SECURE CONNECTIVITY (Q1874823): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
CONNECTIVITÉ SÉCURISÉE | |||||||||||||||
Property / summary | |||||||||||||||
AU COURS DE L’ANNÉE SCOLAIRE 201415 AVEC LE PROJET DONT ALLAVVISO PROT N 28002013 A ÉTÉ RÉALISÉ LE WIFI POUR LES CLASSES DE L’INSTITUT AVEC DES RÉSULTATS PARTIELS LE NOUVEAU PROJET DE CÂBLAGE DU RÉSEAU PERMET D’AMÉLIORER LA COUVERTURE DES INSTALLATIONS D’ENSEIGNEMENT À 100 CE PROJET TRAITE DE LA QUESTION DE LA SÉCURITÉ DU POINT DE VUE DE L’ÉCOLE ET LE MET EN ŒUVRE EN TENANT COMPTE DE LA FACILITÉ DE GESTION ET DE SUIVI AUSSI LE DIRECTEUR DE L’ÉCOLE PU S’APPUIE TOUJOURS SUR LE SOUTIEN SPÉCIALISÉ DE NOTRE HELP DESK QUI UTILISE ÉGALEMENT DES OUTILS DE CONTRÔLE À DISTANCE POUR LA SOLUTION INSTANTANÉE DES PROBLÈMES TECHNIQUES QUI SURGISSENT (French) | |||||||||||||||
Property / summary: AU COURS DE L’ANNÉE SCOLAIRE 201415 AVEC LE PROJET DONT ALLAVVISO PROT N 28002013 A ÉTÉ RÉALISÉ LE WIFI POUR LES CLASSES DE L’INSTITUT AVEC DES RÉSULTATS PARTIELS LE NOUVEAU PROJET DE CÂBLAGE DU RÉSEAU PERMET D’AMÉLIORER LA COUVERTURE DES INSTALLATIONS D’ENSEIGNEMENT À 100 CE PROJET TRAITE DE LA QUESTION DE LA SÉCURITÉ DU POINT DE VUE DE L’ÉCOLE ET LE MET EN ŒUVRE EN TENANT COMPTE DE LA FACILITÉ DE GESTION ET DE SUIVI AUSSI LE DIRECTEUR DE L’ÉCOLE PU S’APPUIE TOUJOURS SUR LE SOUTIEN SPÉCIALISÉ DE NOTRE HELP DESK QUI UTILISE ÉGALEMENT DES OUTILS DE CONTRÔLE À DISTANCE POUR LA SOLUTION INSTANTANÉE DES PROBLÈMES TECHNIQUES QUI SURGISSENT (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: AU COURS DE L’ANNÉE SCOLAIRE 201415 AVEC LE PROJET DONT ALLAVVISO PROT N 28002013 A ÉTÉ RÉALISÉ LE WIFI POUR LES CLASSES DE L’INSTITUT AVEC DES RÉSULTATS PARTIELS LE NOUVEAU PROJET DE CÂBLAGE DU RÉSEAU PERMET D’AMÉLIORER LA COUVERTURE DES INSTALLATIONS D’ENSEIGNEMENT À 100 CE PROJET TRAITE DE LA QUESTION DE LA SÉCURITÉ DU POINT DE VUE DE L’ÉCOLE ET LE MET EN ŒUVRE EN TENANT COMPTE DE LA FACILITÉ DE GESTION ET DE SUIVI AUSSI LE DIRECTEUR DE L’ÉCOLE PU S’APPUIE TOUJOURS SUR LE SOUTIEN SPÉCIALISÉ DE NOTRE HELP DESK QUI UTILISE ÉGALEMENT DES OUTILS DE CONTRÔLE À DISTANCE POUR LA SOLUTION INSTANTANÉE DES PROBLÈMES TECHNIQUES QUI SURGISSENT (French) / qualifier | |||||||||||||||
point in time: 10 December 2021
|
Revision as of 14:54, 10 December 2021
Project Q1874823 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | SECURE CONNECTIVITY |
Project Q1874823 in Italy |
Statements
7,500.0 Euro
0 references
7,500.0 Euro
0 references
100.0 percent
0 references
5 February 2016
0 references
15 December 2016
0 references
15 December 2016
0 references
IIS ROGGIANO G. "LS-ITI- ITC ALTOMONTE" EX I.S. "F. BALSANO"
0 references
NEL CORSO DELLANNO SCOLASTICO 201415 CON IL PROGETTO DI CUI ALLAVVISO PROT N 28002013 STATO REALIZZATO IL WIFI PER LE CLASSI DELLISTITUTO CON RISULTATI PARZIALI IL NUOVO PROGETTO DI CABLAGGIO DELLA RETE CONSENTIR DI POTENZIARE LA COPERTURA DELLE STRUTTURE DIDATTICHE AL 100 TALE PROGETTO AFFRONTA IL TEMA DELLA SICUREZZA DAL PUNTO DI VISTA DELLA SCUOLA E LA IMPLEMENTA TENENDO CONTO DELLA FACILIT DI GESTIONE E MONITORAGGIO INOLTRE IL DIRIGENTE SCOLASTICO PU CONTARE SEMPRE SUL SUPPORTO SPECIALISTICO DEL NOSTRO HELP DESK CHE UTILIZZA ANCHE STRUMENTI DI CONTROLLO REMOTO PER LA SOLUZIONE ISTANTANEA DELLE PROBLEMATICHE TECNICHE SOPRAGGIUNTE (Italian)
0 references
IN THE COURSE OF THE 201415 SCHOOL YEAR WITH THE PROJECT OF ALLAVISO, REF. NO 28002013, CONSTRUCTED WITH THE WIFI FOR THE DELLISTITUTO CLASSES WITH PARTIAL RESULTS, THE NEW CABLING PROJECT FOR THE NETWORK WILL ENABLE THE NEW CABLING PROJECT TO ENHANCE THE COVERAGE OF EDUCATIONAL STRUCTURES IN 100. THIS PROJECT WILL ADDRESS THE ISSUE OF SCHOOL SAFETY AND IMPLEMENT IT, TAKING INTO ACCOUNT THE MANAGEMENT AND MONITORING, IN ADDITION, THE HEAD OF THE SCHOOL CAN ALWAYS RELY ON THE SPECIALIST SUPPORT OF OUR HELP DESK, WHICH ALSO USES REMOTE CONTROL TOOLS FOR THE INSTANTANEOUS SOLUTION OF THE TECHNICAL PROBLEMS. (English)
0 references
AU COURS DE L’ANNÉE SCOLAIRE 201415 AVEC LE PROJET DONT ALLAVVISO PROT N 28002013 A ÉTÉ RÉALISÉ LE WIFI POUR LES CLASSES DE L’INSTITUT AVEC DES RÉSULTATS PARTIELS LE NOUVEAU PROJET DE CÂBLAGE DU RÉSEAU PERMET D’AMÉLIORER LA COUVERTURE DES INSTALLATIONS D’ENSEIGNEMENT À 100 CE PROJET TRAITE DE LA QUESTION DE LA SÉCURITÉ DU POINT DE VUE DE L’ÉCOLE ET LE MET EN ŒUVRE EN TENANT COMPTE DE LA FACILITÉ DE GESTION ET DE SUIVI AUSSI LE DIRECTEUR DE L’ÉCOLE PU S’APPUIE TOUJOURS SUR LE SOUTIEN SPÉCIALISÉ DE NOTRE HELP DESK QUI UTILISE ÉGALEMENT DES OUTILS DE CONTRÔLE À DISTANCE POUR LA SOLUTION INSTANTANÉE DES PROBLÈMES TECHNIQUES QUI SURGISSENT (French)
10 December 2021
0 references
Identifiers
I46J15001150007
0 references