ENERGY UPGRADING OF THE MATERIAL ATTACHED TO THE LOWER SECONDARY SCHOOL OF MASSANZAGO (PD) (Q2072827): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 13:38, 2 November 2020
Project Q2072827 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY UPGRADING OF THE MATERIAL ATTACHED TO THE LOWER SECONDARY SCHOOL OF MASSANZAGO (PD) |
Project Q2072827 in Italy |
Statements
56,460.49 Euro
0 references
141,151.22 Euro
0 references
40.0 percent
0 references
6 September 2016
0 references
24 January 2019
0 references
30 September 2018
0 references
COMUNE DI MASSANZAGO
0 references
LINTERVENTO CONSISTE IN ISOLAMENTO DELLE PARETI PERIMETRALI ESTERNE (COIBENTAZIONE DI TIPO A CAPPOTTO), ISOLAMENTO TERMICO DELLA COPERTURA E SOSTITUZIONE DI PARTE DEI SERRAMENTI E SOSTITUZIONE DEI CORPI ILLUMINANTI ESISTENTI, CON NUOVE UNITA' A LED. (Italian)
0 references
THE INTERVENTION CONSISTS OF INSULATING THE OUTER EDGE WALLS (INSULATION OF THE OUTER FRAME), THERMAL INSULATION OF THE COVERAGE AND REPLACEMENT OF PART OF THE BUILDING AND REPLACEMENT OF THE EXISTING ILLUMINATING BODIES, WITH NEW LED UNITS. (English)
0 references
Identifiers
B86J16001150006
0 references