Q330008 (Q330008): Difference between revisions
Jump to navigation
Jump to search
(Created a new Item) |
(Created claim: summary (P836): THE WHOLE “OPEN THE GOOD SCHOOL” PROJECT, FULLY IN LINE WITH THE CURRICULUM AND CALIBRATED TO FACILITATE THE IMPLEMENTATION OF THE IMPROVEMENT PLAN, IS COMPOSED OF 7 MODULES FOR IPS OF 150 PUPILS IN THE CIRCLE. WITHIN THE COMPLEX ARCHITECTURE OF THE ESF ACTION PLAN DESIGNED LITALIANO, SPORT AND MUSIC ARE EDUCATIONAL RESOURCES TARGETED AT BOTH THE LEARNING AND THE EDUCATION PLAN TO PREVENT THE EO FROM COMBATING LATENT FORMS OF OBVIOUS HARDSHIP AN...) |
||
Property / summary | |||
THE WHOLE “OPEN THE GOOD SCHOOL” PROJECT, FULLY IN LINE WITH THE CURRICULUM AND CALIBRATED TO FACILITATE THE IMPLEMENTATION OF THE IMPROVEMENT PLAN, IS COMPOSED OF 7 MODULES FOR IPS OF 150 PUPILS IN THE CIRCLE. WITHIN THE COMPLEX ARCHITECTURE OF THE ESF ACTION PLAN DESIGNED LITALIANO, SPORT AND MUSIC ARE EDUCATIONAL RESOURCES TARGETED AT BOTH THE LEARNING AND THE EDUCATION PLAN TO PREVENT THE EO FROM COMBATING LATENT FORMS OF OBVIOUS HARDSHIP AND THE RISK OF CULTURAL AND SOCIAL EXCLUSION OF SMALL ALUNNI.00PM ON THE SAR PROJECT, EXTENDED TRAINING PROVISION, NOT ONLY IN TERMS OF THE AMOUNT OF TIME TO STAY AT SCHOOL, BUT ABOVE ALL IN TERMS OF THE MATERIAL QUALITY OF PI. IN FACT, THE SCHOOL HAS OPENED UP TO THE TERRITORY ONLINE WITH OTHER INSTITUTIONS AND IN COLLABORATION WITH LOCAL SAR AUTHORITIES CAPABLE OF IMPLEMENTING NEW AND INTEGRATED METHODOLOGICAL AND TEACHING APPROACHES WHICH WILL CERTAINLY HAVE IMPORTANT BLACKMAIL. (English) | |||
Property / summary: THE WHOLE “OPEN THE GOOD SCHOOL” PROJECT, FULLY IN LINE WITH THE CURRICULUM AND CALIBRATED TO FACILITATE THE IMPLEMENTATION OF THE IMPROVEMENT PLAN, IS COMPOSED OF 7 MODULES FOR IPS OF 150 PUPILS IN THE CIRCLE. WITHIN THE COMPLEX ARCHITECTURE OF THE ESF ACTION PLAN DESIGNED LITALIANO, SPORT AND MUSIC ARE EDUCATIONAL RESOURCES TARGETED AT BOTH THE LEARNING AND THE EDUCATION PLAN TO PREVENT THE EO FROM COMBATING LATENT FORMS OF OBVIOUS HARDSHIP AND THE RISK OF CULTURAL AND SOCIAL EXCLUSION OF SMALL ALUNNI.00PM ON THE SAR PROJECT, EXTENDED TRAINING PROVISION, NOT ONLY IN TERMS OF THE AMOUNT OF TIME TO STAY AT SCHOOL, BUT ABOVE ALL IN TERMS OF THE MATERIAL QUALITY OF PI. IN FACT, THE SCHOOL HAS OPENED UP TO THE TERRITORY ONLINE WITH OTHER INSTITUTIONS AND IN COLLABORATION WITH LOCAL SAR AUTHORITIES CAPABLE OF IMPLEMENTING NEW AND INTEGRATED METHODOLOGICAL AND TEACHING APPROACHES WHICH WILL CERTAINLY HAVE IMPORTANT BLACKMAIL. (English) / rank | |||
Normal rank |
Revision as of 13:11, 3 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Italy financed by DG Regio |
Statements
50,484.0 Euro
0 references
50,484.0 Euro
0 references
100.0 percent
0 references
20 September 2017
0 references
3 August 2018
0 references
7 January 2019
0 references
2 C.D. "S. GIUSEPPE"
0 references
LINTERO PROGETTO OPEN THE GOOD SCHOOL PERFETTAMENTE IN LINEA CON IL PTOF DI SCUOLA E ADEGUATAMENTE CALIBRATO PER FACILITARE LATTUAZIONE DEL PIANO DI MIGLIORAMENTO SI COMPONE DI 7 MODULI DESTINATI A PI DI 150 ALUNNI DEL CIRCOLO. ALLINTERNO DELLA COMPLESSA ARCHITETTURA DEL PIANO DI AZIONI FSE PROGETTATO LITALIANO LO SPORT E LA MUSICA RAPPRESENTANO MEZZI FORMATIVI DI INTERVENTO MIRATO SIA SUL PIANO DEGLI APPRENDIMENTI CHE SU QUELLO EDUCATIVO PER PREVENIRE EO CONTRASTARE FORME LATENTI EO MANIFESTE DI DISAGIO E RISCHIO DI ESCLUSIONE CULTURALE E SOCIALE DEI PICCOLI ALUNNI.ATTRAVERSO IL PROGETTO SAR AMPLIATA LOFFERTA FORMATIVA NON SOLO IN TERMINI DI QUANTIT DI TEMPO DI PERMANENZA A SCUOLA MA SOPRATTUTTO IN TERMINI PI SOSTANZIALI DI QUALIT DI ESSO. INFATTI LA SCUOLA APRENDOSI AL TERRITORIO IN RETE CON ALTRE ISTITUZIONI E IN COLLABORAZIONE CON REALT ASSOCIATIVE LOCALI SAR IN GRADO DI ATTUARE APPROCCI METODOLOGICI ALTERNATIVI E DIDATTICHE NUOVE E INTEGRATE CHE AVRANNO CERTAMENTE IMPORTANTI RICAD (Italian)
0 references
THE WHOLE “OPEN THE GOOD SCHOOL” PROJECT, FULLY IN LINE WITH THE CURRICULUM AND CALIBRATED TO FACILITATE THE IMPLEMENTATION OF THE IMPROVEMENT PLAN, IS COMPOSED OF 7 MODULES FOR IPS OF 150 PUPILS IN THE CIRCLE. WITHIN THE COMPLEX ARCHITECTURE OF THE ESF ACTION PLAN DESIGNED LITALIANO, SPORT AND MUSIC ARE EDUCATIONAL RESOURCES TARGETED AT BOTH THE LEARNING AND THE EDUCATION PLAN TO PREVENT THE EO FROM COMBATING LATENT FORMS OF OBVIOUS HARDSHIP AND THE RISK OF CULTURAL AND SOCIAL EXCLUSION OF SMALL ALUNNI.00PM ON THE SAR PROJECT, EXTENDED TRAINING PROVISION, NOT ONLY IN TERMS OF THE AMOUNT OF TIME TO STAY AT SCHOOL, BUT ABOVE ALL IN TERMS OF THE MATERIAL QUALITY OF PI. IN FACT, THE SCHOOL HAS OPENED UP TO THE TERRITORY ONLINE WITH OTHER INSTITUTIONS AND IN COLLABORATION WITH LOCAL SAR AUTHORITIES CAPABLE OF IMPLEMENTING NEW AND INTEGRATED METHODOLOGICAL AND TEACHING APPROACHES WHICH WILL CERTAINLY HAVE IMPORTANT BLACKMAIL. (English)
0 references
Identifiers
J41H17000130006
0 references