Modernisation of the site on a flood advantage in Sokółka in the area of sport and leisure management together with implementation of pedestrian and cycling thrust and associated infrastructure (Q117457): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project is part or part of comprehensive physical, economic and social regeneration of marginalised urban areas. The scope of the investment is based on records, approved by the Executive Board of Podlaskie Province. The aim of the project is to combat the degradation of urbanised areas, to crisis, to stimulate development and quality changes, carried out jointly by the local government, the local community and other participants. The projec...) |
||
Property / summary | |||
The project is part or part of comprehensive physical, economic and social regeneration of marginalised urban areas. The scope of the investment is based on records, approved by the Executive Board of Podlaskie Province. The aim of the project is to combat the degradation of urbanised areas, to crisis, to stimulate development and quality changes, carried out jointly by the local government, the local community and other participants. The project will benefit from the project’s effects annually about 2000 inhabitants of the municipality of Sokółka (in 2020). The range of investments (the location of Osiedle Zielone) shall consist of the execution of: — walk and cycling with pedestrian and bicycle resting places to launch water equipment — bridge and floating footbridge — Field stairs in the place of the existing stairs — construction of a playground with an outdoor chamber and accompanying communication infrastructure: pavement, bicycle backers, walking path and small architecture: leisure facilities, benches, garbage bins, cycle racks, fencing, information boards and central green spaces: lawn, planting, wooden window pad. Project implementation period is III quarter 2018 Q2019. the project’s eligible costs are more than PLN 4,4 million, 70 % of which is ERDF subsidy and 10 % from the state budget. This project is a complement to ESF interventions. (English) | |||
Property / summary: The project is part or part of comprehensive physical, economic and social regeneration of marginalised urban areas. The scope of the investment is based on records, approved by the Executive Board of Podlaskie Province. The aim of the project is to combat the degradation of urbanised areas, to crisis, to stimulate development and quality changes, carried out jointly by the local government, the local community and other participants. The project will benefit from the project’s effects annually about 2000 inhabitants of the municipality of Sokółka (in 2020). The range of investments (the location of Osiedle Zielone) shall consist of the execution of: — walk and cycling with pedestrian and bicycle resting places to launch water equipment — bridge and floating footbridge — Field stairs in the place of the existing stairs — construction of a playground with an outdoor chamber and accompanying communication infrastructure: pavement, bicycle backers, walking path and small architecture: leisure facilities, benches, garbage bins, cycle racks, fencing, information boards and central green spaces: lawn, planting, wooden window pad. Project implementation period is III quarter 2018 Q2019. the project’s eligible costs are more than PLN 4,4 million, 70 % of which is ERDF subsidy and 10 % from the state budget. This project is a complement to ESF interventions. (English) / rank | |||
Normal rank |
Revision as of 08:29, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the site on a flood advantage in Sokółka in the area of sport and leisure management together with implementation of pedestrian and cycling thrust and associated infrastructure |
Project in Poland financed by DG Regio |
Statements
3,083,112.29 zloty
0 references
4,404,446.14 zloty
0 references
1,057,067.0735999998 Euro
0.24 Euro
13 January 2020
0 references
70.0 percent
0 references
2 July 2018
0 references
30 September 2019
0 references
GMINA SOKÓŁKA
0 references
Przedmiotowy projekt jest elementem lub częścią kompleksowej rewitalizacji fizycznej, gospodarczej i społecznej obszarów zmarginalizowanych na obszarach miejskich. Zakres inwestycji wynika z zapisów, zatwierdzonego przez Zarząd Województwa Podlaskiego Lokalnego Programu Rewitalizacji Gminy Sokółka. Celem głównym projektu jest przeciwdziałanie degradacji przestrzeni zurbanizowanej, zjawiskom kryzysowym, pobudzanie rozwoju i zmian jakościowych, prowadzonych wspólnie przez władzę samorządową, społeczność lokalną i innych uczestników. Z efektów projektu korzystać będzie rocznie około 2000 mieszkańców gminy Sokółka(w roku 2020). Zakres inwestycji (lokalizacja Osiedle Zielone) obejmuje wykonanie: – ciągu pieszo – rowerowego wraz z miejscami odpoczynku dla pieszych i rowerów – slipu do wodowania sprzętu wodnego – pomostu i kładki pływającej – schodów terenowych w miejscu istniejących schodów –wykonanie placu zabaw wraz z siłownią plenerową oraz towarzyszącą infrastrukturą komunikacyjną: chodnik, zatoczki postojowe na rowery, ścieżka piesza oraz małej architektury: urządzenia rekreacyjne, ławki, kosze na śmieci, stojaki rowerowe, ogrodzenie, tablice informacyjne jak i terenem zieleni urządzonej: trawnik, nasadzenia, palisada drewniana – ambony widokowej. Okres realizacji projektu to III kwartał 2018 -III kwartał 2019 r. Wartość kwalifikowalna projektu to ponad 4,4 mln zł, z czego 70 % stanowi dotacja z EFRR, a 10% dotacja z budżetu państwa. Niniejszy projekt jest uzupełnieniem interwencji EFS. (Polish)
0 references
The project is part or part of comprehensive physical, economic and social regeneration of marginalised urban areas. The scope of the investment is based on records, approved by the Executive Board of Podlaskie Province. The aim of the project is to combat the degradation of urbanised areas, to crisis, to stimulate development and quality changes, carried out jointly by the local government, the local community and other participants. The project will benefit from the project’s effects annually about 2000 inhabitants of the municipality of Sokółka (in 2020). The range of investments (the location of Osiedle Zielone) shall consist of the execution of: — walk and cycling with pedestrian and bicycle resting places to launch water equipment — bridge and floating footbridge — Field stairs in the place of the existing stairs — construction of a playground with an outdoor chamber and accompanying communication infrastructure: pavement, bicycle backers, walking path and small architecture: leisure facilities, benches, garbage bins, cycle racks, fencing, information boards and central green spaces: lawn, planting, wooden window pad. Project implementation period is III quarter 2018 Q2019. the project’s eligible costs are more than PLN 4,4 million, 70 % of which is ERDF subsidy and 10 % from the state budget. This project is a complement to ESF interventions. (English)
0 references
Identifiers
RPPD.08.05.00-20-0004/18
0 references