COMPOSTING PLANT TO BE CARRIED OUT AT THE STIR BBATTIPAGLIA (Q2023326): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q2500972 was merged with Q252811) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 08:46, 29 December 2020
Project Q2023326 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | COMPOSTING PLANT TO BE CARRIED OUT AT THE STIR BBATTIPAGLIA |
Project Q2023326 in Italy |
Statements
7,267,076.06 Euro
0 references
9,689,434.74 Euro
0 references
75.0 percent
0 references
25 January 2017
0 references
31 December 2020
0 references
REGIONE CAMPANIA
0 references
IL PROGETTO PREVEDE LA REALIZZAZIONE DI UN IMPIANTO DI COMPOSTAGGIO AEROBICO PER LA FRAZIONE ORGANICA DA RACCOLTA DIFFERENZIATA.L'AREA INDIVIDUATA PER LA REALIZZAZIONE DELL'IMPIANTO DI COMPOSTAGGIO Ê ALL'INTERNO DI UNO DEGLI OPIFICI FACENTI PARTE DEL COMPLESSO INDUSTRIALE EX STIR DI BATTIPAGLIA AL FINE DI POTER RAGGIUNGERE LA PIENA AUTONOMIA A LIVELLO PROVINCIALE NEL TRATTAMENTO DELLA FRAZIONE ORGANICA DERIVANTE DA RACCOLTA DIFFERENZIATA.L'IMPIANTISTICA PREVISTA Ê STATA PROGETTATA IN MODO DA GARANTIRE IL TRATTAMENTO DI CIRCA 25.000 TONNELLATE ANNUE DI FRAZIONE ORGANICA DA RACCOLTA DIFFERENZIATA (FORD) E 10.000 TONNELLATE DI STRUTTURANTE CON TECNOLOGIA A CUMULI STATICI IN BIOTUNNEL E MATURAZIONE SU PLATEA AREATA E CUMULI DINAMICI. (Italian)
0 references
THE PROJECT PROVIDES FOR THE ESTABLISHMENT OF AN AEROBIC COMPOSTING PLANT FOR THE ORGANIC FRACTION FROM COLLECTION OF DIFFERTIATA.THE AREA IDENTIFIED FOR THE COMPOSTING PLANT. THE AREA IDENTIFIED FOR THE COMPOSTING PLANT IS DEVELOPED WITHIN ONE OF THE FACTORIES FORMING PART OF THE FORMER STIR PLANT OF BATTIPAGLIA IN ORDER TO BE ABLE TO REACH FULL AUTONOMY AT PROVINCIAL LEVEL IN THE TREATMENT OF THE ORGANIC FRACTION PRODUCED BY COLLECTION DIFFERENTIATA.THE PLANNED INSTALLATION WAS DESIGNED IN SUCH A WAY AS TO ENSURE THE TREATMENT OF APPROXIMATELY 25.000 TONNES PER YEAR OF ORGANIC SEPARATELY COLLECTED COLLECTION (FORD) AND 10.000 TONNES OF STRUCTURAL MATERIAL WITH STATIC HEAPS AND DYNAMICS. (English)
0 references
Identifiers
B27H16001300006
0 references