CONSTRUCTION OF A PARAMASSI TUNNEL — LOT SP 31 OF RIPA (Q2040752): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q2500776 was merged with Q253361)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
CONSTRUCTION D’UN TUNNEL PARAMAX — LE LOT SP 31 DE RIPA
Property / summary
 
RÉALISATION DU PREMIER LOT DE LA ROUTE S.P.31 RIPA DANS LE TRONÇON FERMÉ À LA CIRCULATION À PARTIR DU 17 AOÛT 2015 (SP) ET MAINTENANT ROUVERT EN ALTERNANCE ALLER SIMPLE (French)
Property / summary: RÉALISATION DU PREMIER LOT DE LA ROUTE S.P.31 RIPA DANS LE TRONÇON FERMÉ À LA CIRCULATION À PARTIR DU 17 AOÛT 2015 (SP) ET MAINTENANT ROUVERT EN ALTERNANCE ALLER SIMPLE (French) / rank
 
Normal rank
Property / summary: RÉALISATION DU PREMIER LOT DE LA ROUTE S.P.31 RIPA DANS LE TRONÇON FERMÉ À LA CIRCULATION À PARTIR DU 17 AOÛT 2015 (SP) ET MAINTENANT ROUVERT EN ALTERNANCE ALLER SIMPLE (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:23, 16 December 2021

Project Q2040752 in Italy
Language Label Description Also known as
English
CONSTRUCTION OF A PARAMASSI TUNNEL — LOT SP 31 OF RIPA
Project Q2040752 in Italy

    Statements

    0 references
    1,347,934.74 Euro
    0 references
    3,207,000.0 Euro
    0 references
    42.03 percent
    0 references
    7 March 2016
    0 references
    31 December 2019
    0 references
    REGIONE LIGURIA
    0 references
    0 references
    0 references

    44°8'30.08"N, 9°53'19.28"E
    0 references
    REALIZZAZIONE DEL PRIMO LOTTO DELLA S.P.31 STRADA DELLA RIPA NEL TRATTO CHIUSO AL TRAFFICO DAL 17 AGOSTO 2015 (SP) E OGGI RIAPERTO A SENSO UNICO ALTERNATO (Italian)
    0 references
    IMPLEMENTATION OF THE FIRST BATCH OF THE RIPA ROAD IN THE CLOSED SECTION OF THE TRAFFIC FROM 17 AUGUST 2015 (SP) AND NOW REOPENED ON A SOLE ALTERNATE BASIS (English)
    0 references
    RÉALISATION DU PREMIER LOT DE LA ROUTE S.P.31 RIPA DANS LE TRONÇON FERMÉ À LA CIRCULATION À PARTIR DU 17 AOÛT 2015 (SP) ET MAINTENANT ROUVERT EN ALTERNANCE ALLER SIMPLE (French)
    16 December 2021
    0 references

    Identifiers

    G27H17001030003
    0 references