GENERAL STATION (Q2021710): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q2500930 was merged with Q252898)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
GARE ÉLECTRIQUE GARAGUSO
Property / summary
 
CE PROJET CONCERNE LA CONSTRUCTION D’UNE NOUVELLE CENTRALE DE TRANSFORMATEUR 380150KV À GARAGUSO (MT) À INSÉRER DANS L’ENTRÉE — SORTIES SUR LA LIGNE ÉLECTRIQUE EXISTANTE LARINO — ALIANO, FONCTIONNELLE POUR AUGMENTER L’ÉNERGIE INJECTÉE DANS LE RÉSEAU PAR LES CENTRALES SER ET POUR LAQUELLE LES ENCOMBREMENTS RÉSULTANT DES HAUSSES CONDUISENT À L’IMPOSSIBILITÉ D’ÉVACUER EFFICACEMENT L’ÉNERGIE PRODUITE PAR GD ET LES INSTALLATIONS DIRECTEMENT CONNECTÉES À LA PARTIE RTNNELLA DU RÉSEAU EN QUESTION, LE DISTRIBUTEUR A DEMANDÉ LA CONNEXION D’UNE FUTURE CABINE PRIMAIRE POUR PERMETTRE L’INTRODUCTION DE NOUVELLES ESTIMATIONS À PARTIR DE SOURCES RENOUVELABLES DANS LE RÉSEAU POUR UN TOTAL DE 80 MW. LA DEMANDE DU DISTRIBUTEUR À TERNA POUR UNE SOLUTION DE RACCORDEMENT RTN DÉCOULE DE L’INCAPACITÉ DU DISTRIBUTEUR À ACCUEILLIR DE NOUVELLES SOURCES D’ÉNERGIE SER SUR LE RÉSEAU MTBT. LA RÉALISATION DU NOUVEAU GARAGUSO EST MÊME NÉCESSAIRE POUR PERMETTRE L’INSERTION SUR LE RÉSEAU ÉLECTRIQUE (French)
Property / summary: CE PROJET CONCERNE LA CONSTRUCTION D’UNE NOUVELLE CENTRALE DE TRANSFORMATEUR 380150KV À GARAGUSO (MT) À INSÉRER DANS L’ENTRÉE — SORTIES SUR LA LIGNE ÉLECTRIQUE EXISTANTE LARINO — ALIANO, FONCTIONNELLE POUR AUGMENTER L’ÉNERGIE INJECTÉE DANS LE RÉSEAU PAR LES CENTRALES SER ET POUR LAQUELLE LES ENCOMBREMENTS RÉSULTANT DES HAUSSES CONDUISENT À L’IMPOSSIBILITÉ D’ÉVACUER EFFICACEMENT L’ÉNERGIE PRODUITE PAR GD ET LES INSTALLATIONS DIRECTEMENT CONNECTÉES À LA PARTIE RTNNELLA DU RÉSEAU EN QUESTION, LE DISTRIBUTEUR A DEMANDÉ LA CONNEXION D’UNE FUTURE CABINE PRIMAIRE POUR PERMETTRE L’INTRODUCTION DE NOUVELLES ESTIMATIONS À PARTIR DE SOURCES RENOUVELABLES DANS LE RÉSEAU POUR UN TOTAL DE 80 MW. LA DEMANDE DU DISTRIBUTEUR À TERNA POUR UNE SOLUTION DE RACCORDEMENT RTN DÉCOULE DE L’INCAPACITÉ DU DISTRIBUTEUR À ACCUEILLIR DE NOUVELLES SOURCES D’ÉNERGIE SER SUR LE RÉSEAU MTBT. LA RÉALISATION DU NOUVEAU GARAGUSO EST MÊME NÉCESSAIRE POUR PERMETTRE L’INSERTION SUR LE RÉSEAU ÉLECTRIQUE (French) / rank
 
Normal rank
Property / summary: CE PROJET CONCERNE LA CONSTRUCTION D’UNE NOUVELLE CENTRALE DE TRANSFORMATEUR 380150KV À GARAGUSO (MT) À INSÉRER DANS L’ENTRÉE — SORTIES SUR LA LIGNE ÉLECTRIQUE EXISTANTE LARINO — ALIANO, FONCTIONNELLE POUR AUGMENTER L’ÉNERGIE INJECTÉE DANS LE RÉSEAU PAR LES CENTRALES SER ET POUR LAQUELLE LES ENCOMBREMENTS RÉSULTANT DES HAUSSES CONDUISENT À L’IMPOSSIBILITÉ D’ÉVACUER EFFICACEMENT L’ÉNERGIE PRODUITE PAR GD ET LES INSTALLATIONS DIRECTEMENT CONNECTÉES À LA PARTIE RTNNELLA DU RÉSEAU EN QUESTION, LE DISTRIBUTEUR A DEMANDÉ LA CONNEXION D’UNE FUTURE CABINE PRIMAIRE POUR PERMETTRE L’INTRODUCTION DE NOUVELLES ESTIMATIONS À PARTIR DE SOURCES RENOUVELABLES DANS LE RÉSEAU POUR UN TOTAL DE 80 MW. LA DEMANDE DU DISTRIBUTEUR À TERNA POUR UNE SOLUTION DE RACCORDEMENT RTN DÉCOULE DE L’INCAPACITÉ DU DISTRIBUTEUR À ACCUEILLIR DE NOUVELLES SOURCES D’ÉNERGIE SER SUR LE RÉSEAU MTBT. LA RÉALISATION DU NOUVEAU GARAGUSO EST MÊME NÉCESSAIRE POUR PERMETTRE L’INSERTION SUR LE RÉSEAU ÉLECTRIQUE (French) / qualifier
 
point in time: 14 December 2021
Timestamp+2021-12-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:14, 14 December 2021

Project Q2021710 in Italy
Language Label Description Also known as
English
GENERAL STATION
Project Q2021710 in Italy

    Statements

    0 references
    16,505,599.28 Euro
    0 references
    22,342,317.13 Euro
    0 references
    73.88 percent
    0 references
    27 September 2017
    0 references
    24 May 2021
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    40°32'54.31"N, 16°13'37.85"E
    0 references
    IL PRESENTE PROGETTO RIGUARDERà LA REALIZZAZIONE DI UNA NUOVA STAZIONE ELETTRICA DI TRASFORMAZIONE 380150KV DI GARAGUSO (MT) DA INSERIRE IN ENTRA - ESCE SULL'ESISTENTE ELETTRODOTTO LARINO - ALIANO, FUNZIONALE ALL'INCREMENTO DELL'ENERGIA IMMESSA IN RETE DA IMPIANTI FER E PER LE QUALI LE CONGESTIONI DERIVANTI DALLE RISALITE COMPORTANO L'IMPOSSIBILITà DI EVACUARE EFFICACEMENTE L'ENERGIA PRODOTTA SIA DALLA GD CHE DA IMPIANTI DIRETTAMENTE CONNESSI ALLA RTNNELLA PORZIONE DI RETE IN OGGETTO, Ê STATA RICHIESTA DAL DISTRIBUTORE LA CONNESSIONE DI UNA FUTURA CABINA PRIMARIA PER CONSENTIRE L'IMMISSIONE SULLA RETE DI AT DI NUOVO PREVENTIVI DA FONTE RINNOVABILE PER UN TOTALE DI 80 MW IN IMMISSIONE. LA RICHIESTA DA PARTE DEL DISTRIBUTORE A TERNA DI UNA SOLUZIONE DI CONNESSIONE ALLA RTN DERIVA DALL'IMPOSSIBILITà DEL DISTRIBUTORE DI ACCOGLIERE NUOVA POTENZA DA RES SULLA RETE MTBT. LA REALIZZAZIONE DELLA NUOVA SE DI GARAGUSO SI RENDE INOLTRE NECESSARIA PER CONSENTIRE L'IMMISSIONE SULLA RETE ELETTRI (Italian)
    0 references
    THE PRESENT PROJECT WILL COVER THE CONSTRUCTION OF A NEW 380150KV POWER STATION IN GARAGUSO (MT) TO BE INCLUDED IN THE ENTRY — EXITING THE EXISTING ELECTRICITY STATION LARINO — ALIANO, FUNCTIONAL TO THE INCREASE IN ENERGY FED INTO THE GRID BY RES INSTALLATIONS, AND FOR WHICH THE CONGESTION FROM THOSE PLANTS INVOLVES THE IMPOSSIBLE TO EVACUATE THE ENERGY FROM BOTH THE GD AND THE INSTALLATIONS DIRECTLY LINKED TO THE NETWORK IN QUESTION, EVEN IF THE DISTRIBUTOR HAS REQUESTED THE CONNECTION OF A FUTURE PRIMARY CABIN TO ALLOW NEW QUOTES FROM RENEWABLE SOURCES TO BE PLACED ON THE NETWORK FOR A TOTAL OF 80 MW IN STORAGE. THE REQUEST BY THE DISTRIBUTOR TO TERNA OF A SOLUTION TO RTN IS THE RESULT OF THE DISTRIBUTOR’S NEW POWER FROM RES ON THE MTBT NETWORK. IN ADDITION, THE INTRODUCTION OF THE NEW SYSTEM IS NECESSARY TO ALLOW THE INTRODUCTION OF THE ELECTRIC NETWORK. (English)
    0 references
    CE PROJET CONCERNE LA CONSTRUCTION D’UNE NOUVELLE CENTRALE DE TRANSFORMATEUR 380150KV À GARAGUSO (MT) À INSÉRER DANS L’ENTRÉE — SORTIES SUR LA LIGNE ÉLECTRIQUE EXISTANTE LARINO — ALIANO, FONCTIONNELLE POUR AUGMENTER L’ÉNERGIE INJECTÉE DANS LE RÉSEAU PAR LES CENTRALES SER ET POUR LAQUELLE LES ENCOMBREMENTS RÉSULTANT DES HAUSSES CONDUISENT À L’IMPOSSIBILITÉ D’ÉVACUER EFFICACEMENT L’ÉNERGIE PRODUITE PAR GD ET LES INSTALLATIONS DIRECTEMENT CONNECTÉES À LA PARTIE RTNNELLA DU RÉSEAU EN QUESTION, LE DISTRIBUTEUR A DEMANDÉ LA CONNEXION D’UNE FUTURE CABINE PRIMAIRE POUR PERMETTRE L’INTRODUCTION DE NOUVELLES ESTIMATIONS À PARTIR DE SOURCES RENOUVELABLES DANS LE RÉSEAU POUR UN TOTAL DE 80 MW. LA DEMANDE DU DISTRIBUTEUR À TERNA POUR UNE SOLUTION DE RACCORDEMENT RTN DÉCOULE DE L’INCAPACITÉ DU DISTRIBUTEUR À ACCUEILLIR DE NOUVELLES SOURCES D’ÉNERGIE SER SUR LE RÉSEAU MTBT. LA RÉALISATION DU NOUVEAU GARAGUSO EST MÊME NÉCESSAIRE POUR PERMETTRE L’INSERTION SUR LE RÉSEAU ÉLECTRIQUE (French)
    14 December 2021
    0 references

    Identifiers

    G53G17001650007
    0 references