Comprehensive thermal modernisation of two public utilities in the municipality of Strzelowo (Q108934): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project involves thermal renovation of 2 public utilities in the municipality of Strzelowo. In the framework of the project, improvements have been made to significantly reduce the energy intensity of these plants. A minimum of 5 improvements are being made in order to achieve the best possible energy effect in a cost-effective way. The reduction of CO2 to ATMOFERY is [a -78 % building, a GB-96 % building] an average of 88 %. Final energy sa...)
Property / summary
 
The project involves thermal renovation of 2 public utilities in the municipality of Strzelowo. In the framework of the project, improvements have been made to significantly reduce the energy intensity of these plants. A minimum of 5 improvements are being made in order to achieve the best possible energy effect in a cost-effective way. The reduction of CO2 to ATMOFERY is [a -78 % building, a GB-96 % building] an average of 88 %. Final energy saving [of the Z-74.14 % building, GB-85.78 % Building] average 79.96 %. The project is in line with the municipal plan for the Low Carbon Economy (PGN). The target group is resident in the municipality. The aim of the project is to reduce CO2 emissions to the atmosphere through the use of renewable solar panels together with a comprehensive deep thermal modernisation of the 2 sites belonging to the Municipality. Improvements in the facilities: SCHOOL TEAM: Heating system installation of LPG container, installation of a gas installation, installation of a series of cascade system of two condensing gas-fired condensing boilers with hydraulic clutch. Subject: 793.90 m² of window frames to replacement for new, Pow: 329.66 m² of indoor/outdoor ventilation of Pow.: 1 877.00 m² ventilation system performance of mechanical ventilation installations with heat recovery of RES heat photovoltaic installations with a 10kWp photovoltaic installation using polycrystalline panels, power 250 Wp, 40 space button. 70 m² of efficient LED. BUILDING OFFICE: District heating system heating system, assembly of a boiler firing pelet with an oplet system, installation of a new installation, which is equipped with the panel radiators with thermostatic radiators. 348.50 m² entrance to new, Pow: 2.40 m² entrance to new, Pow.: 15.90 m² of insulation of ceilings.: 397.70 m² of window dressing for replacement with a new, Pow: 109.19 m² of indoor/outdoor use of Pow.: 489.80 m² of indoor heating (m²) (English)
Property / summary: The project involves thermal renovation of 2 public utilities in the municipality of Strzelowo. In the framework of the project, improvements have been made to significantly reduce the energy intensity of these plants. A minimum of 5 improvements are being made in order to achieve the best possible energy effect in a cost-effective way. The reduction of CO2 to ATMOFERY is [a -78 % building, a GB-96 % building] an average of 88 %. Final energy saving [of the Z-74.14 % building, GB-85.78 % Building] average 79.96 %. The project is in line with the municipal plan for the Low Carbon Economy (PGN). The target group is resident in the municipality. The aim of the project is to reduce CO2 emissions to the atmosphere through the use of renewable solar panels together with a comprehensive deep thermal modernisation of the 2 sites belonging to the Municipality. Improvements in the facilities: SCHOOL TEAM: Heating system installation of LPG container, installation of a gas installation, installation of a series of cascade system of two condensing gas-fired condensing boilers with hydraulic clutch. Subject: 793.90 m² of window frames to replacement for new, Pow: 329.66 m² of indoor/outdoor ventilation of Pow.: 1 877.00 m² ventilation system performance of mechanical ventilation installations with heat recovery of RES heat photovoltaic installations with a 10kWp photovoltaic installation using polycrystalline panels, power 250 Wp, 40 space button. 70 m² of efficient LED. BUILDING OFFICE: District heating system heating system, assembly of a boiler firing pelet with an oplet system, installation of a new installation, which is equipped with the panel radiators with thermostatic radiators. 348.50 m² entrance to new, Pow: 2.40 m² entrance to new, Pow.: 15.90 m² of insulation of ceilings.: 397.70 m² of window dressing for replacement with a new, Pow: 109.19 m² of indoor/outdoor use of Pow.: 489.80 m² of indoor heating (m²) (English) / rank
 
Normal rank

Revision as of 11:19, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive thermal modernisation of two public utilities in the municipality of Strzelowo
Project in Poland financed by DG Regio

    Statements

    0 references
    1,308,272.81 zloty
    0 references
    313,985.4744 Euro
    13 January 2020
    0 references
    1,644,734.98 zloty
    0 references
    394,736.39519999997 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 January 2016
    0 references
    30 September 2018
    0 references
    GMINA STRZEGOWO
    0 references

    52°53'37.0"N, 20°17'7.1"E
    0 references
    Projekt zakłada termomodernizacje 2 obiektów użyteczności publicznej na terenie Gminy Strzegowo. W ramach projektu zostały zastosowane usprawnienia pozwalające na znaczne ograniczenie energochłonności tych obiektów. Zastosowano min. 5 ulepszeń tak powiązanych ze sobą żeby uzyskać jak najlepszy efekt energetyczny przy zachowaniu opłacalności inwestycji. REDUKCJA CO2 DO ATMOSFERY WYNIESIE [budynek ZS-78%, budynek GB-96%] średnia 88%. OSZCZĘDNOŚCI ENERGII KOŃCOWEJ WYNOSZĄ [budynek ZS-74,14%, budynek GB-85,78%] średnia 79,96%. Projekt jest zgodny z gminnym Planem Gospodarki Niskoemisyjnej (PGN). Grupę docelową stanowią mieszkańcy Gminy. Celem projektu jest ograniczenie emisji CO2 do atmosfery poprzez zastosowanie OZE PANELE FOTOWOLTAICZNE wraz z kompleksową GŁĘBOKĄ termomodernizacją 2 obiektów należących do Gminy. Ulepszenia zastosowane w obiektach: ZESPÓŁ SZKÓŁ: SYSTEM GRZEWCZY Montaż zbiornika na gaz płynny, wykonanie instalacji gazowej, montaż kompaktowego układu kaskadowego dwóch gazowych kotłów kondensacyjnych ze sprzęgłem hydraulicznym. DOCIEPLENIE-STROPODACH Pow.:793,90m2 STOLARKA OKIENNA Wymiana na nową, Pow.:329,66m2 DOCIEPLENIE ŚCIAN ZEWNĘTRZNYCH Pow.:1877,00m2 WENTYLACJA MECHANICZNA Wykonanie instalacji wentylacji mechanicznej wraz z odzyskiem ciepła OZE FOTOWOLTAIKA zastosowanie instalacji fotowoltaicznej o mocy 10 kWp z wykorzystaniem paneli polikrystalicznych, moc 250 Wp, 40 szt.o pow. 70m2 WYMIANA OŚWIETLENIA NA ENERGOOSZCZĘDNE LED. BUDYNEK BIUROWO GOSPODARCZY: SYSTEM GRZEWCZY instalacji centralnego ogrzewania, montaż kotła spalającego pelet z podajnikiem opału, montaż nowej instalacji co wyposażonej w panelowe grzejniki z zaworami termostatycznymi. DRZWI WEJŚCIOWE Wymiana na nową, Pow.:2,40m2 BRAMA WEJŚCIOWA Wymiana na nową, Pow.:15,90m2 DOCIEPLENIE STROPODACH Pow.:397,70 m2 STOLARKA OKIENNA Wymiana na nową, Pow.:109,19m2 DOCIEPLENIE ŚCIAN ZEWNĘTRZNYCH Pow.:489,80m2˛ DOCIEPLENIE PODLOGI Pow.:348,50m2 WYMIANA OŚWIETLENIA NA ENERGOOSZCZĘDNE (Polish)
    0 references
    The project involves thermal renovation of 2 public utilities in the municipality of Strzelowo. In the framework of the project, improvements have been made to significantly reduce the energy intensity of these plants. A minimum of 5 improvements are being made in order to achieve the best possible energy effect in a cost-effective way. The reduction of CO2 to ATMOFERY is [a -78 % building, a GB-96 % building] an average of 88 %. Final energy saving [of the Z-74.14 % building, GB-85.78 % Building] average 79.96 %. The project is in line with the municipal plan for the Low Carbon Economy (PGN). The target group is resident in the municipality. The aim of the project is to reduce CO2 emissions to the atmosphere through the use of renewable solar panels together with a comprehensive deep thermal modernisation of the 2 sites belonging to the Municipality. Improvements in the facilities: SCHOOL TEAM: Heating system installation of LPG container, installation of a gas installation, installation of a series of cascade system of two condensing gas-fired condensing boilers with hydraulic clutch. Subject: 793.90 m² of window frames to replacement for new, Pow: 329.66 m² of indoor/outdoor ventilation of Pow.: 1 877.00 m² ventilation system performance of mechanical ventilation installations with heat recovery of RES heat photovoltaic installations with a 10kWp photovoltaic installation using polycrystalline panels, power 250 Wp, 40 space button. 70 m² of efficient LED. BUILDING OFFICE: District heating system heating system, assembly of a boiler firing pelet with an oplet system, installation of a new installation, which is equipped with the panel radiators with thermostatic radiators. 348.50 m² entrance to new, Pow: 2.40 m² entrance to new, Pow.: 15.90 m² of insulation of ceilings.: 397.70 m² of window dressing for replacement with a new, Pow: 109.19 m² of indoor/outdoor use of Pow.: 489.80 m² of indoor heating (m²) (English)
    0 references

    Identifiers

    RPMA.04.02.00-14-4512/16
    0 references