Upgrading of the power grid with SN and NN voltage power grid allowing the connection of units of electricity generation from RES to Tarnowski and Nowy Sącz district (Q112106): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project will ensure the viability of the electricity networks on the premises of the selected localities of the Tarnowski and Nowy Sącz districts by extending the possibility to connect new units of electricity generation from renewable sources to dispersed electricity generation. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. The project consists...)
Property / summary
 
The project will ensure the viability of the electricity networks on the premises of the selected localities of the Tarnowski and Nowy Sącz districts by extending the possibility to connect new units of electricity generation from renewable sources to dispersed electricity generation. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. The project consists of six tasks of the conversion of the low-voltage network with the necessary mean voltage to the mean voltage: task 1. Modernisation of the CCN network TRTS545; zadanie 2. Upgrading of the B5 S758 transformer station and NN and SN networks; 3. Modernisation of the NN network to be powered from TRTS531 DTS Dzierżanines, 4; task 4. Modernisation of the NN network powered by Jastrzębie 5 TRTS 588; zadanie 5. Upgrading the TRTS755 transformer station of the River Bides.2 and NN and SN, Activity 6. Upgrading the network station of Biskupnik Bidze 6 TRTS759 and NN and SN.Increasing network cross-sections and upgrading of the transformer stations will increase the capacity of the RES connection. The tasks are also aimed at improving the conditions for the supply of N-NN individual customers and improving the certainty of the supply of power to customers by performing additional connections of the upgraded NN networks with networks from other transformer stations. The investments will enable the Applicant to manage the electricity produced with the OSCI more efficiently, the technical and architectural design, reconstruction and construction of the overhead line and, where appropriate, the cable equipment, are the solutions developed in the negotiations with the landowners. Options were selected for the most cost-effective and acceptable solutions by the owners of the land. (English)
Property / summary: The project will ensure the viability of the electricity networks on the premises of the selected localities of the Tarnowski and Nowy Sącz districts by extending the possibility to connect new units of electricity generation from renewable sources to dispersed electricity generation. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. The project consists of six tasks of the conversion of the low-voltage network with the necessary mean voltage to the mean voltage: task 1. Modernisation of the CCN network TRTS545; zadanie 2. Upgrading of the B5 S758 transformer station and NN and SN networks; 3. Modernisation of the NN network to be powered from TRTS531 DTS Dzierżanines, 4; task 4. Modernisation of the NN network powered by Jastrzębie 5 TRTS 588; zadanie 5. Upgrading the TRTS755 transformer station of the River Bides.2 and NN and SN, Activity 6. Upgrading the network station of Biskupnik Bidze 6 TRTS759 and NN and SN.Increasing network cross-sections and upgrading of the transformer stations will increase the capacity of the RES connection. The tasks are also aimed at improving the conditions for the supply of N-NN individual customers and improving the certainty of the supply of power to customers by performing additional connections of the upgraded NN networks with networks from other transformer stations. The investments will enable the Applicant to manage the electricity produced with the OSCI more efficiently, the technical and architectural design, reconstruction and construction of the overhead line and, where appropriate, the cable equipment, are the solutions developed in the negotiations with the landowners. Options were selected for the most cost-effective and acceptable solutions by the owners of the land. (English) / rank
 
Normal rank

Revision as of 11:37, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Upgrading of the power grid with SN and NN voltage power grid allowing the connection of units of electricity generation from RES to Tarnowski and Nowy Sącz district
Project in Poland financed by DG Regio

    Statements

    0 references
    1,763,286.35 zloty
    0 references
    423,188.724 Euro
    13 January 2020
    0 references
    3,678,812.47 zloty
    0 references
    882,914.9928 Euro
    13 January 2020
    0 references
    58.98 percent
    0 references
    25 February 2019
    0 references
    31 March 2020
    0 references
    TAURON DYSTRYBUCJA SPÓŁKA AKCYJNA
    0 references
    Realizacja projektu zapewni prawidłowe funkcjonowanie sieci elektroenergetycznych na terenie wybranych miejscowości powiatu tarnowskiego i nowosądeckiego poszerzając możliwość przyłączania nowych jednostek wytwarzania energii elektrycznej ze źródeł odnawialnych w rozproszeniu. W gminach gdzie zlokalizowany jest projekt planowany jest znaczący wzrost ilości instalacji OZE wytwarzających energię elektryczną. Projekt składa się z sześciu zadań przebudowy sieci niskiego napięcia wraz z niezbędnym odcinakiem sieci średniego napięcia:Zadanie 1. Modernizacja sieci nN zasilanej ze stacji Bujne TRTS545;Zadanie 2. Modernizacja stacji transformatorowej Rzepiennik Biskupi 5 S758 oraz sieci nN i SN;Zadanie 3. Modernizacja sieci nN zasilanej ze stacji transformatorowej TRTS531 Dzierżaniny 4;Zadanie 4. Modernizacja sieci nN zasilanej ze stacji transformatorowej Jastrzębia 5 TRTS 588;Zadanie 5. Modernizacja stacji transformatorowej TRTS755 Rzepiennik Biskupi 2 oraz sieci nN i SN;Zadanie 6. Modernizacja stacji transformatorowej Rzepiennik Biskupi 6 TRTS759 oraz sieci nN i SN.Zwiększenie przekrojów sieci oraz modernizacja stacji transformatorowych pozwoli na zwiększenie mocy przyłączeniowej OZE. Zadania mają również na celu poprawę warunków zasilania odbiorców indywidualnych zasilanych z sieci nN oraz poprawę pewności zasilania odbiorców, poprzez wykonanie dodatkowych połączeń modernizowanych sieci nN z sieciami zasilanymi z innych stacji transformatorowych. Inwestycje pozwolą Wnioskodawcy skuteczniej zarządzać energią elektryczną wytworzoną z OZE.Wybrane rozwiązania techniczne oraz architektoniczne, przebudowa i budowa linii napowietrznych i tam gdzie było to konieczne kablowych, są rozwiązaniami wypracowanymi w toku negocjacji z właścicielami gruntów. Wybrano rozwiązania najbardziej korzystne kosztowo i jednocześnie akceptowalne przez właścicieli gruntów.Ciąg dalszy w punkcie Q. (Polish)
    0 references
    The project will ensure the viability of the electricity networks on the premises of the selected localities of the Tarnowski and Nowy Sącz districts by extending the possibility to connect new units of electricity generation from renewable sources to dispersed electricity generation. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. The project consists of six tasks of the conversion of the low-voltage network with the necessary mean voltage to the mean voltage: task 1. Modernisation of the CCN network TRTS545; zadanie 2. Upgrading of the B5 S758 transformer station and NN and SN networks; 3. Modernisation of the NN network to be powered from TRTS531 DTS Dzierżanines, 4; task 4. Modernisation of the NN network powered by Jastrzębie 5 TRTS 588; zadanie 5. Upgrading the TRTS755 transformer station of the River Bides.2 and NN and SN, Activity 6. Upgrading the network station of Biskupnik Bidze 6 TRTS759 and NN and SN.Increasing network cross-sections and upgrading of the transformer stations will increase the capacity of the RES connection. The tasks are also aimed at improving the conditions for the supply of N-NN individual customers and improving the certainty of the supply of power to customers by performing additional connections of the upgraded NN networks with networks from other transformer stations. The investments will enable the Applicant to manage the electricity produced with the OSCI more efficiently, the technical and architectural design, reconstruction and construction of the overhead line and, where appropriate, the cable equipment, are the solutions developed in the negotiations with the landowners. Options were selected for the most cost-effective and acceptable solutions by the owners of the land. (English)
    0 references

    Identifiers

    RPMP.04.01.02-12-0208/18
    0 references