Road III/49016: Zlin, bridge no. 49016-2 (Q74880): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q214248 was merged with Q4871)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Route III/49016: Zlín, pont no 49016-2

Revision as of 01:30, 29 November 2021

Project Q74880 in Czech Republic
Language Label Description Also known as
English
Road III/49016: Zlin, bridge no. 49016-2
Project Q74880 in Czech Republic

    Statements

    0 references
    70,941,124.95 Czech koruna
    0 references
    2,837,645.00 Euro
    10 January 2020
    0 references
    83,507,987.0 Czech koruna
    0 references
    3,340,319.48 Euro
    10 January 2020
    0 references
    84.95 percent
    0 references
    29 June 2016
    0 references
    13 April 2018
    0 references
    30 April 2018
    0 references
    Ředitelství silnic Zlínského kraje,příspěvková organizace
    0 references
    0 references

    49°13'25.3"N, 17°40'29.3"E
    0 references
    76001
    0 references
    Předmětem projektu je rekonstrukce mostu ev. č. 49016-2 (nadjezdu u autobusového nádraží) včetně komunikace na něm a silnice III/49016 v uzlovém úseku č. 2 "Nadjezd", uzl. stan. km 0,205 - 0,659. Celková délka stavební úpravy silnice III/49016 včetně mostu je 454 m, z toho délka mostu je 196,6 m, vč. přechodových úseků 206 m. Rekonstrukce mostu ev. č. 49016-2 bude spočívat v celkové obnově mostního svršku vč. hydroizolace a odvodnění mostu, v sanaci nosné konstrukce a spodní stavby mostu. (Czech)
    0 references
    The object of the project is the reconstruction of the bridge No. 49016-2 (overpass at the bus station) including the road on it and road III/49016 in the node section No. 2 “Nadjezd”, no. tent km 0,205-0,659. The total length of the construction modification of road III/49016, including the bridge is 454 m, of which the bridge length is 196.6 m, incl. crossing sections 206 m. The reconstruction of the bridge ev. No. 49016-2 will consist of the total renewal of the bridge superstructure incl. the waterproofing and drainage of the bridge, in the remediation of the supporting structure and the lower construction of the bridge. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0001122