Thermal modernisation of public buildings in the city and municipality of Jabłonczowa Pomorskie (countryside light): Construction of a public building (a community centre in Nowa Wieś) and its refurbishment and renovation, — Change in the use of parts of the public building (the community building in Lembung) to the technical room (boiler tower) and its alteration (Q98170): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. The works will be carried out in 2018. each building will increase energy efficiency above 25 %.1. insulation of external walls; replacement of input door; floor insulation on the ground; modernisation of the heating system for hot water; modernisation of the heating system with a boiler for biomass; lighting...) |
||
Property / summary | |||
The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. The works will be carried out in 2018. each building will increase energy efficiency above 25 %.1. insulation of external walls; replacement of input door; floor insulation on the ground; modernisation of the heating system for hot water; modernisation of the heating system with a boiler for biomass; lighting exchange and installation; 2.Farm centre building in Nowa Wieś: insulation of the external wall; insulation wall wall; floor insulation on the ground; insulation of the unventilated valve; replacement of external doors; installation of a new ca..s installation with the biomass boiler technology; modernisation of the heating system; The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. There will be increased energy efficiency above 25 % in each building. The planned thermal modernisation works will make it possible to improve the energy efficiency of the final energy in connection with the use of the buildings in the following quantities (in line with audits): 1.Farm centre building in Lembang — 88.27 % 2.Farm centre building in Nowa Wsi-72.27 %. (English) | |||
Property / summary: The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. The works will be carried out in 2018. each building will increase energy efficiency above 25 %.1. insulation of external walls; replacement of input door; floor insulation on the ground; modernisation of the heating system for hot water; modernisation of the heating system with a boiler for biomass; lighting exchange and installation; 2.Farm centre building in Nowa Wieś: insulation of the external wall; insulation wall wall; floor insulation on the ground; insulation of the unventilated valve; replacement of external doors; installation of a new ca..s installation with the biomass boiler technology; modernisation of the heating system; The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. There will be increased energy efficiency above 25 % in each building. The planned thermal modernisation works will make it possible to improve the energy efficiency of the final energy in connection with the use of the buildings in the following quantities (in line with audits): 1.Farm centre building in Lembang — 88.27 % 2.Farm centre building in Nowa Wsi-72.27 %. (English) / rank | |||
Normal rank |
Revision as of 07:44, 6 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings in the city and municipality of Jabłonczowa Pomorskie (countryside light): Construction of a public building (a community centre in Nowa Wieś) and its refurbishment and renovation, — Change in the use of parts of the public building (the community building in Lembung) to the technical room (boiler tower) and its alteration |
Project in Poland financed by DG Regio |
Statements
401,323.49 zloty
0 references
958,768.74 zloty
0 references
75.0 percent
0 references
28 September 2016
0 references
31 January 2019
0 references
MIASTO I GMINA JABŁONOWO POMORSKIE
0 references
Termomodernizacja 2 budynków użyteczności publicznej będzie polegać na przeprowadzeniu kompleksowej termomodernizacji obejmującej głęboką modernizację energetyczną. Prace zostaną przeprowadzone w 2018 r. W każdym z budynków nastąpi zwiększenie efektywność energetycznej powyżej 25%.1.Budynek świetlicy wiejskiej w Lembargu:docieplenie dachu skośnego;docieplenie stropu nad parterem; docieplenie ścian zewnętrznych; wymiana drzwi wejściowych zewn.;docieplenie podłogi na gruncie;modernizacja systemu podgrzewania c.w.u.; modernizacja systemu ogrzewania z kotłem na biomasę; wymiana i montaż oświetlenia;2.Budynek świetlicy wiejskiej w Nowej Wsi:docieplenie ściany zewnętrznej; docieplenie ściany cokołowej; docieplenie podłogi na gruncie; docieplenie stropodachu niewentylowanego; wymiana drzwi zewnętrznych;wykonanie nowej instalacji c.o.wraz z technologią kotłowni na biomasę; modernizacja systemu podgrzewania c.w.u.; Termomodernizacja 2 budynków użyteczności publicznej będzie polegać na przeprowadzeniu kompleksowej termomodernizacji obejmującej głęboką modernizację energetyczną. W każdym z budynku nastąpi zwiększ.efektywności energetycznej powyżej 25%. Planowane prace termomodernizacyjne umożliwią poprawę efektywności energetycznej określonej dla energii końcowej w związku z eksploatacją budynków w następujących wielkościach (zgodnie z audytami): 1.Budynek świetlicy wiejskiej w Lembargu – 88,27 % 2.Budynek świetlicy wiejskiej w Nowej Wsi–72,27 %. (Polish)
0 references
The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. The works will be carried out in 2018. each building will increase energy efficiency above 25 %.1. insulation of external walls; replacement of input door; floor insulation on the ground; modernisation of the heating system for hot water; modernisation of the heating system with a boiler for biomass; lighting exchange and installation; 2.Farm centre building in Nowa Wieś: insulation of the external wall; insulation wall wall; floor insulation on the ground; insulation of the unventilated valve; replacement of external doors; installation of a new ca..s installation with the biomass boiler technology; modernisation of the heating system; The thermal renovation of the 2 public buildings will consist of a comprehensive thermal renovation including a deep energy modernisation. There will be increased energy efficiency above 25 % in each building. The planned thermal modernisation works will make it possible to improve the energy efficiency of the final energy in connection with the use of the buildings in the following quantities (in line with audits): 1.Farm centre building in Lembang — 88.27 % 2.Farm centre building in Nowa Wsi-72.27 %. (English)