(7165.24052017.112000006) E-CUBER (Q2460200): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 15:16, 5 November 2020
Project Q2460200 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (7165.24052017.112000006) E-CUBER |
Project Q2460200 in Italy |
Statements
71,617.57 Euro
0 references
286,470.28 Euro
0 references
25.0 percent
0 references
21 September 2017
0 references
8 November 2019
0 references
14 March 2020
0 references
UNIVERSITA' DEGLI STUDI DI FIRENZE
0 references
IDEA ALLA BASE DEL PROGETTONOTA - PER COMODIT? DI LETTURA LE SIGLE USATE NEL PRESENTE DOCUMENTO SONO ELENCATE IN ALLEGATO 1 ?SIGLE E DEFINIZIONI?IL CONTESTO ATTUALE DELLO SCAMBIO ENERGETICO DA FONTI RINNOVABILILE FONTI DI ENERGIA RINNOVABILI (GFR), SPECIALMENTE QUELLA FOTOVOLTAICA, SONO ORMAI IN RAPIDA E COSTANTE ESPANSIONE ED UN NUMERO SEMPRE MAGGIORE DI UTENTI LE UTILIZZA PER SCOPI INDUSTRIALI E CIVILI.OGNI IMPIANTO ? CONNESSO ANCHE ALLA RETE ELETTRICA NAZIONALE PER CUI GLI UTENTI, IN NUMERO SEMPRE MAGGIORE SONO CONTEMPORANEAMENTE ANCHE PRODUTTORI (PRODUCER-CONSUMER O PROSUMER).L?ENERGIA PRODOTTA DAGLI IMPIANTI DI GENERAZIONE DA FONTE RINNOVABILE, IN CONSEGUENZA DELLA SUA TIPICA NON PROGRAMMABILIT?, PU? ECCEDERE IL FABBISOGNO MOMENTANEO DELL?IMPIANTO CHE, IN TALE CASO, ? COSTRETTO A RIVERSARLA SULLA RETE, COME PREVEDE LA MODALIT? ?SCAMBIO SUL POSTO? (SSP), PREVISTA DALLA DELIBERA 570/2012/R/EFR, RICEVENDONE PER? UN COMPENSO POCO REMUNERATIVO IN QUANTO SCONTATO DEGLI ONERI DI RETE. SE (Italian)
0 references
IDEA BEHIND PROGTONOTA — FOR COMODIT? ARE THE ACRONYMS USED IN THIS DOCUMENT TO BE LISTED IN ANNEX 1? ACRONYMS AND DEFINITIONS? THE CURRENT CONTEXT OF RNONOABILILE RENEWABLE ENERGY SOURCES (GFR), ESPECIALLY PHOTOVOLTAIC ENERGY SOURCES, ARE NOW RAPIDLY AND RAPIDLY EXPANDING AND AN INCREASING NUMBER OF USERS ARE USING IT FOR INDUSTRIAL PURPOSES AND CIVILOGAI INSTALLATION? CONNECTED ALSO TO THE NATIONAL ELECTRICITY GRID FOR WHICH USERS, IN INCREASING NUMBERS ARE ALSO PRODUCERS (PRODUCR-CONSUMER OR PROSUMER).L? IS THE ENERGY PRODUCED BY RENEWABLE GENERATION INSTALLATIONS, AS A RESULT OF ITS TYPICAL NON-PROGRAMMING PERIOD? EXCEEDING THE MOMENTARY NEEDS OF THE PLANT? IN THIS CASE? WOULD HE BE FORCED TO RETURN TO THE NETWORK, AS PROVIDED FOR IN THE PROCEDURE? EXCHANGE ON THE SPOT? (SSP), PROVIDED FOR IN RESOLUTION 570/2012/R/EFR, RECEIVING THEM FOR THEM? A REMUNERATION THAT IS NOT PROFITABLE AS A MEASURE OF NETWORK CHARGES. IF (English)
0 references
Identifiers
D51B17002280009
0 references