TOWARDS THE UUTRO (Q1870433): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 04:12, 1 November 2020

Project Q1870433 in Italy
Language Label Description Also known as
English
TOWARDS THE UUTRO
Project Q1870433 in Italy

    Statements

    0 references
    14,194.0 Euro
    0 references
    14,194.0 Euro
    0 references
    100.0 percent
    0 references
    22 February 2016
    0 references
    29 December 2016
    0 references
    29 December 2016
    0 references
    C.D. "A. MANZONI"
    0 references
    0 references

    41°27'44.42"N, 15°32'35.02"E
    0 references
    IL PROGETTO RIVOLTO A TUTTI GLI ALUNNI DEL IX CIRCOLO MANZONI AGLI INSEGNANTI E AL PERSONALE ATALA SITUAZIONE ATTUALE DELLISTITUZIONE LA SEGUENTE NON ESISTE UN CABLAGGIO STRUTTURATO FILARE AD ECCEZIONE DEGLI UFFICI E DI 2 LABORATORI PER LE LIM E PER LE POSTAZIONI DIDATTICHE SI UTILIZZA UNA RETE WIRELESS RISULTA IMPOSSIBILE STANTE QUESTA SITUAZIONE INFRASTRUTTURALE GESTIRE I VARI ACCESSI CONTEMPORANEAMENTE IL REGISTRO ELETTRONICO E LE ATTIVIT DIDATTICHE PER CUI SI VERIFICANO FREQUENTEMENTE INTERRUZIONI E DIFFICOLT DI COLLEGAMENTO IL PRESENTE PROGETTO VUOLE ASSICURARE AI DOCENTI E AGLI ALUNNI UN ACCESSO PI AFFIDABILE E VELOCE PER FORNIRE A TUTTI LA POSSIBILIT DI SFRUTTARE COSTANTEMENTE LE RISORSE OFFERTE DALLA RETE SENZA INTERRUZIONI O LENTEZZE CHE NE COMPROMETTANO LUTILIZZO DIDATTICO QUOTIDIANO LINTERVENTO GARANTIR LA COPERTURA DEL 100 DELLE AULE E LABORATORI DELLA SCUOLA (Italian)
    0 references
    THE PROJECT AIMED AT ALL PUPILS FROM THE NINTH CLUB MANZONI TO TEACHERS AND ATALA STAFF AS IS THE CURRENT SITUATION OF THE INSTITUTION, THE FOLLOWING ONE DOES NOT EXIST WITH THE EXCEPTION OF THE OFFICES AND 2 LABORATORIES FOR THE LIM STATIONS AND FOR THE EDUCATIONAL STATIONS, A WIRELESS NETWORK IS IMPOSSIBLE IN VIEW OF THIS INFRASTRUCTURE SITUATION IN ORDER TO PROVIDE TEACHERS AND PUPILS WITH FAST, RELIABLE AND DIFFICULT IP ACCESS IN ORDER TO PROVIDE TEACHERS AND PUPILS WITH A RELIABLE AND FAST ACCESS TO THE NETWORK IN ORDER TO PROVIDE ALL THE POSSIBILITY FOR THE CONTINUOUS USE OF THE RESOURCES OFFERED BY THE NETWORK WITHOUT INTERRUPTION OR SLOWNESS THAT WOULD AFFECT THE USE OF THE RESOURCES OFFERED BY THE NETWORK WITHOUT INTERRUPTION OR SLOWNESS THAT WOULD AFFECT THE EDUCATIONAL USE OF THE NETWORK IN THE COURSE OF THE 100 COVERAGE OF THE CLASSROOMS AND LABORATORIES OF THE SCHOOL. (English)
    0 references

    Identifiers