Sewage sewerage and wastewater treatment plant Drhovy (Q60601): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q214255 was merged with Q4859)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Système d’assainissement des eaux usées et station d’épuration des eaux usées Drhovy

Revision as of 22:51, 28 November 2021

Project Q60601 in Czech Republic
Language Label Description Also known as
English
Sewage sewerage and wastewater treatment plant Drhovy
Project Q60601 in Czech Republic

    Statements

    0 references
    13,767,461.52 Czech koruna
    0 references
    550,698.46 Euro
    10 January 2020
    0 references
    21,596,018.08 Czech koruna
    0 references
    863,840.72 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    8 January 2018
    0 references
    28 February 2020
    0 references
    Obec Drhovy
    0 references
    0 references
    0 references

    49°45'41.80"N, 14°11'31.67"E
    0 references
    26301
    0 references
    Novostavba splašková kanalizace a ČOV, která bude ukončena v centrální čerpací stanici na východním okraji obce s výtlakem do nové čistírny odpadních vod. Nová ČOV bude umístěna pod obcí na břehu Drhovského rybníka, do kterého budou vyčištěné odpadní vody vypouštěny. V rámci projektu bude vybudována splašková gravitační splašková kanalizace v délce 1963 m, tlaková kanalizace v délce 214 metrů, čerpací stanice 1 a 2, výtlačné řady v délce 306 metrů a ČOV s kapacitou 300 EO. (Czech)
    0 references
    New building of sewage sewage and sewage treatment plant, which will be completed in the central petrol station on the eastern edge of the village with displacement to a new sewage treatment plant. The new WWTP will be placed under the village on the shore of Drhovský pond, into which the treated waste water will be discharged. The project will build a gravitational sewage sewage system of 1963 m long, 214 metres pressure sewerage, pumping stations 1 and 2, displacement series in length 306 metres and WWTP with a capacity of 300 EO. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004866
    0 references