PRIMARY SCHOOL VIA FOGAZZARO/PIAZZA ROMA (SUBIACO) (Q2035162): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 07:49, 2 November 2020

Project Q2035162 in Italy
Language Label Description Also known as
English
PRIMARY SCHOOL VIA FOGAZZARO/PIAZZA ROMA (SUBIACO)
Project Q2035162 in Italy

    Statements

    0 references
    182,026.0 Euro
    0 references
    364,052.0 Euro
    0 references
    50.0 percent
    0 references
    2 October 2017
    0 references
    13 December 2018
    0 references
    COMUNE DI SUBIACO
    0 references
    0 references
    0 references

    41°55'36.19"N, 13°5'39.95"E
    0 references
    SOSTITUZIONE CALDAIA ESISTENTE CON CALDAIE MODULARI A CONDENSAZIONE,INSTALLAZIONE TESTE TERMOSTATICHE E SOSTITUZIONE RADIATORI,SOSTITUZIONE CORPI ILLUMINANTI CON CORPI ILLUMINANTI LED,ISOLAMENTO TERMICO A CAPPOTTO,INSTALLAZIONE IMPIANTO FOTOVOLTAICO. (Italian)
    0 references
    EXISTING BOILER REPLACEMENT WITH MODULAR CONDENSING BOILERS, INSTALLATION OF THERMOSTATIC HEADS AND REPLACING RADIATORS, REPLACEMENT OF LIGHTING WITH LED LIGHTS, THERMAL INSULATION OF EIGHT, INSTALLATION OF PHOTOVOLTAIC SYSTEMS. (English)
    0 references

    Identifiers

    J25C16000230009
    0 references