Construction of the public warning and alarm system for the sandbox (Q109198): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project will be carried out by the sandal District and 100 % of the municipalities in the district (KRYTERIUM MERRARY SPECIFIC No 2 (RBMs 2). In the event of emergencies, threats or natural disturbances, by building a warning system and alerting the public to the public. This objective will be achieved through the construction of 71 emergency points (PA) at the designated sites and by the installation of 1 district offices together with a co...)
Property / summary
 
The project will be carried out by the sandal District and 100 % of the municipalities in the district (KRYTERIUM MERRARY SPECIFIC No 2 (RBMs 2). In the event of emergencies, threats or natural disturbances, by building a warning system and alerting the public to the public. This objective will be achieved through the construction of 71 emergency points (PA) at the designated sites and by the installation of 1 district offices together with a control application by definition: District Starost Office in Piaseczno (SP) — 1 modular exchange panel with the control application and — 68. A Pa of an emergency electronic multifunction tubes of 600 W in a quantity of: (SP) — 4 units; municipalities: Piaseczno (PG) — 14 head; Top (GGK) — 11, Lesznowola (GL) — 10 units, Photos (GPR) — 6 pcs, Konstancin-Jez. (GKJ) — 9, Tarczyn (GT) -14. 3 units PA followed by an emergency electronic emergency sirens of 900W installed in the municipalities of: 1 units (GGK) — 1, (GT) -1. The applicant shall ensure that each PA is able to set up a sirens, an integrating device, a control device and an antenna, 220V or 380V electric power and access to the IP VPN Internet (each PA — separate IP VPN). The entire system will meet the requirements arising from the Recommand of the Governor of Mazowieckie Province for the construction of an integrated warning and alert system for the population. Phases of the project: 1. to select economic operators for the construction of a warning and alarm system in accordance with the provisions of the paragraph 2. Assembly of all elements of the system and its activation 3. The project phases do not require a building permit. For these tasks, the provisions do not require the initiation of an EIA procedure. The planned final date for the completion of the project is 20.02.2017. (English)
Property / summary: The project will be carried out by the sandal District and 100 % of the municipalities in the district (KRYTERIUM MERRARY SPECIFIC No 2 (RBMs 2). In the event of emergencies, threats or natural disturbances, by building a warning system and alerting the public to the public. This objective will be achieved through the construction of 71 emergency points (PA) at the designated sites and by the installation of 1 district offices together with a control application by definition: District Starost Office in Piaseczno (SP) — 1 modular exchange panel with the control application and — 68. A Pa of an emergency electronic multifunction tubes of 600 W in a quantity of: (SP) — 4 units; municipalities: Piaseczno (PG) — 14 head; Top (GGK) — 11, Lesznowola (GL) — 10 units, Photos (GPR) — 6 pcs, Konstancin-Jez. (GKJ) — 9, Tarczyn (GT) -14. 3 units PA followed by an emergency electronic emergency sirens of 900W installed in the municipalities of: 1 units (GGK) — 1, (GT) -1. The applicant shall ensure that each PA is able to set up a sirens, an integrating device, a control device and an antenna, 220V or 380V electric power and access to the IP VPN Internet (each PA — separate IP VPN). The entire system will meet the requirements arising from the Recommand of the Governor of Mazowieckie Province for the construction of an integrated warning and alert system for the population. Phases of the project: 1. to select economic operators for the construction of a warning and alarm system in accordance with the provisions of the paragraph 2. Assembly of all elements of the system and its activation 3. The project phases do not require a building permit. For these tasks, the provisions do not require the initiation of an EIA procedure. The planned final date for the completion of the project is 20.02.2017. (English) / rank
 
Normal rank

Revision as of 09:47, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the public warning and alarm system for the sandbox
Project in Poland financed by DG Regio

    Statements

    0 references
    1,128,350.7 zloty
    0 references
    270,804.168 Euro
    13 January 2020
    0 references
    1,433,661.08 zloty
    0 references
    344,078.6592 Euro
    13 January 2020
    0 references
    79.04 percent
    0 references
    19 November 2015
    0 references
    30 March 2018
    0 references
    POWIAT PIASECZYŃSKI
    0 references

    51°59'3.8"N, 21°12'50.4"E
    0 references

    52°5'0.6"N, 21°7'14.9"E
    0 references

    52°5'20.4"N, 20°56'31.9"E
    0 references

    52°4'28.9"N, 21°1'37.6"E
    0 references

    51°56'25.4"N, 20°57'24.5"E
    0 references

    51°58'48.0"N, 20°50'1.3"E
    0 references
    Projekt będzie realizowanym przez Powiat Piaseczyński i 100% gmin wchodzących w skład powiatu (KRYTERIUM MERYTORYCZNE SZCZEGÓŁOWE nr 2 (KMS nr2).Założeniem proj. jest poprawa bezpieczeństwa mieszkańców Pow. Piaseczyń. w sytuacjach wystąpienia nagłych awarii, zagrożeń lub zjawisk katastrofalnych poprzez budowę systemu ostrzegania i alarmowania ludności o zagrożeniach. Realizacja tego celu nastąpi poprzez budowę 71 punktów alarmowych (PA) w wyznaczonych miejscach oraz zainstalowanie 1 centrali powiatowej wraz z aplikacją sterującą wg założenia: Starostwo Powiatowe w Piasecznie (SP) - 1 modułowa centrala alarmowa wraz z aplikacją sterującą oraz - 68 szt. PA z elektronicznymi wielofunkcyjnymi syrenami alarmowymi o mocy 600W w ilości: (SP) - 4 szt; gminy: Piaseczno (GP)- 14 szt; Góra Kal. (GGK) - 11 szt., Lesznowola (GL) - 10 szt., Prażmów (GPR)- 6 szt., Konstancin-Jez. (GKJ) - 9 szt., Tarczyn (GT) -14 szt. 3 szt. PA z elektronicznymi wielofunkcyjnymi syrenami alarmowymi o mocy 900W zainstalowanych w gminach: (GP) - 1 szt., (GGK) - 1 szt., (GT) -1 szt. Wnioskodawca zapewni dla każdego PA możliwość założenia syreny, urządzenia włączającego, urządzenia sterującego i anteny, energię elektryczną 220V lub 380V oraz dostęp do Internetu IP VPN (każde PA - oddzielny IP VPN). Cały system będzie spełniał wymogi wynikające z Rekomendacji Wojewody Mazowieckiego dla budowy zintegrowanego systemu ostrzegania i alarmowania ludności o zagrożeniach. Etapy realiz. projektu: 1. wyłonienie wykonawców budowy systemu ostrzegania i alarmowania zgodnie z przepisami pzp 2. montaż wszystkich elementów systemu oraz jego uruchomienie 3. działania inform-promocyjne przekazujące wiedzę z zakresu rodzajów alarmów i komunikatów ostrz. oraz oraz zagrożeń. Etapy projektu nie wymagają uzyskania pozwolenia na budowę. Dla ww. zadań przepisy nie przewidują wymogu wszczęcia postępowania w sprawie oceny oddziaływania na środowisko. Planowany term. zakończenia realizacji projektu to 20.02.2017 r. (Polish)
    0 references
    The project will be carried out by the sandal District and 100 % of the municipalities in the district (KRYTERIUM MERRARY SPECIFIC No 2 (RBMs 2). In the event of emergencies, threats or natural disturbances, by building a warning system and alerting the public to the public. This objective will be achieved through the construction of 71 emergency points (PA) at the designated sites and by the installation of 1 district offices together with a control application by definition: District Starost Office in Piaseczno (SP) — 1 modular exchange panel with the control application and — 68. A Pa of an emergency electronic multifunction tubes of 600 W in a quantity of: (SP) — 4 units; municipalities: Piaseczno (PG) — 14 head; Top (GGK) — 11, Lesznowola (GL) — 10 units, Photos (GPR) — 6 pcs, Konstancin-Jez. (GKJ) — 9, Tarczyn (GT) -14. 3 units PA followed by an emergency electronic emergency sirens of 900W installed in the municipalities of: 1 units (GGK) — 1, (GT) -1. The applicant shall ensure that each PA is able to set up a sirens, an integrating device, a control device and an antenna, 220V or 380V electric power and access to the IP VPN Internet (each PA — separate IP VPN). The entire system will meet the requirements arising from the Recommand of the Governor of Mazowieckie Province for the construction of an integrated warning and alert system for the population. Phases of the project: 1. to select economic operators for the construction of a warning and alarm system in accordance with the provisions of the paragraph 2. Assembly of all elements of the system and its activation 3. The project phases do not require a building permit. For these tasks, the provisions do not require the initiation of an EIA procedure. The planned final date for the completion of the project is 20.02.2017. (English)
    0 references

    Identifiers

    RPMA.05.01.00-14-4016/15
    0 references