“Construction of photovoltaic equipment on healthcare buildings in Toruń” (Q98084): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The object of the project is the construction of units producing electricity (micro-installations) in the health care buildings of the city of Toruñ. The micro-solar installations will be constructed in the following facilities: (1) M. Kopernik Municipal Hospital in Toruń, ul. Batore 17/19; (2) Municipal Specialist Station; UL. University 17; (3) Municipal Specialist Station; UL. Łyskowski 15; 4) Care and nursing; UL. The Polish League 8.Project...)
Property / summary
 
The object of the project is the construction of units producing electricity (micro-installations) in the health care buildings of the city of Toruñ. The micro-solar installations will be constructed in the following facilities: (1) M. Kopernik Municipal Hospital in Toruń, ul. Batore 17/19; (2) Municipal Specialist Station; UL. University 17; (3) Municipal Specialist Station; UL. Łyskowski 15; 4) Care and nursing; UL. The Polish League 8.Project will be implemented under Measure 3.1. Support for the production and distribution of energy from renewable sources, diagram: Micro-installations, diagram 2: the health infrastructure in the ROP for 2014-2020.The main project is to increase the production of renewable energy in the territory of the City of Toruñ by the use of photovoltaic installations in the health care buildings. The installed capacity of a single PV installation will not exceed 40 kWp. Total electricity production will be around 124 945 kWh/rok.produced photovoltaic installations will be used to produce electricity for their own utility, mainly in order to meet customer’s current needs. The planned measures relating to the purchase and installation of modern renewable energy technologies, using solar power for the production of electricity, make a significant contribution to improving the environment in the region. It is expected that the project will result in a reduction in greenhouse gas emissions by approximately 101,45 Mg CO2/rok. The investment will take place in the period 2017-2018. The project is covered by State aid in accordance with the Regulation of the Minister for Infrastructure and Development of 3 September 2015 on the provision of investment aid for high-efficiency cogeneration and the promotion of energy from renewable sources in the framework of the regional operational programmes for the period 2014-2020. (English)
Property / summary: The object of the project is the construction of units producing electricity (micro-installations) in the health care buildings of the city of Toruñ. The micro-solar installations will be constructed in the following facilities: (1) M. Kopernik Municipal Hospital in Toruń, ul. Batore 17/19; (2) Municipal Specialist Station; UL. University 17; (3) Municipal Specialist Station; UL. Łyskowski 15; 4) Care and nursing; UL. The Polish League 8.Project will be implemented under Measure 3.1. Support for the production and distribution of energy from renewable sources, diagram: Micro-installations, diagram 2: the health infrastructure in the ROP for 2014-2020.The main project is to increase the production of renewable energy in the territory of the City of Toruñ by the use of photovoltaic installations in the health care buildings. The installed capacity of a single PV installation will not exceed 40 kWp. Total electricity production will be around 124 945 kWh/rok.produced photovoltaic installations will be used to produce electricity for their own utility, mainly in order to meet customer’s current needs. The planned measures relating to the purchase and installation of modern renewable energy technologies, using solar power for the production of electricity, make a significant contribution to improving the environment in the region. It is expected that the project will result in a reduction in greenhouse gas emissions by approximately 101,45 Mg CO2/rok. The investment will take place in the period 2017-2018. The project is covered by State aid in accordance with the Regulation of the Minister for Infrastructure and Development of 3 September 2015 on the provision of investment aid for high-efficiency cogeneration and the promotion of energy from renewable sources in the framework of the regional operational programmes for the period 2014-2020. (English) / rank
 
Normal rank

Revision as of 07:43, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of photovoltaic equipment on healthcare buildings in Toruń”
Project in Poland financed by DG Regio

    Statements

    0 references
    380,614.79 zloty
    0 references
    91,347.5496 Euro
    13 January 2020
    0 references
    771,727.3 zloty
    0 references
    185,214.552 Euro
    13 January 2020
    0 references
    57.32 percent
    0 references
    1 February 2017
    0 references
    31 December 2018
    0 references
    GMINA MIASTA TORUŃ
    0 references
    Przedmiotem przedsięwzięcia jest budowa jednostek wytwarzania energii elektrycznej (mikroinstalacji) w budynkach opieki zdrowotnej na obszarze Miasta Torunia. Mikroinstalacje fotowoltaiczne zostaną wybudowane w następujących obiektach:1) Specjalistyczny Szpital Miejski im. M. Kopernika w Toruniu, ul. Batorego 17/19;2) Miejska Przychodnia Specjalistyczna; ul. Uniwersytecka 17;3) Miejska Przychodnia Specjalistyczna; ul. Łyskowskiego 15;4) Zakład Pielęgnacyjno-Opiekuńczy; ul. Ligi Polskiej 8.Projekt będzie realizowany w ramach Działania 3.1. Wspieranie wytwarzania i dystrybucji energii pochodzącej ze źródeł odnawialnych, schemat: Mikroinstalacje, schemat 2: infrastruktura opieki zdrowotnej RPO WKP na lata 2014-2020.Celem głównym projektu jest zwiększenie produkcji energii ze źródeł odnawialnych na terenie Gminy Miasta Toruń poprzez zastosowanie instalacji fotowoltaicznych w budynkach opieki zdrowotnej. Zainstalowana moc pojedynczej instalacji fotowoltaicznej nie przekraczać będzie 40 kWp. Łączna produkcja energii elektrycznej wyniesie ok. 124 945 kWh/rok.Wybudowane w ramach projektu instalacje fotowoltaiczne będą wykorzystywane do produkcji energii elektrycznej na potrzeby własne ww. obiektów użyteczności publicznej, głównie w celu zaspokojenia bieżących potrzeb odbiorców. Zaplanowane działania, związane z zakupem i instalacją nowoczesnych technologii OZE, wykorzystujące słońce do produkcji energii elektrycznej, wpłyną istotnie na poprawę środowiska naturalnego w regionie. Przewiduje się że w wyniku realizacji projektu nastąpi redukcja emisji gazów cieplarnianych o ok. 101,45 Mg CO2/rok. Inwestycja realizowana będzie w latach 2017-2018. Projekt objęty jest pomocą publiczną zgodnie z Rozporządzeniem Ministra Infrastruktury i Rozwoju z dnia 3 września 2015 r. w sprawie udzielania pomocy na inwestycje w układy wysokosprawnej Kogeneracji oraz promowanie energii ze źródeł odnawialnych w ramach regionalnych programów operacyjnych na lata 2014-2020. (Polish)
    0 references
    The object of the project is the construction of units producing electricity (micro-installations) in the health care buildings of the city of Toruñ. The micro-solar installations will be constructed in the following facilities: (1) M. Kopernik Municipal Hospital in Toruń, ul. Batore 17/19; (2) Municipal Specialist Station; UL. University 17; (3) Municipal Specialist Station; UL. Łyskowski 15; 4) Care and nursing; UL. The Polish League 8.Project will be implemented under Measure 3.1. Support for the production and distribution of energy from renewable sources, diagram: Micro-installations, diagram 2: the health infrastructure in the ROP for 2014-2020.The main project is to increase the production of renewable energy in the territory of the City of Toruñ by the use of photovoltaic installations in the health care buildings. The installed capacity of a single PV installation will not exceed 40 kWp. Total electricity production will be around 124 945 kWh/rok.produced photovoltaic installations will be used to produce electricity for their own utility, mainly in order to meet customer’s current needs. The planned measures relating to the purchase and installation of modern renewable energy technologies, using solar power for the production of electricity, make a significant contribution to improving the environment in the region. It is expected that the project will result in a reduction in greenhouse gas emissions by approximately 101,45 Mg CO2/rok. The investment will take place in the period 2017-2018. The project is covered by State aid in accordance with the Regulation of the Minister for Infrastructure and Development of 3 September 2015 on the provision of investment aid for high-efficiency cogeneration and the promotion of energy from renewable sources in the framework of the regional operational programmes for the period 2014-2020. (English)
    0 references

    Identifiers

    RPKP.03.01.00-04-0008/17
    0 references