Thermo-design of the public utilities of the vulture district (Q98210): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project involves the thermal modernisation of 4 district public buildings: the administrative building of the Social Assistance House in Suchączku, a building of laboratory diagnosis and pathological anatomy in Więcboru, and the psycho-pedagogical and pedagogical building in Sęba Krajeński. All buildings concerned are facilities built in a low thermal standard and require action to increase their standard. The implementation of the thermomod...) |
||
Property / summary | |||
The project involves the thermal modernisation of 4 district public buildings: the administrative building of the Social Assistance House in Suchączku, a building of laboratory diagnosis and pathological anatomy in Więcboru, and the psycho-pedagogical and pedagogical building in Sęba Krajeński. All buildings concerned are facilities built in a low thermal standard and require action to increase their standard. The implementation of the thermomodernisation measures indicated in the proposal is necessary in view of the overall poor technical condition of the buildings. The thermal refurbishment of the district’s performance in terms of the exchange and modernisation of the various sources of heat production has been completed. The project will provide for the thermal modernisation of the following works, consisting of the execution of the following thermomodernisation work, together with the necessary accompanying works: (a) in the Building of the Social Assistance House in Suchączku: insulation of external walls, styropiate, insulation of the basement of the styrofoam, heating system: in a pathological anatomy: replacement of woodwork for the new PVC, with deep shaft, insulation of the external wall of the polystyrene, replacement of woodwork for the new PVC, replacement of woodwork for the new PVC, the insulation of the costume by laying the plate of the stipenes; (c) in the building a medical laboratory: the insulation of roof mineral wool, the insulation of the basement of the basement, the replacement of window and door frames for a new PC, the insulation of external walls; (D) in the psychological-pedagogy building: the design of the ceiling and the replacement of window frames on the plastic windows. The realisation of the investment will contribute to the achievement of the objectives of the project as follows: improving the state of the environment, improving people’s health, support them in working conditions and education, reducing operating costs. (English) | |||
Property / summary: The project involves the thermal modernisation of 4 district public buildings: the administrative building of the Social Assistance House in Suchączku, a building of laboratory diagnosis and pathological anatomy in Więcboru, and the psycho-pedagogical and pedagogical building in Sęba Krajeński. All buildings concerned are facilities built in a low thermal standard and require action to increase their standard. The implementation of the thermomodernisation measures indicated in the proposal is necessary in view of the overall poor technical condition of the buildings. The thermal refurbishment of the district’s performance in terms of the exchange and modernisation of the various sources of heat production has been completed. The project will provide for the thermal modernisation of the following works, consisting of the execution of the following thermomodernisation work, together with the necessary accompanying works: (a) in the Building of the Social Assistance House in Suchączku: insulation of external walls, styropiate, insulation of the basement of the styrofoam, heating system: in a pathological anatomy: replacement of woodwork for the new PVC, with deep shaft, insulation of the external wall of the polystyrene, replacement of woodwork for the new PVC, replacement of woodwork for the new PVC, the insulation of the costume by laying the plate of the stipenes; (c) in the building a medical laboratory: the insulation of roof mineral wool, the insulation of the basement of the basement, the replacement of window and door frames for a new PC, the insulation of external walls; (D) in the psychological-pedagogy building: the design of the ceiling and the replacement of window frames on the plastic windows. The realisation of the investment will contribute to the achievement of the objectives of the project as follows: improving the state of the environment, improving people’s health, support them in working conditions and education, reducing operating costs. (English) / rank | |||
Normal rank |
Revision as of 07:44, 6 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermo-design of the public utilities of the vulture district |
Project in Poland financed by DG Regio |
Statements
357,231.99 zloty
0 references
663,543.63 zloty
0 references
70.82 percent
0 references
4 April 2016
0 references
30 June 2018
0 references
POWIAT SĘPOLEŃSKI
0 references
Projekt obejmuje wykonanie termomodernizacji 4 powiatowych budynków użyteczności publicznej: budynku administracyjnego Domu Pomocy Społecznej w Suchorączku, budynku diagnostyki laboratoryjnej i anatomii patologicznej w Więcborku oraz budynku Poradni Psychologiczno-Pedagogicznej w Sępólnie Krajeńskim. Wszystkie rozpatrywane budynki są obiektami wybudowanymi w niskim standardzie cieplnym i wymagają działań podnoszących ich standard. Wykonanie wskazanych we wniosku działań termomodernizacyjnych jest niezbędne ze względu na ogólny zły stan techniczny budynków. Termomodernizacja dopełni działania powiatu w zakresie dokonanych wymian i modernizacji poszczególnych źródeł wytwarzania ciepła. W ramach projektu przewiduje się wykona nie prac termomodernizacyjnych polegających na wykonaniu następujących robót termomodernizacyjnych wraz z niezbędnymi pracami towarzyszącymi: a) w budynku Domu Pomocy Społecznej w Suchorączku: docieplenie ścian zewnętrznych styropianem, docieplenie stropu piwnicy styropianem, płukanie instalacji grzewczej: b) w budynku anatomii patologicznej: wymiana stolarki drewnianej na nową PCV z szybą zespoloną, docieplenie ścian zewnętrznych płytami styropianowymi, wymiana stolarki drewnianej na nową, docieplenie stropodachu przez ułożenie płytsze styropapy; c) w budynku laboratorium medycznego: docieplenie połaci dachowych wełną mineralną, docieplenie stropu nad piwnicą, wymiana stolarki okiennej i drzwiowej na nową z PC, docieplenie ścian zewnętrznych; d) w budynku Poradni Psychologiczno-Pedagogicznej: docieplanie stropu poddasza oraz wymiana stolarki okiennej na okna plastikowe. Przeprowadzenie inwestycji przyczyni się do osiągnięcia takich celów projektu jak: poprawa stanu środowiska, poprawa stanu zdrowia mieszkańców, poprą wę warunków pracy i kształcenia, zmniejszenie kosztów funkcjonowania obiektów. (Polish)
0 references
The project involves the thermal modernisation of 4 district public buildings: the administrative building of the Social Assistance House in Suchączku, a building of laboratory diagnosis and pathological anatomy in Więcboru, and the psycho-pedagogical and pedagogical building in Sęba Krajeński. All buildings concerned are facilities built in a low thermal standard and require action to increase their standard. The implementation of the thermomodernisation measures indicated in the proposal is necessary in view of the overall poor technical condition of the buildings. The thermal refurbishment of the district’s performance in terms of the exchange and modernisation of the various sources of heat production has been completed. The project will provide for the thermal modernisation of the following works, consisting of the execution of the following thermomodernisation work, together with the necessary accompanying works: (a) in the Building of the Social Assistance House in Suchączku: insulation of external walls, styropiate, insulation of the basement of the styrofoam, heating system: in a pathological anatomy: replacement of woodwork for the new PVC, with deep shaft, insulation of the external wall of the polystyrene, replacement of woodwork for the new PVC, replacement of woodwork for the new PVC, the insulation of the costume by laying the plate of the stipenes; (c) in the building a medical laboratory: the insulation of roof mineral wool, the insulation of the basement of the basement, the replacement of window and door frames for a new PC, the insulation of external walls; (D) in the psychological-pedagogy building: the design of the ceiling and the replacement of window frames on the plastic windows. The realisation of the investment will contribute to the achievement of the objectives of the project as follows: improving the state of the environment, improving people’s health, support them in working conditions and education, reducing operating costs. (English)
0 references
Identifiers
RPKP.03.03.00-04-0038/16
0 references