Construction of PSZOK in the municipality of Stin (Q105570): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The main aim of the project is to create the right conditions for the residents of the municipality to properly manage the waste, thereby ensuring that the requirements of the national legislation and of the European Union are brought into line with the legal requirements. Tasks to be carried out: 1. construction work on PSZOK and purchase of equipment for PSZOK (construction of two steel rings, lifting tank assembly. 10.0 m³, construction of th...)
Property / summary
 
The main aim of the project is to create the right conditions for the residents of the municipality to properly manage the waste, thereby ensuring that the requirements of the national legislation and of the European Union are brought into line with the legal requirements. Tasks to be carried out: 1. construction work on PSZOK and purchase of equipment for PSZOK (construction of two steel rings, lifting tank assembly. 10.0 m³, construction of the storm water system with oil separator and sealed, construction of concrete boxing concrete on waste, curing the manoeuvring area of the dirt bar, installation of galvanised poles with LED fittings, installation of a site monitoring facility. 2. information campaign on waste segregation, separate collection and negative impacts on the environment and residents’ health. The project will achieve the following result indicators: 1.Number of persons receiving waste collection selective — 9925 persons, 2.Number of jobs created — 1. Building work in the PSZOK will be an important part of the overall waste management system in the municipality of Stin. The target group is all of the residents of the municipality of Stin. (English)
Property / summary: The main aim of the project is to create the right conditions for the residents of the municipality to properly manage the waste, thereby ensuring that the requirements of the national legislation and of the European Union are brought into line with the legal requirements. Tasks to be carried out: 1. construction work on PSZOK and purchase of equipment for PSZOK (construction of two steel rings, lifting tank assembly. 10.0 m³, construction of the storm water system with oil separator and sealed, construction of concrete boxing concrete on waste, curing the manoeuvring area of the dirt bar, installation of galvanised poles with LED fittings, installation of a site monitoring facility. 2. information campaign on waste segregation, separate collection and negative impacts on the environment and residents’ health. The project will achieve the following result indicators: 1.Number of persons receiving waste collection selective — 9925 persons, 2.Number of jobs created — 1. Building work in the PSZOK will be an important part of the overall waste management system in the municipality of Stin. The target group is all of the residents of the municipality of Stin. (English) / rank
 
Normal rank

Revision as of 09:28, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of PSZOK in the municipality of Stin
Project in Poland financed by DG Regio

    Statements

    0 references
    856,715.0 zloty
    0 references
    205,611.6 Euro
    13 January 2020
    0 references
    1,670,217.0 zloty
    0 references
    400,852.07999999996 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 March 2017
    0 references
    29 November 2019
    0 references
    GMINA STANIN
    0 references
    Głównym celem projektu jest stworzenie odpowiednich warunków dla mieszkańców gminy Stanin umożliwiających odpowiednie zagospodarowanie odpadów, zapewniając tym samym, dostosowanie do wymogów prawnych, zawartych w przepisach krajowych oraz Unii Europejskiej. Zadania przewidziane do realizacji: 1. prace budowlane w PSZOK i zakup wyposażenia do PSZOK,(budowy dwóch wiat o konstrukcji stalowej,montaż zbiornika bezodpływowego poj. 10,0m3,budowy kanalizacji deszczowej z separatorem substancji ropopochodnych i zbiornikiem szczelnym,budowie boksów betonowych na odpady segregowane,utwardzeniu placu manewrowego kostką brukową,montaż słupów ocynkowanych z oprawami LED, wykonanie instalacji monitoringu obiektu. 2. kampania informacyjna dotycząca segregacji odpadów, selektywnej zbiórki oraz negatywnego wpływu na środowisko i zdrowie mieszkańców. W ramach projektu zostaną osiągnięte następujące wskaźniki rezultatu: 1.Liczba osób objętych selektywnym zbieraniem odpadów - 9925 osoby, 2.Liczba nowo utworzonych miejsc pracy - 1. Prace budowlane w PSZOK będą stanowiły istotny element całościowego systemu gospodarowania odpadami na terenie gminy Stanin. Grupę docelową stanowią wszyscy mieszkańcy gminy Stanin (Polish)
    0 references
    The main aim of the project is to create the right conditions for the residents of the municipality to properly manage the waste, thereby ensuring that the requirements of the national legislation and of the European Union are brought into line with the legal requirements. Tasks to be carried out: 1. construction work on PSZOK and purchase of equipment for PSZOK (construction of two steel rings, lifting tank assembly. 10.0 m³, construction of the storm water system with oil separator and sealed, construction of concrete boxing concrete on waste, curing the manoeuvring area of the dirt bar, installation of galvanised poles with LED fittings, installation of a site monitoring facility. 2. information campaign on waste segregation, separate collection and negative impacts on the environment and residents’ health. The project will achieve the following result indicators: 1.Number of persons receiving waste collection selective — 9925 persons, 2.Number of jobs created — 1. Building work in the PSZOK will be an important part of the overall waste management system in the municipality of Stin. The target group is all of the residents of the municipality of Stin. (English)
    0 references