(10360.14072017.115000060) LOC. CARRAIA (Q2056984): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 12:07, 2 November 2020
Project Q2056984 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000060) LOC. CARRAIA |
Project Q2056984 in Italy |
Statements
221,440.91 Euro
0 references
738,136.34 Euro
0 references
30.0 percent
0 references
30 March 2018
0 references
30 March 2020
0 references
16 November 2020
0 references
COMUNE DI CALENZANO
0 references
GLI INTERVENTI PREVISTI, FINALIZZATI AL RISPARMIO ENERGETICO, OLTRE A QUELLI EDILI COMPLEMENTARI ED ALTRI DEL COMPLESSO SCOLASTICO SONO I SEGUENTI:- INSTALLAZIONE NUOVA POMPA DI CALORE PER FUNZIONAMENTO IBRIDO CON CALDAIA A METANO ESISTENTE, MODIFICHE SUGLI IMPIANTI DI DISTRIBUZIONE ED EMISSIONE DELL'IMPIANTO DI RISCALDAMENTO ED ALLACCIAMENTI ELETTRICI;- NUOVO SISTEMA DI TELECONTROLLO/TELEGESTIONE, MONITORAGGIO ENERGETICO E DIMMERIZZAZIONE CORPI ILLUMINANTI;- SOSTITUZIONE INFISSI ESISTENTI, CON DEI NUOVI CON DOPPIO VETRO E TELAIO IN ALLUMINIO A TAGLIO TERMICO PER TUTTO IL FABBRICATO;- REALIZZAZIONE DI CAPPOTTO TERMICO ESTERNO PER TUTTO IL FABBRICATO;- INSTALLAZIONE DI FRANGISOLE SU ALCUNE FINESTRE DEL COMPLESSO PER RIDUZIONE SOLEGGIAMENTO INTERNO;- REALIZZAZIONE DI TETTO VENTILATO PER RIDUZIONE SURRISCALDAMENTO ESTIVO NELLA PORZIONE CHE OSPITA LA SCUOLA MATERNA (Italian)
0 references
THE MEASURES ENVISAGED, WITH THE AIM OF SAVING ENERGY, IN ADDITION TO THE ADDITIONAL CONSTRUCTION AND OTHER COMPONENTS OF THE SCHOOL COMPLEX, ARE AS FOLLOWS: — NEW HEAT PUMP INSTALLATION FOR HYBRID OPERATION WITH EXISTING METHANE BOILER, CHANGES TO THE HEATING SYSTEM AND THE INSTALLATION OF THE HEATING SYSTEM AND ELECTRICAL CONNECTIONS; — NEW REMOTE MANAGEMENT, ENERGY MONITORING AND DIME SYSTEM; — REPLACEMENT OF EXISTING FIXTURES, WITH NEW, WITH TWO NEW ONES WITH DOUBLE GLASS AND THERMAL CUT ALUMINIUM FRAME FOR THE ENTIRE BUILDING; — INSTALLATION OF EXTERNAL THERMAL COAT OVER THE ENTIRE BUILDING; — ERECTION OF FRANGISOLE ON SOME WINDOWS OF THE COMPLEX FOR INDOOR REDUCTION; — IMPLEMENTATION OF VENTILATED HEATING CEILING FOR SUMMER HEATING IN THE KINDERGARTEN SECTION (English)
0 references
Identifiers
E77D18000440006
0 references