OPERE ATTE AD UNA CORRETTA REGIMENTAZIONE DELLE ACQUE SUPERFICIALI. (Italian)
    0 references
    THE AIM OF THE INTERVENTION IS TO SECURE PART OF THE ROAD SECTION OF THE SP 143 BY ACTING ON THE SUPPORT STRUCTURES OF THE PLANE RACK IN CONNECTION WITH THE BREAKOUT MOVEMENT, WHICH AFFECTS THE ROAD IN AT LEAST TWO POINTS OF THE ROAD, WHICH COVERS THE ROAD IN AT LEAST TWO PARTS OF THE ROAD. A PARTITION OF STAKES IS TO BE CARRIED OUT IN ORDER TO CURB THE VALLEY AND WILL COMBINE UP TO AN EARLIER STAGE BY WORKS WHICH ARE SUITABLE FOR THE PROPER MANAGEMENT OF SURFACE WATERS. (English)
    0 references
    L’INTERVENTION EST IDENTIFIÉE AVEC LA FIXATION D’UNE PARTIE DE LA ROUTE DE LA SP 143, INTERVENANT SUR LES STRUCTURES DE SUPPORT DE L’AVION DE L’ALLÉE AU MOUVEMENT DE GLISSEMENT DE TERRAIN AFFECTANT LA ROUTE EN AU MOINS DEUX POINTS TRANCIANDOLA COMPLÈTEMENT. IL EST PRÉVU DE CONSTRUIRE UNE CLOISON DE POTEAUX POUR CONTENIR LE GLISSEMENT DE TERRAIN AVANT EN AVAL ET GABBIONATE PLUS UN MONTE COMPLÉTÉ PAR DES TRAVAUX ADAPTÉS À UN RÉGIME CORRECT D’EAU DE SURFACE. (French)
    14 December 2021
    0 references

    Identifiers

    H47H14002270006
    0 references