(A19_093_2016_0930100_1102) RICPA (Q2066510): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 14:34, 2 November 2020
Project Q2066510 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_093_2016_0930100_1102) RICPA |
Project Q2066510 in Italy |
Statements
17,720.0 Euro
0 references
35,440.0 Euro
0 references
50.0 percent
0 references
1 August 2016
0 references
1 August 2018
0 references
1 August 2018
0 references
ELBATERME SRL
0 references
L'EDIFICIO OGGETTO DEL PROGETTO E ADIBITO A RICEZIONE ALBERGHIERA. LA STRUTTURA E COMPOSTA DA 85 CAMERE, UNA RECEPTION E VARI LOCALI TECNICI. L'INTERVENTO E VOLTO A GARANTIRE IL RAGGIUNGIMENTO DI UN RAGGUARDEVOLE RISPARMIO DI ENERGIA PRIMARIA E DI CONSEGUENZA DI CONSUMI ENERGETICI MEDIANTE SOSTITUZIONE INSTALLAZIONE DI NUOVI APPARATI DA INTEGRARE NEI SISTEMI ESISTENTI. SI E PREVISTO DI INTERVENIRE SU TUTTI GLI APPARATI PRESENTI NELLE 85 CAMERE MEDIANTE DOTAZIONE AD OGNI VENTILCONVETTORE DI UNA VALVOLA DI ZONA A TRE VIE IN GRADO DI INTERCETTARE IL FLUIDO EVITANDO CHE DURANTE IL PERIODO DI INUTILIZZO DELLA CAMERA CONTINUI AD ESSERCI UN INUTILE DISPENDIO DI ENERGIA. INOLTRE E STATA PREVISTA L'INSTALLAZIONE UN SISTEMA DI TELEGESTIONE IN GRADO OPERARE DIRETTAMENTE DALLA HALL ALLA MODIFICA DI OGNI PARAMETRO DI FUNZIONAMENTO SIA DELL'ILLUMINAZIONE CHE DEL VENTILCONVETTORE DELLE SINGOLE CAMERE E DELLE PARTI COMUNI IN MODO DA GARANTIRE UN UTILIZZO EFFETTIVAMENTE EFFICACE DEL SISTEMA. (Italian)
0 references
THE BUILDING WHICH IS THE SUBJECT OF THE PROJECT AND INTENDED FOR THE RECEPTION OF THE HOTEL. THE STRUCTURE AND CONSISTS OF 85 CHAMBERS, A RECEPTION RECEPTION AND SEVERAL TECHNICAL ROOMS. THE AIM OF THIS ACTION IS TO ENSURE THAT SUBSTANTIAL PRIMARY ENERGY SAVINGS ARE ACHIEVED AND HENCE ENERGY CONSUMPTION BY REPLACING NEW EQUIPMENT TO BE INTEGRATED INTO EXISTING SYSTEMS. IT IS EXPECTED THAT ALL THE EQUIPMENT IN THE 85 CHAMBERS WILL BE DEPLOYED BY MEANS OF AN ALLOCATION TO EACH FAN COIL UNIT OF A THREE-WAY VALVE WHICH IS CAPABLE OF INTERCEPTING THE FLUID WHILE AVOIDING THAT THERE CONTINUES TO BE ANY UNNECESSARY USE OF ENERGY DURING THE TIME OF THE CHAMBER’S USE. IN ADDITION, PROVISION HAS BEEN MADE FOR THE INSTALLATION OF A SYSTEM OF REMOTE MANAGEMENT THAT CAN OPERATE DIRECTLY FROM THE HALL, TO THE MODIFICATION OF EACH PARAMETER FOR THE OPERATION OF BOTH THE LIGHTING AND THE FAN COIL UNITS OF THE INDIVIDUAL CHAMBERS AND THE COMMON PARTS IN ORDER TO ENSURE THE EFFECTIVE USE OF THE SYSTEM. (English)
0 references
Identifiers
D58I16002480009
0 references