(‎Created claim: summary (P836): The investment concerns the conversion of apartment buildings to multi-dwelling buildings at ul. Bishop Tomasz I 13, 16, 18 and ul. 31 in Wrocław. Buildings currently do not comply with the rules in force under the Construction Law Act. In addition, the buildings are characterised by low thermal insulation parameters that are obsolete (excluding grinding) and by the large operator of window and door joinery all in poor technical condition and re...)
Property / summary
 
The investment concerns the conversion of apartment buildings to multi-dwelling buildings at ul. Bishop Tomasz I 13, 16, 18 and ul. 31 in Wrocław. Buildings currently do not comply with the rules in force under the Construction Law Act. In addition, the buildings are characterised by low thermal insulation parameters that are obsolete (excluding grinding) and by the large operator of window and door joinery all in poor technical condition and require major renovation works. The main objective of the project is to increase the energy efficiency of buildings. The constituent parts of the project are 4 tasks connected with the conversion of apartment buildings to multi-dwelling buildings at ul. Bishop Tomasz I and ul. The city of Wrocław in Wrocław, as well as promotion activities and project management (in the context of the clearance procedure). As part of the main work on thermal modernisation, it is planned to: Construction of connections to district heating networks (N/N) The grinding centre, where the heating substation is installed) — installation of a hot water block in a heat node — insulation of the external walls of the ground floor — heating of the non-heated floor wall — replacement of windows and doors for energy efficient joinery in all multi-apartment residential buildings covered by the project will be carried out broader than thermal modernisation. However, due to the guidelines and programme records, only thermal modernisation costs resulting from the developed energy audits and covering the optimal option are taken into account in the project. The final building permits have been obtained, and the others will be obtained by 06.02.2017. The investment is complete, i.e. it includes a component: Thermal modernisation (final energy savings in each of these buildings is at least 25 %, in line with audits); Energy management (including thermostatic valves in each building); Education — surrender (English)
Property / summary: The investment concerns the conversion of apartment buildings to multi-dwelling buildings at ul. Bishop Tomasz I 13, 16, 18 and ul. 31 in Wrocław. Buildings currently do not comply with the rules in force under the Construction Law Act. In addition, the buildings are characterised by low thermal insulation parameters that are obsolete (excluding grinding) and by the large operator of window and door joinery all in poor technical condition and require major renovation works. The main objective of the project is to increase the energy efficiency of buildings. The constituent parts of the project are 4 tasks connected with the conversion of apartment buildings to multi-dwelling buildings at ul. Bishop Tomasz I and ul. The city of Wrocław in Wrocław, as well as promotion activities and project management (in the context of the clearance procedure). As part of the main work on thermal modernisation, it is planned to: Construction of connections to district heating networks (N/N) The grinding centre, where the heating substation is installed) — installation of a hot water block in a heat node — insulation of the external walls of the ground floor — heating of the non-heated floor wall — replacement of windows and doors for energy efficient joinery in all multi-apartment residential buildings covered by the project will be carried out broader than thermal modernisation. However, due to the guidelines and programme records, only thermal modernisation costs resulting from the developed energy audits and covering the optimal option are taken into account in the project. The final building permits have been obtained, and the others will be obtained by 06.02.2017. The investment is complete, i.e. it includes a component: Thermal modernisation (final energy savings in each of these buildings is at least 25 %, in line with audits); Energy management (including thermostatic valves in each building); Education — surrender (English) / rank
 
Normal rank

Revision as of 07:34, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive thermal modernisation of selected multi-occupancy housing at ul. Bishop Tomasz I and ul. Wroc³aw, Wrocław
Project in Poland financed by DG Regio

    Statements

    0 references
    3,556,210.53 zloty
    0 references
    853,490.5271999999 Euro
    13 January 2020
    0 references
    6,623,877.26 zloty
    0 references
    1,589,730.5424 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 December 2017
    0 references
    30 November 2018
    0 references
    GMINA WROCŁAW
    0 references
    Inwestycja dotyczy przebudowy budynków mieszkalnych wielorodzinnych przy ul. Biskupa Tomasza I 13, 16, 18 i ul. Mieleckiej 31 we Wrocławiu. Budynki aktualnie nie spełniają obowiązujących przepisów wynikających z Ustawy Prawo budowlane. Poza tym budynki charakteryzują się niskimi parametrami izolacji cieplnej, przestarzałą instalacją c.o., c.w.u. (z wyłączeniem Mieleckiej) oraz znacznym wyeksploatowaniem stolarki okiennej i drzwiowej, wszystkie znajdują się w złym stanie technicznym i wymagają przeprowadzenia gruntownych prac remontowych. Głównym celem projektu jest wzrost efektywności energetycznej budynków. Częściami składowymi projektu jest 4 zadania związane z przebudową budynków mieszkalnych wielorodzinnych przy ul. Biskupa Tomasza I i ul. Mieleckiej we Wrocławiu, jak również działania promocyjne oraz zarządzanie projektem (w kontekście rozliczenia). W ramach głównych prac związanych z termomodernizacją planowane jest: - wykonanie przyłączy do miejskiej sieci ciepłowniczej (nd. Mieleckiej, gdzie węzeł cieplny jest zainstalowany) - montaż bloku c.w.u w węźle cieplnym - docieplenie ścian zewnętrznych kondygnacji naziemnych - docieplenie podłogi nieogrzewanego poddasza - wymianę okien i drzwi na stolarkę energooszczędną We wszystkich wielorodzinnych budynkach mieszkalnych objętych projektem zostaną przeprowadzane prace szersze aniżeli jedynie termomodernizacja. Jednakże ze względu na wytyczne i zapisy programowe w ramach projektu uwzględniono jedynie koszty termomodernizacji wynikające z opracowanych audytów energetycznych a obejmujące wariant optymalny.Dla inwestycji przy ul. Mieleckiej uzyskano prawomocne pozwolenia na budowę, pozostałe zostaną uzyskane do 06.02.2017. Inwestycja jest kompletna tj. zawiera komponent: - termomodernizacyjny (oszczędność energii końcowej w każdym z ww. budynków wynosi co najmniej 25%, zgodnie z audytami); - zarządzania energią (m.in. zawory termostatyczne w każdym budynku); - edukacyjny – przekazanie mieszka (Polish)
    0 references
    The investment concerns the conversion of apartment buildings to multi-dwelling buildings at ul. Bishop Tomasz I 13, 16, 18 and ul. 31 in Wrocław. Buildings currently do not comply with the rules in force under the Construction Law Act. In addition, the buildings are characterised by low thermal insulation parameters that are obsolete (excluding grinding) and by the large operator of window and door joinery all in poor technical condition and require major renovation works. The main objective of the project is to increase the energy efficiency of buildings. The constituent parts of the project are 4 tasks connected with the conversion of apartment buildings to multi-dwelling buildings at ul. Bishop Tomasz I and ul. The city of Wrocław in Wrocław, as well as promotion activities and project management (in the context of the clearance procedure). As part of the main work on thermal modernisation, it is planned to: Construction of connections to district heating networks (N/N) The grinding centre, where the heating substation is installed) — installation of a hot water block in a heat node — insulation of the external walls of the ground floor — heating of the non-heated floor wall — replacement of windows and doors for energy efficient joinery in all multi-apartment residential buildings covered by the project will be carried out broader than thermal modernisation. However, due to the guidelines and programme records, only thermal modernisation costs resulting from the developed energy audits and covering the optimal option are taken into account in the project. The final building permits have been obtained, and the others will be obtained by 06.02.2017. The investment is complete, i.e. it includes a component: Thermal modernisation (final energy savings in each of these buildings is at least 25 %, in line with audits); Energy management (including thermostatic valves in each building); Education — surrender (English)